Forwards Addl Info Re Structural Design,Per NRC 810622 request.W/915 Aperture Cards & Drawing List.Aperture Cards Are Available in PDR
ML20009G805
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/24/1981
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19268A405 List:
References
2234N, NUDOCS 8108050029
Download: ML20009G805 (50)


Text

.

r^ '

Commonwealth Edison

[

) One First National Plaza, Chicago, lllinois i

~~

, address R: ply to: Post Offica Box 767 Chicago, Illinois 60690 sn-July 24, 1981 s

Mr. Harold R. Denton, Director

/

Office of Nuclear Reactor Regulation I h6 9\\

4 190' U.S. Nuclear Regulatory Commission m

0 F-l Washington, DC 20555

~f

Subject:

Byron Station Units 1 and 2

/

h/

Braidwood Station Units 1 and 2

~

Additional Information Regarding Structural Design NRC Docket Nos. 50-454/455/456/457 Reference (a):

June 22, 1981, letter from R.

L. Tedesco to J. S. Abel.

Dear Mr. Denton:

Enclosed is information requested in reference (a) regarding the structural design of Byron and Braidwood Stations.

Attachment A to this letter identifies the information required to satisfy each of the three specific requests.

Attachment B lists each of the drawings that are enclosed with this letter.

One (1) signed original and fifty-nine (59) copies of this letter and Attachment A are provided for your use.

Seven (7) copies of Attachment B and one copy of the drawings are enclosed.

One (1) copy of the letter, the attachments and the drawings are being sent directly to EG&G Idaho.

Please direct further questions regarding this matter to this office.

Very truly yours, 7/2,%

p,.c, T.R.

Tramm h6g g

Nuclear Licensing Administrator Attochments Y

Mgdf N{

cc:

Tom Bridges, EG&G Idaho 1m 0$

sh 223aN h

g 6

8108050029 810724 PDR ADOCK 05000454 A

PDR

9" 1

4 July 24, 1981 ATTACHMENT A Additional Information for Byron /Braidwood Independent Structural Analyyis Information_ Request #1 All the drawings, schedules, and lists necessary for defining all structural load bearing walls and columns, structural properties, dimensions, and locations for the Byron /Braidwood Nuclear Plant auxiliary, turbine, fuel handling and radwaste Buildings.

Enclosed are one set of microprints for EG&G and one set of aperture cards for NRC of the Structural and Architectural drawings indicated on the drawing list contained in Attachment B.

These drawings define all structural aspects of the Auxiliary, Fuel Handling, Radwaste and Turbine Buildings.

Information Request #2 Drawings or lists defining floor loading equipment loading and design live loading for all floors of the auxiliary, turbine, fuel handling and radwaste buildings).

The previous transmittal of information and drawings (July 3,

1980, letter from W. F. Naughton to H. R. Denton) is complete for defining floor loading in the Auxiliary, Turbine, Fuel Handling and Radwaste Buildings.

Information Request #3 Properties of soil between Braidwoot Station auxiliary fuel handling building complex foundation and bedrock necessary for determining soil shear springs and mass.

In addition, soil spring constants and soil mass values used by Sargent & Lundy engineers for their horizontal seismic analysis of the auxiliary, turbine, fuel handling, and radwaste building complex are requested.

The soil properties between Braidwood Station's building foundation and bedrock necessary for determining shear springs and mass are given in FSAR Tables 2.5-26, 2.5-29 and in FSAR Figures 2.5-7;.

2.5-79.

The soil spring constants used in the Braidwood horizontal seismic analysis are given in Table 1 enclosed.

The soil mass values are given in terms of soil height, area and density using FSAR Tables 2.5-27 and 2.5-28.

2234N

f,

TADLE 1 ASSOCIATED SOIL DATA USED IN BRAIDWOOD HORIZONTAL

' SEISMIC MODEL Elev. of Top Approximate Soil Soil Soil Spring of Foundation Soil Plan Location Height Area Constant *

(f t)

(f t x f t)

(k/ft) 367'-0" 8 to 10, L to O 6

30 x 83 440,000 26 to 28, L to O 6

31 x 83 428,000

~

16

'31 x 33 66,000 377'-0" 4 to 6, P to Q 6 to 8,

L to Q 15,5 45 x 83 240,000 28 to 31, L to Q 11 77 x 83 579,250 385'-0" 15 to 21, V,9 to Y 19 49 x 94 220,200 387'-6" 1 to 5, G to J 20.83 57 x 91 757,106 31 to 35, G to J 20.83 57 x 91

_.,106 4015-O

15 to 21, Y to BB 35 86 x 104 233,600 37 to 45, G to L 34 91 x 146 1,012,904 1 to 4, J to L 37 38 x 97 99,832 1 to 2, G to J 37 25 x 57 35,976 1 to 12, C to G 37 88 x 262 585,126 12 to 24, C to E 37 50 x 165 207,036 24 to 31, C to G 37 90 x 150 335,876 31 to 37, E to G 37 41 x 159 149,810 35 to 37, G to J.

37 48 x 63 102,840 c

31 to 37, J to L 37 41 x 159 139,692 y

U 1

  • Soil spring constant assumed in North-South and East-West Directions.

[

?

