Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20032D145 + (ML20032D145)
- ML20032D147 + (ML20032D147)
- ML20032D148 + (ML20032D148)
- ML20032D150 + (ML20032D150)
- ML20032D151 + (ML20032D151)
- IR 05000416/1981040 + (ML20032D154)
- ML20032D155 + (ML20032D155)
- ML20032D156 + (ML20032D156)
- ML20032D157 + (ML20032D157)
- ML20032D158 + (ML20032D158)
- GO2-81-043, Final Deficiency Rept Re Unqualified Motors in Limitorque Dc Valve Operators W/Class B Insulation,Initially Reported on 801030.Valve Operators Will Be Replaced W/Porter Peerless Dc Motors from Velan Valve Co & Anchor Darling + (ML20032D159)
- ML20032D160 + (ML20032D160)
- TXX-3435, Submits Response Schedule for SER Outstanding Items + (ML20032D163)
- ML20032D167 + (ML20032D167)
- ML20032D169 + (ML20032D169)
- ML20032D171 + (ML20032D171)
- ML20032D172 + (ML20032D172)
- ML20032D173 + (ML20032D173)
- IR 05000328/1981041 + (ML20032D174)
- ML20032D175 + (ML20032D175)
- IR 05000320/1981014 + (ML20032D176)
- ML20032D178 + (ML20032D178)
- 05000339/LER-1981-078-03, /03L-0:on 811008-29,boron Concentration in Safety Injection Accumulator Went Higher than Max Limit.Caused by Inleakage Into Makeup Supply Header from Spent Fuel Pit. Boron Concentration Restored by Recirculation W/Rwst + (ML20032D179)
- 05000317/LER-1981-071-03, /03L-0:on 811005,received Group One Control Element Primary Deviation Alarm.Caused by Electronic Failure of Control Element Assembly 57 Individual Control Module. Panel de-energized Pending Supplier Repair & Analysis + (ML20032D182)
- ML20032D183 + (ML20032D183)
- ML20032D184 + (ML20032D184)
- 05000296/LER-1981-057, Forwards LER 81-057/03L-0 + (ML20032D185)
- ML20032D189 + (ML20032D189)
- FVY-81-145, Responds to NRC Re Violations Noted in IE Insp Rept 50-271/81-07.Corrective Actions:Revision to QA Program Issued to Identify That Radioactive Matl Packaging Requires QA + (ML20032D191)
- ML20032D192 + (ML20032D192)
- ML20032D193 + (ML20032D193)
- ML20032D194 + (ML20032D194)
- ML20032D197 + (ML20032D197)
- GO2-81-414, Final Deficiency Rept Re Debris & Foreign Matl Identified in safety-related Sys,Initially Reported 810925.Cleanliness Insps Not Performed.Supply Sys Will Perform Audits/ Surveillances + (ML20032D198)
- ML20032D199 + (ML20032D199)
- 05000296/LER-1981-057-03, /03L-0:on 811007,reactor Water Level Switch LIS-3-58D Switch 1 Was Found Outside Tech Spec Limits. Caused by Setpoint Drift.Switch Insp,Calibr & Successfully Tested + (ML20032D201)
- ML20032D204 + (ML20032D204)
- JAFP-81-1168, Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-333/81-18.Corrective Actions:Formal Training Conducted to Prevent Future Isolation of HPCI Steam Supply + (ML20032D206)
- W3P81-2344, Responds to NRC 810624 & 0930 Ltrs Re 10CFR50,App R Licensing Requirement & Implementation of Fire Protection Features.Amend to Fsar,Identifying Exceptions to App R Fire Protection Program,Will Be Provided by 811215 + (ML20032D207)
- ML20032D210 + (ML20032D210)
- IR 05000416/1981039 + (ML20032D212)
- GO2-81-402, Interim Deficiency Rept Re Concrete & Grouting Work, Initially Reported 810817.Contractor to Supply Documentation on Grouting.Microcoring Test Program Being Developed.Final Rept by 811215 + (ML20032D213)
- ML20032D214 + (ML20032D214)
- ML20032D215 + (ML20032D215)
- ML20032D217 + (ML20032D217)
- ML20032D218 + (ML20032D218)
- 05000317/LER-1981-073-01, /01T-0:on 811022,discovered That Component Cooling Isolation Valve Would Fail Open on Loss of Instrument Air. Valve Declared Inoperable.Caused by Request to Modify Valve Initiated in 1976 But Not Performed Until 811022 + (ML20032D219)
- ML20032D220 + (ML20032D220)
- ML20032D221 + (ML20032D221)
- ML20032D223 + (ML20032D223)
- ML20032D225 + (ML20032D225)