Forwards IE Insp Rept 50-328/81-41 on 810902-04.No Noncompliance Noted
ML20032D169
Person / Time
Site: Sequoyah 
Issue date: 10/19/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20032D170 List:
References
NUDOCS 8111130459
Download: ML20032D169 (2)


See also: IR 05000328/1981041

Text

-

.

OCT 191981

y N / ,,

Tennessee Valley Authority

V

~,

fg7/'h ,$

3

ATTN:

Mr. H. G. Parri s

&

'c

6f f'[4.f /

-

Manager of Power

500A Chestnut Street Tower II

UCP

Chattanooga, TN 37401

U

%

8 /g '

'

gis

cry'*am

Gentlemen:

g

4 %r

,j

6}i

Subject: Report No. 50-?28/81-41

/b

~-

This refers to the routine safety inspection conducted by Mr. H. L. Whitener of

this office on September 2-4, 1981, of activities authorized by NRC Operating

License No. DPR-79 for the Sequoyah facility and to the discussion of our

findings held with Mr. J . McGri f f,

Assistant Plant Superintendent, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or devia';ons were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

nation.

If your receipt of this letter has been delayed such that less than

uven days are available for your review, please notify this office promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sough, to be withheld shall be incorporated

as far as possible into a separt.te part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

8111130459

0

PDR ADOCK 0

PDR

ZEol-&

.

Tennessee Valley Authority

2

OCT 191981

Should you have any questions concerning this letter we will be glad to discuss

them with you.

Sincerely,

b/

R. C. Lewis, Chief

Reactor Projects Branch 1

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report No. 50-228/81-41

cc w/enti:

H. J. Green, Director of Nuclear Pcwer

G. G. Stack, Project Manager

C. C. Mason, Flant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Enire,r

H. N. Culver, Chief, Nuclaar Saf ety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Brand.

State of Tennessee

RII

RII

RIQ

M'

R

E

Whitener:ht

FJap[a10// /

CEharphy

. lshinski

RCrlenjak

RCLewis

'

10/g/81

10//k/81

10 S/81

10

/81

e4/81

/