4 e

I L

I, c

ATTACHMENT B List of Drawings Provided for Byron /Braidwood Independen! Structural Analysis 2334N

' July 21, 1981 BYRON /BRAIDWOOD INDEPENDENT STRUCTURAL ANALYSIS Inf ormatica Request #1 All tha drawings, schedules, and lists necessary for defining all structural load bearing walls and columns, structural properties, dimensions,

and locations for the Byron /Braidwood Nuclear Plant auxiliary, turbine, f uel handling, and radwaste Buildings.

Enclosed are one set of microprints for EG&G and one set of aper-ture cards for NRC of the Structural and Architectural drawings indicated on the enclosed drawing list.

These drawings define

~

all structural aspects of the Auxiliary, Fuel Handling, Radwaste and Tur bine Buildings.

Information Request #2 Drawings or lists defining floor loading (e qui p-ment loading and design live loading for all floors of the auxiliary, turbine, f uel handling, and radwaste buildings).

The previous transmittal of information and drawings in July, 1980, is complete for defining floor loading in the Auxiliary, Turbine, Fuel Handling and Radwaste buildings.

Information Request #3 Properties of soil between Braidwood Station auxiliary fuel handling building complex founda-tion and bedrock necessary for determining soil shear springs and mass.

In addition, soil spring constants and soil mass values used by Sargent and Lundy engineers for their horizontal seismic analysis of the auxiliary, turbine, f uel handling, and radwaste building complex are requested.

a.

The soil properties between Braidwood Station's building foundation and bedcock necessary for determining shear springs and mass are given in FSAR Tables 2.5-26, 2.5-29 and in FSAR Figures 2.5-77, 2.5-79.

b.

The soil spring constants used in the Braidwood horizontal seismic analysis are given in Table 1 enclosed.- The soil mass values are given in terms of soil height, area and density using FSAR Tables 2.5-27 and 2.5-28.

s TABLE 1 ASSOCIATED SOIIi DATA USED IN BRAIDWOOD HORIZONTATi

' SEISMIC MODEL

'~

Elev. of Top Approximate S0il Soil Soil Spring of Foundation Soil Plan Location Height Area Constant *

(f t)

(f t x f t)

(k/ft) 367'-0" 8 to 10, I. to O 6

30 x 83 440,000 26 to 28, L to Q 6

31 x 83 428,000 16 31 x 33 66,000 377'-0" 4 to 6, P to O 6 to 8, L to Q 15.5 45 x 83 240,000 28 to 31, L to Q 11 77 x 83 579,250 385'-0" 15 to 21, V.9 to Y 19 49 x 94 220,200 387'-6" 1 to 5, G to J 20,83 57 x 91 257,106 31 to 35, G to J 20.83 57 x 91 257,106 401'-0" 15 to 21, Y to BB 35 86 x 104 233,600 37 to 45, G to L 34 91 x 146 1,012,904 1 to 4, J to L 37 38 x 97 99,832 1 to 2, G to J 37 25 x 57 35,976 1 to 12, C to G 37 88 x 262 585,126 12 to 24, C to E 37 50 x 165 207,036 24 to 31, C to G 37 90 x 150 335,876 31 to 37, E to G 37 41 x 159 149,810 35 to 37, G to J.

37 48 x 63 102,840 4

31 to 37, J to L 37 41 x 159 139,692 5

N j

  • Soil spring constant assumed in North-South and East-West Directions, g,

r 4

w

.,-e, vw,-

r

M

  1. 2h C

4 D,4A* JING 1 IST STRUCTU3AL DFP Aff t Mt NT DA1E f WJf M 1 I AFI 7.'

STRUCTURAL SECTION COMMONWEALTH EDISON BTRON/BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/46R3-4684 SAFETY DRAWING TITLE REV REV OATE STATUS SPEC.

DATE CLASS.

flo.

DATE ISSUED No.

ArrROVEn

' ~

--G-T '

m'*-

=

"'m Tn n -. r v-

,i-,

r P '

4'"

,i j m..p-R

^

h J

R 5.4 s /

l uk t; l f dl ROOM CON' RE ll LULUMN SCHtVULL UNIIS 1 & 2 I

U 17t A Y d ')

O PAA Y TJ LUtr l. RLV.

UNU 4/5 R

S-499 TURDINE ROOM FOUNDATION TOP REINF. PLAN EL.369-0 D

25AUG77 25 Aufi77 RECORD 220CT75 Uf AI T 1 R

S-500 TURBINE ROOM FOUNDATION TOP REINF. PLAN EL.369-0 E

03FFB78 03FEB78 RECORO 220CT75 UNIT 2 R

S-501 TURBINE ROOM FOUNDATION BOT. REINF. PLAN EL.3G9-0 0

25AUG77 25AUG77 RECDDD 220CT75 UNfT 1 R

S-M2 TURGINE ROOM FOUNDATION BOT. REINF. PLAN EL.369-0 B

01 MAP 76 01 MAR 7G CONST. RFV.

220CT75 Of JI T 2 N

5-503 TURB!!JE ROOM FOUNDATION TOP REINF. PLAN EL.401-0 B

190CT76 190CT7G CONST. REV.

28NOV75 UNIT 1 N

S-504 TURBINE ROOM FOUNDATION T0r REINF. PLAN EL.401-0 B

190CT7G 190CT76 CONST. REV.

2 erJOV75 UNIT 2 N

5-505 TUR8INE ROOM FOUNDATION BOT. REINF. PLAN EL.401-0 B

190CT7G 190CT76 CONST. REV.

