THE CINCINNATI GAS & ELECTRIC COMPANY cn CINCINN ATT.OHto 4520t E. A. BORGM ANN October 30, 1981 w.,c. v.c c..c s.oc.o QA-1533 NM/4)
U. S. Nuclear Regulatory Commission Region III
/S
',, ' '.g N
799 Roosevelt Road
/-
[ - -) v'd
/_S
(
Glen Ellyn. Illinois 60137 4
- ~,
NOVO G 19814 Attention:
Mr. J. G. Keppler, Director u.s.wxun exAten F g//
com un ces
'\\q\\,'/g RE:
WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 1I*
10CFR50.55(e) - ITEM M-16, ROSEMOUNT MODEL 1152 PRESSURE TRANSMITTERS - DOCKET NO. 50-358, CONSTRUCTION PERMIT CPPR-88, W.O. 57300, JOB E-5590. FILE NRC-8 Gentlemen, This letter constitutes an interim report under 10CFR50.55(e) regarding defects in Rosemount Model 1152 Pressure Transmitters.
Our letter, QA-1483, dated September 4, 1981, indicated an analysis was to be performed to determine whether or not systems containing such transmitters will experience extreme under or over pressured situations, thus causing ambiguous outputs.
This analysis has been performed but the results of this analysis have not been reported to CGSE. A definite report is anticipated to be availabl.e by January 31, 1982, at which time a report wi'l be submitted.
We trust this letter will fulfili the requirements of an interim report under 10CFR50.55(e).
Very truly yours, THE CINCINNATI CAS & ELECTRIC COMPANY By
(.j, "f'
E. A. BORGMANN SENIOR VICE PRESIDENT EAB/FKP/ejc cc: NRC Senior Resident Inspector Attn:
W. F. Christianson NRC Office of Inspection & Enforcement tea 7 Washington, DC 20555 O