U-0325..
L14-81(11-04)-L November 4, 1981-Mr. James G. Keppler hif Director,. Region III 8[-
N' T
Office of Inspection and Enforcement 2
4
)3 U.S. Nuclear Regulatory Commission
- g % g' h 799 Roosevelt Road u
Glen Ellyn, IL 60137
%g 6
}
7
Dear Mr..Keppler:
k
.k m
Deficiency 81-04 4 4,. _.
Inconsistencies in the Certifications l
for HVAC Materials (Zack) l On October 2, 1981, Illinois Power verbally notified Mr. H. M.
Wescott, NRC Region III, of a potential reportable deficiency per 10CFR50.55(e) concerning inconsistencies in the certification for l
Clinton Proj ect HVAC materials. (Zack).
Our investigation of this matter has not been completed, and this is to serve as'an interim report per 10CFR50.55(e)(3).
A l.
detailed analysis of the safety implications cannot be accomplished until the missing or corrected certifications have.
.been obtained and any nonconforming conditions identified for engineering. evaluations.
We anticipate that we will need approximately 60 days to complete our investigation of this potential deficiency and the determination of reportability.
f Sincerely,
&pdaL Fon L.U. Koch Vice President GWB/rlj cc:
H.H. Livermore, NRC Resident Inspector Director, Office'of I&E, USNRC, Washington, DC 20013 Director-Quality Assurance p7 S
/h eg113044381 104 s
ADock 0500o461 JEJ 7 Pnp NOV g 198i
_