28NOV75 UNIT 1 N

S-50G TURBINE ROOM FOUNDATION BOT. REINF. PLAN EL.401-0 0

190CT76 190CT76 CONST. REv.

28 tJOV 75 UNIT 2 N

S-510 TURBINE ROOM FOUNDATION BASEMENT D

10MAv76 10MAv7G CONST. REV.

070CT75 FLCOR PLAN EL.369-0 AREA 2 UNIT 1 R

S-511 TURBINE ROOM FOUNDATION BASEMENT FLODR PLAN E

10MAY76 10MAY7G CONST. REV.

070CT75 EL. 369-0 AREA 1 UNIT 1 R

S-512 TURCINE ROOM FOUNDATION BASEMENT FLOOR PLAN F

1GJUN76 16JUN76 C0f 4SI. REV.

070CT75 EL. 3G9-0 AREAS 3 & 4 UNIT 1 R

S-513 TURBINE ROOM FOUNDATION BASEMENT FLOOR PLAN L

13 fed 80 13FE080 CONST R!.V 070CT75 EL. 3G9-0 AREA 5 UNIT 1 N

S-514 TURBINE '400M FOUNDATION BASEMENT FLOOR PLAN L

08DEC76 080EC76 CONST. REV.

070CT75 EL. 369-0 AREA 6 UNIT 1 R

S-515 TURBINE ROOM FOUNDATION BASEMENT FLOOR PLAN L

13FE080 13FE380 CONST REV 070CT75 EL. 3G9-0 AREA 7 UNIT 2 N

5-516 TURDINE ROOM FOUNDATION BASEMENT FLOOR PLAN d

080EC76 OCDEC76 RFCORU 070CT15 EL. 3G9-O AREA 8 UNIT 2 R

S-517 TUR8INE ROOM FOUNDATION BASEMENT FLOOR PLAN H

31 DAN 79 31JAN79 CONST. REV.

070CT75 EL. 369-0 AREAS 9 & 10 UNIT 2 R

S-518 TURBINE ROOM FOUNDATION BASEMENT FLOOR PLAN F

30AUG7S 30AUG71 CONST. REV.

070CT75 EL. 369-0 AREA 11 UNIT 2 N

S-519 TURBINE ROOM FOUNDATION BASEMENT F

010CT7G 010CT7G RECOPD 070CT75 FLOOR PLAN EL. 3G9-0 AREA 12 UNIT 2 N

5-525 TURBINE ROOM GROUND FLOOR FRAMING PLAN V

1CMAR81 18 MAR 81 RECORD 15SEP75 EL. 401-0 AREA 1 UNIT 1 N

S-52G TURBINE ROOM GROUND FLOOR FRAMING PLAN N

21NOV80 21NOV80 CONST. REV.

28NOV75 EL. 401-0 AREA 2 UNIT 1 R

S-527 TURBINE ROOM GROUND FLOOR FRAMING PLAN AA 30APR81 30APR81 CONST. REV.

2PNOV15 co EL. 401-0 AREA 3 UNIT 1 N

S-528 TURBINE ROOM GROUND FLOOR FRAMING PLAN d

28HOV77 28NOV77 RECORD 2ernV75 c9 EL. 401 0 AREA 4 UNIT 1 SARGENT ^ LUNDY L

_ammerna

(.

40 M

r i

DRAVING LIST STRUCTURAL DEPARTMENT DATE OG3081 PAGE 33

  • f STRUCTURAL SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOD Uf4ITS 1 & 2 PROJECT NOS 4391-4392/4G83-4G84 i

SAFETY ORAWING TITLE REV REV OATE STATUS SPEC.

DATE DATE ISSUED NO.

APPROVED CI ASS.

No.

R S-529 TURBTNE ROOM GROUND FLOOR FRAMING PLAN AK 06dVN80 06JUN80 RECORD 2Ett0V75 EL. 401-0 AREA 5 UNIT 1 3

N S-530 TURBINE ROOM GROUND FLOOR FRAMING PLAN AG 3OOCT79 300CT79 CONST. REV.

28NOV75 i

i EL. 401-0 AREA 6 UNIT 1 R

S-531 TURBINE ROOM GROUND FLOOR FRAMING PLAN U

18 MAR 81 18 MAR 81 RECORD 28NOV75 EL. 401-0 AREA 7 UNIT 2 N

S-532 TURBINE ROOM GROUND FLOOR Fli AMING PL AN AD 18 MARS 1 18 MAR 81 RECORD 2SNOV75 EL. 401-0 AREA 8 UNIT 2 R

S-533 TURBINE ROOM GROUND FLOOR FRAMING PLAN S

06dWN80 06 dun 80 CONST. REV.

28N0/75 EL. 401-0 AREA 9 UNIT 2 N

S-534 TURBINE ROOM GROUND FLOOR FRAMING PLAN E

2tdAN77 21 DAN 77 FAB REV 28NOV75 EL. 401-0 AREA 10 UNIT 2 N

S-535 TURBINE ROOM GROUND FLOOR FRAMING PLAN P

13FEB81 13FEB81 RLCORD 2SNOV75 EL. 401-0 AREA 11 UNIT 2 N

5-53G TURBINE ROOM GROUND FLOOR FRAMING PLAN E

190C1/6 190CT7G RECORD 28HOV75 EL. 401-0 AREA 12 UNIT 2 N

5-537 TURBINE ROOM GROUND FLOOR FRAMING PLAN K

13 DOL 78 13 DOL 78 CONST. REV.

15SEP75 EL. 401-0 ARFA 13 UNIT 2 N

S-538 TURBINE ROOM GROUND FLOOR iRAMING PLAN N

21NOV80 21NOV80 CONST. REV.

