Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009G798 + (ML20009G798)
- ML20009G801 + (ML20009G801)
- ML20009G803 + (ML20009G803)
- PNO-III-81-065, on 810730,while at Full Power,Main Condenser Sustained Massive Vacuum Leak.Plant Operators Reduced Power to 15%.Reactor Scrammed on Low RCS Pressure.Plant Will Remain Shut Down Until Leak Is Repaired + (ML20009G804)
- ML20009G805 + (ML20009G805)
- ML20009G806 + (ML20009G806)
- AECM-81-272, Forwards Complete Structural Checklist of Audit Conducted on 800317-21,per Structural Engineering Branch Request + (ML20009G807)
- ML20009G808 + (ML20009G808)
- ML20009G809 + (ML20009G809)
- ML20009G810 + (ML20009G810)
- ML20009G812 + (ML20009G812)
- ML20009G813 + (ML20009G813)
- ML20009G814 + (ML20009G814)
- ML20009G815 + (ML20009G815)
- ML20009G816 + (ML20009G816)
- ML20009G817 + (ML20009G817)
- ML20009G818 + (ML20009G818)
- ML20009G819 + (ML20009G819)
- ML20009G820 + (ML20009G820)
- ML20009G821 + (ML20009G821)
- ML20009G822 + (ML20009G822)
- ML20009G823 + (ML20009G823)
- ML20009G824 + (ML20009G824)
- ML20009G825 + (ML20009G825)
- ML20009G826 + (ML20009G826)
- AECM-81-255, Responds to 810304 Request for Emergency Procedure 05-5-01-EP-10, Reactivity Control. Procedure Provides Required Operator Action in Event of ATWS & Incorporates BWR Owners Group Recommendations + (ML20009G827)
- ML20009G828 + (ML20009G828)
- ML20009G829 + (ML20009G829)
- ML20009G830 + (ML20009G830)
- ML20009G831 + (ML20009G831)
- ML20009G832 + (ML20009G832)
- ML20009G833 + (ML20009G833)
- ML20009G834 + (ML20009G834)
- ML20009G835 + (ML20009G835)
- 0CAN078110, Forwards Info Re Util Compliance W/Criteria Given in Reg Guides 1.58 Revision 1 & 1.146,in Response to Generic Ltr 81-01 Concerning Qualification of Insp,Exam & Testing & Audit Personnel + (ML20009G836)
- ML20009G837 + (ML20009G837)
- 05000206/LER-1981-016, Forwards LER 81-016/01T-0.Detailed Event Analysis Submitted + (ML20009G839)
- ML20009G841 + (ML20009G841)
- 05000206/LER-1981-016-01, /01T-0:on 810711,immediately Following Unit Shutdown,Both Personnel Airlock Doors Were Simultaneously Open 12 Minutes.Caused by Misaligned Locking Mechanism Due to Damaged Cam Followers.Damaged or Worn Parts Replaced + (ML20009G842)
- ML20009G843 + (ML20009G843)
- 05000206/LER-1981-014, Forwards LER 81-014/03L-0.Detailed Event Analysis Submitted + (ML20009G844)
- 05000206/LER-1981-013, Forwards LER 81-013/99X-0.Detailed Event Analysis Submitted + (ML20009G846)
- PNO-III-81-064, on 810719,while Attempting to Conduct Bldg Leak Rate Test Using Sgts,Extensive Damage Resulted to Roof.Improper Combination of Supply & Exhaust Fans May Have Caused Damage + (ML20009G848)
- 05000206/LER-1981-014-03, /03L-0:on 810630,erroneous Feedwater Flow Indications Produced Indicated Power Levels Below Actual Levels.Caused by Feedwater Flow Orifice Installed Backwards on One Line & Excessive Vibration on Other + (ML20009G849)
- 05000206/LER-1981-013-99, /99X-0:on 810618,power Operated Relief Valve Controller Opened Twice During Normal Pressure Transient Following Reactor Trip.Caused by Setting Time Constant to Off to Satisfy NUREG-0737,Item II.K.3.9 + (ML20009G850)
- 05000266/LER-1981-009, Forwards LER 81-009/01T-0 + (ML20009G851)
- ML20009G852 + (ML20009G852)
- 05000266/LER-1981-009-01, /01T-0:on 810714,per IE Bulletin 80-11 Analyses, Contractor Reported That Four Control Room & Two Battery Room Walls Did Not Meet Revised Criteria for Seismic Event. Caused by Reanalysis Per Revisions.Supports Installed + (ML20009G853)
- 05000295/LER-1981-032, Forwards LER 81-032/03L-0 + (ML20009G854)
- ML20009G856 + (ML20009G856)
- 05000295/LER-1981-032-03, /03L-0:on 810629,RCS Charging Pump 1A Balancing Drum Line Was Found Leaking from Circumferential Indication Upstream of Weld Connecting Line to Suction of Pump Casing. Caused by Vibration of Drum Piping.Piping Repaired + (ML20009G858)