Interim Deficiency Rept Re Inconsistencies in HVAC Certifications,Originally Reported on 811002.Investigation of Problem Not Completed.Approx 60 Days Needed to Complete Investigations
ML20032D156
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 11/04/1981
From: Koch L
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, L14-81(11-04)-L, L14-81(11-4)-L, U-0325, U-325, NUDOCS 8111130443
Download: ML20032D156 (1)


Text

,.

U-0325..

L14-81(11-04)-L November 4, 1981-Mr. James G. Keppler hif Director,. Region III 8[-

N' T

Office of Inspection and Enforcement 2

4

)3 U.S. Nuclear Regulatory Commission

- g % g' h 799 Roosevelt Road u

Glen Ellyn, IL 60137

%g 6

}

7

Dear Mr..Keppler:

k

.k m

Deficiency 81-04 4 4,. _.

10CFR50.55(e)

Inconsistencies in the Certifications l

for HVAC Materials (Zack) l On October 2, 1981, Illinois Power verbally notified Mr. H. M.

Wescott, NRC Region III, of a potential reportable deficiency per 10CFR50.55(e) concerning inconsistencies in the certification for l

Clinton Proj ect HVAC materials. (Zack).

Our investigation of this matter has not been completed, and this is to serve as'an interim report per 10CFR50.55(e)(3).

A l.

detailed analysis of the safety implications cannot be accomplished until the missing or corrected certifications have.

.been obtained and any nonconforming conditions identified for engineering. evaluations.

We anticipate that we will need approximately 60 days to complete our investigation of this potential deficiency and the determination of reportability.

f Sincerely,

&pdaL Fon L.U. Koch Vice President GWB/rlj cc:

H.H. Livermore, NRC Resident Inspector Director, Office'of I&E, USNRC, Washington, DC 20013 Director-Quality Assurance p7 S