15SEP75 EL. 401-0 AREA 14 UNIT 2 N

S-539 TURBINE ROOM SECTIONS & DETAILS M

28APR78 28APR78 FAB REV 18FEB77 UrJI T S 1&2 N

S-540 TURBINE ROOM FOUNDATION K

30APR81 30APR81 CONST. REV.

22SEP7G SECTIONS & DETAILS UNITS 1&2 N

5-541 TURBINE ROOM FOUNDATION SECTIONS & DETAILS L

24 DUN 80 24 DUN 80 CONSI. RiV.

22f1AR70 UNITS 1 &2 N

S-542 TURBINE ROOM FOUNDATION SECTIONS & DETAILS G

13SEP78 135EP78 RECORO O2 MAR 76 UNITS 1 &2 N

S-543 TURBINE ROOM SECTIONS & DETAILS N

17 DAN 80 17 DAN 80 CONST REV 220CT75 UNITS 1&2 N

S-544 TURBINE ROOM FOUNDATION - SECTION 1-1 UNIT 1 E

09dul76 09JUL76 RECORD 220CT75 N

5-545 TURBINE ROOM FOUNDATION - SECTION 1-1 UNIT 1 H

28APR78 28APR78 CONST. REV.

220CT75 N

5-546 TURBINE ROOM FOUNDATION - SECTION 1-1 UNIT 2 E

30SEP76 3CSEP76 CONS 1, REF.

220CT75 N

5-547 TURBINE ROOM FOUNDATION - SECTION 1-1 UNIT 2 E

080CT76 080CT76 CONST. REV.

220CT75 N

5-548 TURBINE ROOM FOUNDATION - SECTION 2-2 UNIT 1 F

290EC78 290EC78 FOR RECORD 220CT75 N

S-549 TURBINE ROOM FOUNDATION-SECTION 4-4 UNIT 1 F

24dul79 24dul79 CONST. REV.

220CT75 N

S-550 TURBINE ROOM FOUNDATION-5ECTION 4-4 UNIT 1 F

29 MAR 78 29HAR78 CONST. REV.

220CT75 N

5-551 TURBINE ROOM FOUNDATION-SECTION 4-4 UNIT 2 P

30APR81 30APR81 CONST. REV.

220CT75 N

S-552 TURBINE ROOM FOUNDATION-SECTION 4-4 UNIT 2 G

06dVN80 06dONSO CONST. REV.

220CT75 a)g R

S-553 TURBINE ROOM FOUNDATION SECTIONS & DETAILS E

130EC77 13DEC77 CONST. REV.

220CF75 m

UNITS 1&2 SARGENTMUNDY "ENutNEE ftU.

t g

DRACING LIST STRUCTURAL DEPARTMENT DOTE 063091 PAGE 34 STRUCTURAL SECTION COMMONWEALTH EDISON 4

BYRON /BRAIDWOOD UNITS 1 & 2 PR0dECT NOS 4391-4392/4GR3-4G84 SAFETY DRAWING TITLE REV REV DATE STATUS SPEC.

DATE CLASS.

NO.

DATE ISSUED NO.

APPROVED

-R S-554 TURBINE ROOM SECTIONS & DETAILS F

25 MAR 77 25 MAR 77 CONST. REV.

15SEP75 UNITS 1 &2 N

5-555 TURBINE ROOM FOUNDATION F

22FEB77 22FEB77 C0t451. REV.

220CT75 SECTION 24-24 & 25-25 UNITS 1&2 N

5-556 TURBINE ROOM FOUfJDATION G

080EC76 080EC76 FOR RECORD 220CT75 SECTIOra 27-27 UNIT 1 R

S-557 TURBINE ROOM FOUNDATION F

28NOV77 28NOV77 C0f aST. REV.

220CT75 SECTION 27-27 8 28-28 UNITS 1 & 2 R

S-558 TURIGINE ROOM FOUNDATION F

290EC78 290EC78

'OR RECURD 220CT75 SECTION 29-29 UNIT 1 N

S-559 TURBINE ROOM FOUNDATION F

080EC76 08DEC76 FOR RECORD 220CT75 SECTIONS & DETAILS UNITS 1&2 N

S-560 TURBINE ROOM FOUNDATION C

10MAY76 10MAY76 CONST. REV.

2?OCT15 SECTIONS & DETAILS UNITS 1&2 N

S-561 TURidNE ROOM FOUNDATION SECTIONS & DETAILS M

01MAY79 01MAY79 CONST. REV.

2*NOV75 UNITS 1&2 N

S-562 TURBINE ROOM FOUNDATION E

21 DAN 77 21 DAN 77 CONST. REV.

220CT75 SECTIONS & DETAILS UNITS 1 &2 R

S-5G3 TURBINE ROOM FOUNDATION SECTION 70-70 & 71-71 H

30APR81 30APR81 CONST. REV.

