Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20033F758 + (ML20033F758)
- ML20033F759 + (ML20033F759)
- 05000322/LER-1990-004, :on 900226,unplanned Actuation of ESF Primary Containment Isolation Sys Occurred During Implementation of Sys Layup.Caused by Procedural Error.Change to NS4 Slip Made to Correct Fuse Location + (ML20033F763)
- PY-CEI-NRR-1154, Forwards Master Table of Content Pages Inadvertently Omitted from Rev 2 to Updated FSAR + (ML20033F767)
- ML20033F770 + (ML20033F770)
- ML20033F771 + (ML20033F771)
- 05000352/LER-1990-007, :on 900222,high Radiation Reactor Protection Sys Actuation & Isolation Setpoints Set Outside Required Limits.Caused by Personnel Error by Nonlicensed Employee. Setpoints Adjusted & Personnel Counseled + (ML20033F774)
- ML20033F775 + (ML20033F775)
- ML20033F776 + (ML20033F776)
- BVY-90-037, Confirms Util Plans to Install Passive Containment Overpressure Protection Capability.Sys Will Be Designed Under 10CFR50.50 Rules & Installed During 1992 Refueling Outage + (ML20033F777)
- ML20033F778 + (ML20033F778)
- PY-CEI-NRR-1158, Application for Amend to License NPF-58,revising Tech Spec Surveillance Requirement 4.8.1.1.2.e.14.b Re Addl Div 3 Emergency Diesel Generator pull-to-lock Feature + (ML20033F780)
- ML20033F782 + (ML20033F782)
- IR 05000286/1990001 + (ML20033F783)
- ML20033F784 + (ML20033F784)
- ML20033F785 + (ML20033F785)
- 05000416/LER-1990-003-01, Corrected LER 90-003-01:on 900215,potential Single Failure Scenario Identified That Could Result in Unavailability of Both Core Spray Sys for post-LOCA Core Cooling.Detailed Heatup Evaluation Performed + (ML20033F786)
- ML20033F787 + (ML20033F787)
- ML20033F789 + (ML20033F789)
- IR 05000352/1990002 + (ML20033F791)
- 05000302/LER-1990-004, :on 900301,DHR Automatic Closure & Interlock Sys Design Did Not Meet Separation Criteria.Caused by Oversight by Contract Engineer & Inadequate Independent Review.Power Supply Will Be Modified + (ML20033F792)
- ML20033F793 + (ML20033F793)
- ML20033F794 + (ML20033F794)
- BVY-90-036, Forwards Supplemental Info to 1989 Primary Containment Leak Rate Test Rept,Justifying Test Duration of Less than 24 H & Clarifying Verification of Calculation,Per NRC Request + (ML20033F797)
- ML20033F798 + (ML20033F798)
- ML20033F799 + (ML20033F799)
- ML20033F801 + (ML20033F801)
- ML20033F802 + (ML20033F802)
- SNRC-1705, Provides Listing of Nuclear Property Insurance in Force for Facility,Per 10CFR50.54(w)(2) + (ML20033F803)
- ML20033F804 + (ML20033F804)
- ML20033F806 + (ML20033F806)
- IR 05000097/1990002 + (ML20033F807)
- ML20033F808 + (ML20033F808)
- ML20033F809 + (ML20033F809)
- ML20033F811 + (ML20033F811)
- ML20033F813 + (ML20033F813)
- PNO-II-90-016, on 900320,site Area Emergency at Facility Due to Loss of Offsite Power W/Concurrent Loss of Onsite Emergency Diesel Generator Capability.Caused by Truck Accident Onsite + (ML20033F814)
- ML20033F815 + (ML20033F815)
- ML20033F816 + (ML20033F816)
- ML20033F819 + (ML20033F819)
- ST-HL-AE-3395, Forwards Revised Organizational Chart Noting Changes to QA Program,Per 10CFR50.54(a)(3) + (ML20033F820)
- ML20033F821 + (ML20033F821)
- BECO-90-042, Lists Sources & Amounts of Financial Protection Carried by Licensee in Compliance w/10CFR50.54(w) + (ML20033F822)
- NRC-90-0058, Forwards Endorsement 9 to Maelu Certificate M-94 & Nelia Certificate N-94,Endorsement 130 to Nelia Policy NF-92, Endorsement 26 to Nelia Policy MF-120 & Endorsement 6 to Maelu NW-42 & MW-90 + (ML20033F823)
- ML20033F824 + (ML20033F824)
- ML20033F826 + (ML20033F826)
- ML20033F827 + (ML20033F827)
- ML20033F828 + (ML20033F828)
- ML20033F830 + (ML20033F830)
- ML20033F831 + (ML20033F831)
- ML20033F832 + (ML20033F832)