i L

e

's Commonweakh Edison

[

Dresden Nuclett Power Station L

v s

n.n. m

\\

,y Morris, Illinois 60450 Nd Telephone e16/042 2920 March 19, 1990 U.S. Nuclear Regulatory Comission Washington, DC 20555 ATTN: Document Control Desk EDE LTR 90-114

SUBJECT:

1989 Annual Report Dresden Nuclear Power Station Commonwealth Edison Company Dorket Nos. 050-010, 050-23 Land _D5D-2h2 i

Dear Sir Enclosed for your information is the 1989 Annual. Report of Chanau,

Tralh_a1d J xperimente ptr_10_CfA_39.d9 for Dresden Nuclear Power Station, Comonwealth Edison Company.

This report is submitted pursuant to Title 10, Code of Federal Regulations, Part 50, Section 50.59(b)(2).

Please note that beginning with calendar year 1989, all the information required by 10 CFR 50.59 has been submitted on a monthly basis as part of the monthly Operating Summary reports. Please direct any comunications concerning this report to G. Paramore, Technical Staf f System Engineer, extension 2364.

Sincerely.

.d

. D. Eepife burg Station Han er '

Dresden Nuc ear Power Station EDE GPidjh cc: A. Bert Davis INPO Records Center Regional Administrator M. Strait Directorate of Regulatory Operations G. Paramore Region III R. Tate U.S. Nuclear Regulatory Comission File / Tech. Staff 799 Roosevelt Road File /NRC Glen Ellyn, IL 60137 File / Numerical S. Dupont USNRC Region III Dresden Site Senior Resident Inspector i

Illinois Dept. of Nuclear Safety, State of Illinois Nuclear Licensing Administrator Vice President - BWR Operations General Manager - Nuclear Services Site Quality Assurance Superintendent Nuclear Engineering Managar Comptro11er's Office ZEDE/94 9004030045 891231 Ir PDR ADOCK 05000010

}

I R

PDC

+_

4 -

l-.

l 1989 ANNUAL REPORT SUf91ARY OF OPERATING EXPERIENCE, CHANGES, TESTS, AND EXPERIMENTS PER 10 CFR 50.59 FOR i

DRESDEN NUCLEAR POWER STATION COMMONWEALTH EDISON COMPANY f-UNIT DQCKEI LICENSE 1

050-010 DPR-2 2

050-237 DPR-19 3

050-249 DPR-15 i

ZEDE/94

IABLE OF COMTENTS 1

1.0 Introduction 2.0 Annual sununary of plant or procedure changes, tests and experiments.

I 2.1 Amendments to Facility Licenee or Technical Specifications j

(Units 2 and 3) j 2.2 Changes to Procedures Which are Described in the Final Safety l

Analysis Report (FSAR) (Units 2 and 3) 2.3 Significant Tests and Experiments Not Described in the FSAR (Units 2 and 3) 2.4 Completed Safety Related Modifications 2.5 Temporary System Alterations (Units 2 and 3) i e

i ZEDE/94 1l'

1.0 Introd:ction The Dresden Nuclear Power Station (DNPS) is a three-unit facility owned by Commonwealth Edison Company and located near Morris, Illinois. Unit 1, a General Electric Bolling Water Reactor with a design net electrical output rating of 200 megawatts electrical (MWe), is retired with all fuel removed from the reactor vessel.

Therefore, no Unit 1 operating data is provided within this report. Units 2 und 3 utilize General Electric Boiling Water Reactors and have an initial design net electrical output rating of 794 MWe. Waste heat is rejected to a man-made cooling lake using the Kankakee River for make-up and the Illinois river for blowdown. The architect-engineer for the Dresden Units was Sargent and Lundy.

The 1989 Annual _ Report of Changta d talas_and F.rperimenta_per 10 CER ES9 for Dresden_ Nuclear Power _EtationdDNPs). Consonwealth_idiann Cotopany (1989 DNPS 10 CFR 50.59 Report) is submitted to the Nuclear Regulatory Commission (NRC) pursuant to the requirements of Title 10, Code of Federal Regulations (10 CFR), Section 50.59(b)(2).

For each of the changes, tests, and experiments described herein, a safety evaluation was performed which determined that the change, test, or experiment did not constitute an unreviewed safety question.

This report was compiled by Gerrine Paramore of the Technical Staff, telephone number (815) 942-2920 extension 2364.

ZEDE/94

2.0 Annual Summary cf Plant er Pr:ceduro Chang:s, T;sts cnd Experiments.

e.'.

2.1.

Ammendments to Facility License or Technical Specifications for Unit 2 and Unit 3.

This section has been reported on a monthly basis in the l

Dresden Nuclear Power Station Monthly Operating Summary l

Reports (Sections 5.1.1 and 5.1.2) for January 1989 through i

December 1989.

i 1

2.2.

Changes to Procedures Which are Described in the Final 1

Safety Analysis Report (FSAR) (Units 2 and 3).

This section has been reported on a monthly basis in the Dresden Nuclear Power Station Monthly Operating Summary Reports (Section 5.2) for January 1989 through December 1989.

i 2.3.

Significant Tests and Experiments Not Described in the FSAR i

(.

(Units 2 and 3).

This section has been reported on a monthly basis in the i

Dresden Nuclear Power Station Monthly Operating Summary Reports (Section 5.3) for January 1989 through December 1989.

2.4.

Completed Safety Related Modifications (Units 2 and 3).

This section has been reported on a monthly basis in the l

Dresden Nuclear Power Station Monthly Operating Summary Reports (Section 5.5) for January 1989 through December 1989.

2.5.

Temporary System Alterations (Units 2 and 3).

l This Section has been reported on a monthly basis in the Dresden Nuclear Power Station Monthly Operating Summary Reports (Section 5.6) for January 1989 through December 1989.

1 I.

l ZEDE/94 y-