220CT75 UNITS 1&2 N

5-564 TURBINE FOUNDATION PLAN EL. 451-0 UNIT 1 K

07DEC78 07DEC78 RECORD 16 MAR 76 N

S-5GS TURBINE FOUNDATION TOP REINFORCING PLAN F

O2AUG78 02AUG78 CONST. REV.

tGMAR76 UNIT N

5-566 TURBINE FOUNDATION BOTTOM REINFORCING PLAN E

01NOV76 J1NOV76 CONST. UV.

16 MAR 76 UNIT 1 N

5-567 TURBINE FOUNDATION - SECTION 1-1 C

01NOV76 01NOV7G CON.

REV.

1GMAR76 UNIT 1 N

S-560 TURBINE FOUNDATION - SECTION 2-2 B

01NOV76 01NOV76 C0f4ST. REV.

2rFEB76 UNIT 1 N

S-569 TURBINE FUUNDATION - SECTION 3-3 H

01MAY79 01MAY79 FOR RECORD 2OrEC76 UNIT 1 N

S-570 TURBINE FOUNDATION - ELEVATION 4-4 H

01MAY79 01MAY79 FOR RECORD 20FEB76 UNIT 1 N

S-571 TURBINE FOUNDATION - SECTIONS 5-5 & 6-6 G

041.UG77 04AUG77 FOR RECORD 20FEB76 UNIT t N

S-572 TURBINE FOUNDATION - SECTIONS 7-7 8 8-8 F

13JUL78 13JUL78 FOR RECORD 20FEBiG UNIT 1 N

S-573 TURBINE FOUNDATION - SECTION 9-9 & ELEVATION 10-10 G

OtMAY79 01MAV79 FOR RECORD 20FEB76 UNIT 1 N

S-574 TURBINE FOUNDATION SECTIONS & DETAILS UNITS 1 & 2 C

27MAV77 27MAY77 C0tJS T. REV.

14JUN76 N

S-575 TURBINE FOUNDATION - SECTION 11-11 UNIF 1 C

01NOV76 01NOV76 CONST. REV.

16 MAR 76 N

S-576 TU2BINE FOUNDATION SECTIONS & DETAILS UNITS 1&2 E

07DEC78 07DEC78 FOR RECORD 20FEB76 N

S -ST/

TURBINE FOUNDATION ANCHOR BLOCK DETAILS C

15NOV76 15NOV76 CONST. REV.

17MAY7G UNITS 1&2 eg N

5-578 TURBINE ROOM FOUNDATION E

17FEB77 17FEB77 CONST. REV.

09FEB7G CONDENSER PIER DETAILS UNITS 1 & 2 n

SARGEflT%LUflDY

> E NGINE Ef1G.

08 M

g e

DRAWING LIST STRUCTUSAL DEPARIMLNT DATE m2091 par.I J'a STRUCTURAL SECTION COMMONWEALTH EDISON BYRON /BRAIOWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4G83-4684 SAFETY DRAWING TITLE REV REV DATE STATUS SI' E C.

DATE CLASS.

NO.

DATE ISSUED NN.

APFROVED N

S-579 TURBINE FOUNDATION SECTIONS & DETAILS B

15NOV7G 15NOV7G CONST. REV.

14 dun 7G UNITS 1 &2 f4 5-580 TURBINE ROOM FOL'NDATION-CONDENSER PIER A

2OJUL7G 2OJUL76 CONSIPUCTION

' 2OJU L "'6 ANCHUR BOLT LOCATION PLAN UNITS 1 &2

""W Z_

~ ' ~

.__T

_n -

T~

}' ~ -

Q N

S-588 HEAIER BAY GROUND FLOOR FOUNDATION PLAN EL.401-0 H

200EG78 290EC7H FOR RI COf'D 2PNOV/5 AREA 1 UNIT 1 N

5-589 HEATER BAY GROUND FLOOR FOUNDATION PLAN EL.401-0 L

2OJUN77 2OJUN77 CONST. REV.

2HNOV75 AREA 2 UNIT 1 N

S-590 HEATER BAY GROUND FLOUR FOUNDATION PLAN EL.401-0 J

2OJUN77 2OJUN77 CONST. REV.

2 8tJOV 75 AREA 3 UNIT 2 N

5-591 HEATER BAY GROUND FLOOR FOUfJDATION PLAN EL.401-0 G

13FEB81 13FEB01 CONST. REV.

28NOV75 AREA 4 UNIT 2 N

S-593 HEATER BAY FOUNDATION V

01MAY79 01MAY79 CONST. REV.

28NOV75 SECTIONS & DETAILS UNITS 1&2 N

S-594 HEATEP BAY FOUNDATION N

07DEC78 07DEC78 FOR RECORD 28tJOV75 SFCTIONS & DETAILS UNITS 1&2 N

S-595 TURBINE ROOM FOUNDATION - SECTION 3-3 UNIT 2 C

04AUG77 04AUG77 FOR RECORD 2F.NOV75 N

S-59G TURBINE ROOM FOUNDATION G

27FEB78 27FEB78 CONST. REV.

220CT?S SECTIONS & DETAILS UNITS 1 &2 N

S-597 HEATER DAY FOUNDATION J

25AUG77 25AUG77 FOR RECORD 28 tJOV75 SECTIONS & OETAILS UNITS 1&2 N

S-598 TUR3f tJE ROOM FOUNDATION F

28SEP77 2BSEP77 FOR RECORD 08DEC75 SFCTIONS & DETAILS UNITS 1 &2 N

S-600 RA0 WASTE / SERVICE BUILDING COMPLEX E

130EC77 13DEC77 CON 5T. REV.

