Responds to Generic Ltr 81-21, Qualification of Insp,Exam, & Testing & Audit Personnel. Util & Vendor Will Certify QA Personnel Per ANSI N45.2.6 & Reg Guide 1.58 Provisions. Response Addresses Const Stage Only
ML20009G825
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 07/31/1981
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GL-81-21, SBN-177, NUDOCS 8108050099
Download: ML20009G825 (2)


Text

.

b

'N N comp =nv or r*= H=mp=Nr=

EBR00KSTATIm Engineering Office:

1671 Worcester Road Framingham, MA 01701 July 31,1981 SBN - 177 o.

D T.F. B 5.3.99 f

gcs' s

4 ger United States Nuclear Regulatory Commission k, h g 5h.

Washington, D.C. 20555 1-j gy3

,s.

E[1 Attention:

Mr. Darrell G. Eisenhut, Director fy f(f7 Division of Licensing 3

Office of Nuclear Reactor Regulation

/

f6 s

References:

(a) Construct)on Permits CPPR-135 cad CPPR-136, Docket Nos.

50-443 and 50-444 (b) USNRC Generic Letter 81-21 dated May 4,1981, "Quali fica tio.: of Inspection, Examination, and Testing and Audit Personnel" Sub je ct : Response to USNRC Generic Letter F1-21

Dear Mr. Eise nhut :

As you are well aware, Seabrook Station Unit 1 and Unit 2 are under construction. The scheduled construction corpletion for Unit 1 is opproximtely 28 conths from the date of this letter. Therefore, our response to Reference (b) wi'.1 address only the construction stage for Seabrook. The Seabrook FStR will address activities during the preoperational testing, startup and operational phases which are still under development.

Public Service Coopany of New Hampshire Seabrook QA personnel who perform the inspectioas, examina tions or test functions as specified in Regulatory Guide 1.58, Revision 1 - September 1980, will be certified in a-cordance with the prnei>. ions of ANSI N45.2.6-1978 subject to regulatory positions C.5, C.6, C.7, C.P.a.d C.10 of Regulatory Guide 1.58, Revisicn 1.

Please note that during the construction phase, inspections and examinations are primarily performed by the NSSS vendor (Westinghcuse) or contractors for the construction managers (United Engineers and Const*uctors). Wes tinghouse complies with the provisions of Regulatory cuide 1.58, Revision 0 with the clarifications and alternatives identified in their approved Topical Report WCAP-8370, Revision 9.

UE&C and site contractors comply with the provisions of Regulatory Guide 1.58, Revision 1 es follows:

The requirements of ANSI N45.2.6, " Qualification of Inspection, Exanination, and Testing Personnel for the Construction Phase of Nuclear Power Plants," are complied with for the BOP by requiring that all contractors and fabricaters meet the requirements of SNT ' 0-1A,

" Recommended Practice for Nonder tructive Testing Personnel Qualification 0

f

$ ql$

PDR Ii

p U.S. Nuclear Regulatory -Commission July 31, 1981

~

Attention:

Mr. Darrell G. Eisenhut, Director Page 2 and Certification." All personnel engaged in the performance or

' evaluation of nondestructive examination were qualified in accordance with S NT-T C-1A.-

Qualification requirements for other than nondestructive examination personnel bere complied with, with the exception of:

a.

Several of the vendors who contracted 'to produce items prior to 1.he imposition of ANSI N45.2.6 in procurement documents. These vendors had satisfactory alternste qualification programs.

b.

_ Revision 1, Position 6 of this Regulatory Guide requices a High School Graduate or having earned a General Education Development equivalent for all levels. We have' allowed experience, and on the job training in lieu of this requirement Regarding Regulatory Guide 1.146, Revision 0 - August 1980, Seabrook Station QA procedures w111 be revised by Augus t 1,1981, and Seabrook audit personnel will be'recertified to the provisions of this Regulatory Guide. United

- Engineers and Constructors and Westinghouse also comply with this Regulatory _

Guide.

United Engineers has also imposed this Regulatory Guide on all major site contractors. We do not anticipate imposing the provisioas of this Regulatory Guide upon suppliers.

Very truly ours, f

-or: John'DeV neentTs I

' Project Manager ALL/sec

+

t m

v y

y r-m-,--,*

9%

v-e-w--

-y-p

-ww---

9 yr,-

g

.tmer--qw a--

9 9

y7 yy yyy3

-g me-s.

9-py pyyy e y u-

'