ML20032D204

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/81-39 & 50-417/81-16 on 810928-1001.No Noncompliance Noted
ML20032D204
Person / Time
Site: Grand Gulf  
Issue date: 10/20/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20032D205 List:
References
NUDOCS 8111130500
Download: ML20032D204 (2)


See also: IR 05000416/1981039

Text

fou)

.

.

.

OCT 201981

-

, Ell /9 ' s

-

//

%x

Mississippi Power and Light Company

j- l f

[

'

ATTN:

Mr. N. L. Stampley

p

/

Vice President nf Production

t

g

-

t fl0V12 s ON , /

P. O. Box 1640

O

1

Jackson, MS 39205

g u.s. %NEEPa* lli

A

Centlemen:

g

Subject: Report NosQ

16/81-hd 50-417/81-16

I

y\\

This refers to the routine safety inspectiot conducted by Mr. A. B. P.uf f of this

office on September 28, 29, 30 and October 1, '.981, of activities authorized by

NRC Construction Permit hos. CPPR-118 and CPPR-119 for the Grand Gulf facility

and to the discussion of car findings held with Mr. J. W. Yelverton of your

staff, at the conclusion of the inspection.

Areas examined during the insoection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations o deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclcsed repo-t will be placed in the NRC's Public Document Room.

If the report contai 's any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intentior to

file a request for withr.olding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new 6 e date may be established.

Consistent with section 2.79t(b)(1),

such application must be accompanied by an affidavit evecuted by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, th report will be

placed in the Public Document Room.

ohjjg0

Pbg

TEot,4

,

T

%

O

'

'

OCT 201981

Mississippi Power and Light Ccmpany

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

A'C

R. C. Lewis, Director

Division of Resident and

Reacte 'roject Inspection

Enclosure:

Inspection Report Nt s. 50-416/81-39

and 50-417/81-16

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

RII

RI

R

RII

nII

At

al,blm.m

mCon,on

C ~ p h,

ma,>o,

eC<ewi,

_

10/ p/81

10)(/ 81

ltJ//6/81

10/y.0/81

10/go/81

10/g/81

7