OBJUL7G 10P REINFORCING PLAN EL. 401-0 UNITS 1&2 N

S-601 RADWASTE/ SERVICE BUILDING COMPLEX E

130EC77 130EC77 CONST. REV.

08JUL7G BOTTOM REINFORCING PLAN EL. 401-0 UNITS 1&2 N

S-602 RADWASTE/ SERVICE BUILDING COMPLEX D

150CT76 150CT76 CONST. REV.

08JUL7G TOP REINFORCING PLAN EL. 401-0 UNITS 1&2 N

5 603 RADWASTE/ SERVICE BUILDING COMPLEX E

05JUL78 05JUL78 CONST. REV.

OSJUL76 BOTTOM REINFORCING PLAN EL. 401-0 UNITS 1&2 N

S-609 RADWASTE/ SERVICE BUILDING COMPLEX J

28AUG80 28AUG80 coils T. REV.

09NOV7G BLOG RAMP-PLANS & SECTIONS UNITS 1 & 2 N

S-G11 RADWASTE/ SERVICE BUILDING COMPLEX 0

24SEP76 24SEP76 CorJS T. REV.

15 DUN 7G RADWASTE TUNNEL FDN PLAN.EL. 388-0 UNITS 1 &2 N

S-612 RADWASTE/ SERVICE 'iUILDING COMPLEX N

05 MAR 81 05 MAR 81 CONST. REV.

15JUN7G RA0 WASTE TUNNEL FDN PLAN 0 SECTIONS UNITS 1&2 N

S-613 RADWASTE/ SERVICE BUILDING COMPLEX GROUND F'_00R R

18SEP78 18SEP78 CONST. REV.

08JUL76 FOUNDATION PLAN EL. 40 -O AREA 1 UNITS 1&2 N

S-G14 RADWASTE/ SERVICE RUILDING COMPLEX GROUND FLOOR N

28NOV77 28NOV77 FAB REV 08JUL7G FOUNDATION PLAN EL. 401-0 AREA 2 UNITS 1&2 N

S-615 RADWASTE/ SERVICE BUILDING COMPLEX GROUND ELEVATION T

05MAY81 05MAYB1 RFCORD 08JUL76 FRMG PLAN EL. 401-0 AREA 3 UNITS 1&2 o

O N

S-G16 RADWASTE/ SERVICE BUILDING COMPLEX GROUND FLOOR U

05MAY81 05MAY81 CONST. RFV.

08 DOL 7G S

FRAMING PLAN EL. 397-0 AREA A UNITS 1&2 SARGEtlT2"LUflDY

' F NGIPEE f1G

49 g

g

\\

DRAWING LIST STRUCTURAL TEPARTMEI4T DATE M3OR1 PAGF 3G STRUCTUPAL SECTI0tJ COMMONWEALTH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4331-4342/4683 4684 SarETY DRAWING TITLE REV REV DATE STAIUS SPfC.

DAtE DATE ISSUED NO.

APPR0yrn CLASS.

NO.

N S-618 RADWASTE/ SERVICE BUILDING COMPLEX TUNNEL ROOF M

14 MAR 80 14MARRO CONSikUCT IOtJ 15JutJ7G FRAMING PLAN EL. 396-8 UNITS 1&2 N

S-619 RADWASTE/ SERVICE BUILDING COMPLEX TutJNEL ROOF L

OSMAR81 05 MAR 81 RECORD 15JUN76 FRAMING PLAN SECTIONS & DETAILS UNITS 1 &2 N

S-620 RADWASTE BUILDING OOCK ENCLOSURE PLANS C

05SEPRO 05SEP80 CONST. REV.

14MARSO SECTIONS & DETAILS UNITS 1 &2 N

S-621 RADWASTE/ SERVICE BUILDING COMPLEX FLOOR C

05MAY81 05MAV81 CONST. LV.

15dAH81 FRAMING PLAN EL 410'-O

AREA 4 UNITS 1&T N

S-622 RADWASTE/ SERVICE BUILDING COMPLEX SECTIONS C

05MAv81 05MAv81 CCNST. REV.

15dANS1 UNITS 1&2 N

S-623 RADWASTE/ SERVICE BUILDING COMPLEX MISC. PLANS B

05 MAR 81 05 MAR 81 CONST. REV.

15d AtJS 1 SECTIONS & DETAILS UNITS 1&2 N

S-624 RACWASTE/ SERVICE BUILDING COMPLEX SECTIONS C

05MAY81 05MAY81 CONST. REV.

t$ DAN 91 UNITS 1 &2 N

5-625 RADWASTE/ SERVICE BUILDING COMPLEX A

.5 DAN 81 15 DAN 81 FOR RECORD 15dAtJ81 SECTIONS & DETAILS UNITS 1&2 N

S-627 RADWASTE BUILDING DOCK ENPLOSURE C

OtAUG80 01AUG80 CONST. REV.

14 MAR 80 ROOF PLAN. SECTIONS & DETAILS UNITS 1 82 N

S-628 RADWASTE BUILDING DOCK ENCLOSURE C

OtAUGEO 01A*JC80 CONST. REV.

