Notice of Violation from Insp on 900109-0226.Violation Noted:Second Svc Water Pump Not Secured on 900130 & 31 to Allow Continued Operation of Two Pumps When High Pressure in Svc Water Headers 31,32 & 33 Alarmed
ML20033F782
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 03/20/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20033F779 List:
References
50-286-90-01, 50-286-90-1, NUDOCS 9004030056
Download: ML20033F782 (2)


Text

.

?

APPENDIX A Notice of Violation i

New York Power Authority Docket No.

50-286 Indian Point Unit 3 Nuclear Power Plant License No. DPR-64 i

As a result of the inspection conducted on January 9 to February 26, 1990, and in accordance with NRC Enforcement Policy (10 CFR Part 2, Appendix C), the following violation was identified:

Technical Specification 6.8.1 requires that procedures be established and implemented for the procedures in Appendix A of Regulatory Guide 1.33.

Sections A and E of Appendix A include procedures for procedure adherence, temporary procedure changes, shif t turnover, log entries, and for correc-ting alarm conditions.

Administrative Procedure AP-4 requires that pro-cedures be followed and that temporary procedure changes be implemented when an approved procedure cannot be followed. Alarm response procedure ARP-12 part 22 requires that if a high pressure condition exists in ser-vice water header 31, 32, 33, the operator is to remove one service water pump from service if more than one is in service.

Operations directive 00-6 includes a shift relief and turnover checklist which requires that abnormal conditions on the control room panels be corrected or explained on the checklist.

Operations directive 00-5 requires that log sheet entries that exceed normal limits be circled and explained in the remarks section. 00-5 also requires that log book entries be made of significant operations, problems, abnormal indications or conditions.

1.

Contrary to the above, on January 30 and 31, 1990, when high pressure in ~ service water header 31, 32, 33 was alarmed, the second service water pump was not secured nor was a temporary procedure change pre-pared to allow continued operation of two pumps.

2.

Contrary to the above, on the 3-11 shif t on January 30 and the 11-7 shift on January 31, service water header 31, 32, 33 high pressure was not explained on the shift relief and turnover checklist, nor was this or any other abnormal condition circled and explained on the control room log sheets, nor was this condition and the component cooling water system leakage discussed in the senior reactor operator or shift supervisor's logs.

Collectively, these items constitute a Severity Level IV Violation (SupplementI).

OFFICIAL RECORD COPY IR IP3 90 0004.0.0 9004030056 900320 03/15/90

[DR ADock 05000286 PDC

n, Appendix A 2

Pursuant to the provisions of 10 CFR 2.201, the New York Power Authority is hereby required to submit to this office within thirty days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

I-i

-,5

)

k 0FFICIAL RECORD COPY IR IP3 90 0005.0.0 03/15/90