Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20032C239 + (ML20032C239)
- ML20032C240 + (ML20032C240)
- ML20032C241 + (ML20032C241)
- ML20032C242 + (ML20032C242)
- ML20032C243 + (ML20032C243)
- 05000304/LER-1981-025, Forwards LER 81-025/03L-0 + (ML20032C245)
- ML20032C247 + (ML20032C247)
- ML20032C248 + (ML20032C248)
- ML20032C249 + (ML20032C249)
- 05000304/LER-1981-025-03, /03L-0:on 811003,during Cold Shutdown,Shiftly Grab Sample Was Not Taken for Pipe Tunnel Iodine Rad Monitor 2 RT-PRO7B.Caused by Personnel Failure to Review Surveillance Form.Personnel Reinstructed + (ML20032C250)
- ML20032C251 + (ML20032C251)
- ML20032C252 + (ML20032C252)
- 05000331/LER-1981-037, Forwards LER 81-037/01T-0 + (ML20032C254)
- ML20032C256 + (ML20032C256)
- ML20032C257 + (ML20032C257)
- 05000331/LER-1981-037-01, /01T-0:on 811017,during Valve Lineup Check,Main Steam Line Leakage Control Sys D Manual Valve V-84-16 Was Found Closed.Caused by Valving Error Due to Poor Lighting & Accessibility & Lack of Valve Labels.Lineup Performed + (ML20032C258)
- ML20032C259 + (ML20032C259)
- ML20032C260 + (ML20032C260)
- 05000346/LER-1981-060, Forwards LER 81-060/01T-0 + (ML20032C261)
- IR 05000298/1981016 + (ML20032C263)
- ML20032C264 + (ML20032C264)
- ML20032C265 + (ML20032C265)
- 05000346/LER-1981-060-01, /01T-0:on 811016,during Evaluation of Calibr on Hot Leg Temp Input to Reactor Protection Sys,Channels 2 & 4 Pressure/Temp Trip Setpoints Were Found Less Conservative than Tech Spec When Combined W/Max Postulated Inaccuracies + (ML20032C266)
- ML20032C267 + (ML20032C267)
- ML20032C268 + (ML20032C268)
- ML20032C271 + (ML20032C271)
- ML20032C272 + (ML20032C272)
- ML20032C275 + (ML20032C275)
- ML20032C276 + (ML20032C276)
- ML20032C277 + (ML20032C277)
- PNO-V-81-061, on 811102,15,000 Gallons of Borated Water Transferred from Refueling Water Storage Tanks to Condenser Hotwell.Caused by Failure of Valve to Close in three-inch Recirculation Line from Pump to Hotwell.Investigating Valve + (ML20032C278)
- ML20032C279 + (ML20032C279)
- ML20032C280 + (ML20032C280)
- 05000267/LER-1981-061, Forwards LER 81-061/03L-0.Detailed Event Analysis Encl + (ML20032C281)
- ML20032C283 + (ML20032C283)
- ML20032C284 + (ML20032C284)
- PNO-III-81-094, on 811103,unit Tripped from Full Power.Caused by Feedwater/Steam Flow Mismatch Due to Lube Oil Loss to One of Two Main Feedwater Pumps During Strainer Shifting.Repair Will Require Plant at Half Loop Status + (ML20032C285)
- ML20032C286 + (ML20032C286)
- 05000315/LER-1981-048, Forwards LER 81-048/03L-0 + (ML20032C287)
- ML20032C289 + (ML20032C289)
- 05000267/LER-1981-061-03, /03L-0:on 811002,total Dissolved Solids in Nonradiological Liquid Plant Effluent Exceeded Tech Spec Limits on Five Separate Occasions.Caused by Sudden Increase in Ratio of Total Dissolved Solids to Conductivity + (ML20032C290)
- 05000315/LER-1981-048-03, /03L-0:on 810929,during Surveillance Testing,Rhr Motor Operated Containment Isolation Valve ICM-111 Failed to Open from Control Room.Caused by Bypass Limit Switch Contacts Opening Prior to Valve Being Completely Unseated + (ML20032C291)
- ML20032C292 + (ML20032C292)
- ML20032C293 + (ML20032C293)
- ML20032C294 + (ML20032C294)
- ML20032C295 + (ML20032C295)
- ML20032C296 + (ML20032C296)
- FVY-81-153, Advises of Delay in Submittal of Proposed Augmented Inservice Insp Program.Rept Will Be Submitted by Mar 1982 + (ML20032C297)
- ML20032C298 + (ML20032C298)
- ML20032C299 + (ML20032C299)
- 2CAN108112, Discusses Interim Action to Reduce Consequences of Inadvertent Boron Dilution Event Re Review of Amend 24 to NPF-6,in Response to 810619 Request + (ML20032C301)