14 MAR 80 GIRT FRAMING UNITS 1&2 N

S-640 RADWASTE/ SERVICE BUILDING COMPLEX M

14 MAR 80 14 MAR 90 CONSTRUCTION 25AUG7G SECTIONS & DETAILS SHEET 3 UNITS 1&2 N

S-641 RADWASTE/ SERVICE BUILDING COMPLEX F

13JAN78 13 DAN 78 CONST. REV.

07FFB77 SECTIONS & DETAILS SHEET 4 UNITS 1 & 2 N

S-G42 RADWASTE/ SERVICE BUILDING COMPLEX P

05MAY81 05 MAYS 1 CONST. REV.

27JUN77 SECTIONS & DETAILS SHEET 5 UNITS 1&2 i

N 5-644 RADWASTE/ SERVICE BUILDING COMPLEX P

05 MAR 81 05 MAR 81 RECORD OBJUL76 SECTION 1-1 UNITS 1 82 N

S-645 RADWASTE/ SERVICE BUILDING COMPLEX P

05 MAR 81 05 MARS 1 RECORD 08dUL7G SECTION 2-2 UNITS 1&2 N

S-646 UADWASTE/ SERVICE BUILDING COMPLEX L

250CT79 250C779 CONST. REV.

OSJUL7G SECTION 3-3 UNITS I&2 N

5-647 RADWASTE/ SERVICE BUILDING COMPLEX P

05 MAR 81 05 MAR 81 CONST. REV.

OPJUL76 SECTION 4-4 UNITS 1&2 N

S-651 RADWASTE/ SERVICE BUILDING COMPLEX SECTIONS &

P 14 MAR 80 14 MAR 80 CONSTRUCTION 08JUL76 DETAILS SHEET 1 UNITS 182 N

S-652 RADWASTE/ SERVICE BUILDING COMPLEX H

13DEC77 130EC77 CONST. REV.

08JUL76 SECTIONS & DETAILS SHEET 2 UNITS 1&2 R

S-653 AUXILIARY BUILDING CONCRETE COLUMN SCHEDULE E

210CT77 210CT77 CONST. REV.

07JUL75 SHEET 1 UNITS 1&2 R

S-654 AUXILIARY BUILOING CONCRITE COLUMN SCHEDULE K

2?OCT80 220CT80 RECORD 07JUL75 SHEET 2 UNITS 1&2 R

S-655 AUXILIARY BUILDING CONCRETE COLUMN SCHEDULE E

31AUG76 31AUG76 CCM%T. REV.

02SEP75 SHEET 3 UNITS 1 & 2 R

S-656 AUXILIARY BUILDING GIRDER SCHEDULE D

01MAV78 OtMAY78 FAB REV 17 PAY 76 SHEET 1 UNITS 1 & 2 R

S-657 AUXILIARY BUILDING GIRDER SCHEDULE E

23NOV77 23tJOV77 FAB RL7 2OAPR76 e

SHEET 2 UNITS 1 & 2 g

R S-658 AUXILIARY BUILDING GIRDER SCHEDULE E

23NOV77 23NOV77 FAB REV 17MAY76 m

SHECT 3 UNITS 1 & 2 SARGEND 1. UNDY J ENDINFFFtfi

50 g

O L

DRAWING LISV STRUCTURAL UEPARTMENT LATE OG3091 l' A G E 37 STRUCTURAL SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOD UNITS 1& 2 PROJECT NOS 4391-4392/46n3-4G84 3AFETY DRAWING TITLE REV REV DATE STATUS SPEC.

D ?. t F CLASS.

NO.

DATE ISSUED NO.

APPLUVfD R

S-659 AUXILIARY BUILDING GIRDER SCHEDULE D

23NOV77 23NOV77 FAB REV 20APR7G SHEET 4 Ut4tTS 1 &2 R

S-660 aux!LIARY BUILDING GIRDER SCHEDULF D

10DEC7G 100FC7G FAR RFV 09dt JL 76 SHEET 5 UNITS 1&2 R

S-669 AVAILIARY BUILDING GIRDER SCHEDULE D

09JUL7G 09JUL76 FAB Rrv 20APR7G SHEET G UNITS 1 & 2 R

S-662 AUXILIARY BUILDING GIRDER SCHEDULE B

08NOV76 08NOV76 FAB REV 09JUL76 SHEET 7 UNITS 1 & 2 R

S-GG3 AUKILIARY BUILDING FOUNDATION MAT TOP H

1GJUL76 1GJUL76 CONST. REV.

07JUL75 RE INFORCING PLAN l'NI TS 1 &2 R

S-664 AUXILIARY BUILDING FOUNDATION MAT TOP H

16JUL7G 16JUL7G CONST. RFV.

07JUL75 REINFORCING PLAN UNITS 1 &2 R

S-665 AUXILIAR1 BUILDING FOUNDATION MAT BOTTOM G

16JUL76 16 DOL 76 COriST. REV.

07JUL75 REINFORCING PLAN UNITS 1 &2 R

S-666 i.UXILIARY BUILOING FOUNDATION MAT BOTTOM F

1GJUL7G 16JUL76 CONST. REV.

07JUL75 REINFORCING PLAN UNITS 1&2 R

S-667 AUXILIARY BUILDING GIRDER SCHEDULE D

2GJAN77 26JAH77 FAB RFV 03MAv76 SHEtT 8 UNITS 1 &2 R

S-668 AUXILIARY BUILDING GIRDFR SCHEDULE C

2GJAN77 26 DAN 17 FAB RFV 25JUN7G SHEET 9 UNITS 1 &2 R

S-670 AUXILIARY BUILDING ESSENTIAL SERVICE WATER PUMP J

01JUL80 01JUL80 C0 tis t. REV.

07JUL75 ROOM EL. 330-0 UNITS 1&2 R

S-671 AUXILIARY BUILDING ESSENTIAL SERVICE WATER PUMP J

2OJ A fl78 2OJAN78 CONST. REV.

07JUL75 ROOM EL. 330-0 UNITS 1&2 R

S-G72 AUXILIARY BUILOING FOUNDATION PLAN EL. 346-0 AE 13FEB81 13FEB81 RECORD O2SEP75 AREA 2 UNITS 1&2 R

S-G71 AUXILIARY BUILDING FOUNDATION PLAN EL. 346-0 AA 10 MAR 81 194AR89 RECORD 02SEP75 AREA 3 UNITS 1&2 R

S-G74 AUXILIARY BUILDING (OUNDATION PLAN EL. 346-0 X

18DEC78 18DEC78 FOR RECORD 02SEP75 AREA 5 UNIT 1 R

S-675 AUXILIARY BUILDING FOUNDATION PLAN EL. 346-0 AA 01 Al%dO 01APR90 CONST. REV.

02SEP75 AREA G UNITS 1 & 2 R

S-67G AUXILIARY BUILDING FOUNDATION PLAN EL. 346-0 L

18DEC78 180EC78 FOR RECORD O2SEP75 AREA 7 UNIT 2 R

S-677 AUXILIARY BUILDING FOUNDATION PLAN EL. 343-0 J

04NOV76 04NOV76 FOR RECORD 02SEP75 AREA 5 6 7 UNITS 1 &2 R

S-678 AUXILTARY BUILDING FLOOR F9AMING PLAN EL. 357-0 J

22FEB78 22FFB78 RECORD 02 SIP 75 AREA 6 UNITS 1 &2 R

  • S-679 AU'.ILIARY BUILDING FLOOR FRAMING PLAN EL. 364-0 AE 05dtJ4d 1 05JuiJS 1 RtCDPD 07NOV75 sGEA 2 UNITS 1&2 R

S-680 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 3G4-0 AB 15 DAN 81 15 DAN 81 FOR RECORO 01NOV75 AREA 3 UNITS 1 &2 R

S-681 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 364-0 V

30APR81 30APR81 RECORD 07NOV75 AREA 5 UNIT 1 R

S-682 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 364-0 W

07NOV80 07NOV80 CONST. REV.

07NOV75 AREA 6 UNITS 1&2 R + S-683 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 364-0 V

05JUN81 05JUN81 RECORD 07NOV75 AREA 7 UNIT 2 to Q

R S-684 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 364-0 K

22FEB78 22FEB78 RECORD 07NOV7b AREA 5 & 7 UNITS 1&2 n

SARGENTn LUNDY

a U1 O

O DRAT?!NG LIST STRliCTURAL DEPARIMEMT O!.TE m>3091 PW 3H STRUCTURAL SECT:0N COMMONWFALTH EDISON BYRON /C'tAIDWOOD UNI TS 1 & 2 PROJECT NOS 4391-4392/4683-4G84 SAFETY DRAWING TITLE REV REV DATE STATUS SPfC.

DAIE CLASS.

NO.

DATE ISSUED NU.

APFROVED R

S-685 AUXILIARV BUILDING FLOOR FRAMING PLAN EL. 374-0 P

15 DAN 31 15 DAN 91 FOR RECORD 0740V75 AREA 5 'JNIT 1 R

S-68G AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 374-0 N

15 DAN 31 15dAH31 FOR PECORD 07t:0V 75 AREA 7 UNIT 2 R

S-687 AUXILIARY BUILDING FLOOR PLAN EL. 374-0 K

24JAN79 24 DAN 79 CONSI. REV.

0 7 t l0 V 7'.

AREA 5 f. 7 UNITS 1 & 2 R

S-688 AUXILIARY CUILDING TUNNEL FOUNDATION PLAN R

O2AUG78 02AUG78 CONSI. REV.

23APR7G EL.377-0 AREA 1 UNITS 1 & 2 R

S-689 AUXILIARY (>dILDING TUNNEL FOUNDATION PLAN Et. 377-0 L

16 MAR 78 (GMAR78 FABRICATION 07NtLY76 AREA 4 UNITS 1 &2 R

  • S-G9O AUXILIARY BUILDING 7LOOR FRAMING PLAN EL. 383-0 AJ 05JUN81 05JUN31 CONST. REV.

08 DAN 76 AREA 2 UNITS 1&2 R

  • S-691 AUXILIARY BUILDING FLOOR FP WING PLAN EL. 383-0 AU O2JUN81 02 DON 31 CONST. REV.

O'? J A N 7 6 A'"A 3 UNITS 1&2 R

S-642

  • "/. I L I A R Y BUILDING FLOOR FRAMING PLAN EL. 383-0 M

2tNOV80 21No no RECORD 07NA(76 AREA 4 UNITS 1 &2 R

S-693 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 383-0 N

19 MAR 81 19 MAR 81 RECORD 09JAN76 AREA G UNITS 1 &2 R

S-694 Al'9 3 I ARY BUILDING FLOOR FRAMING PL AN EL. 391-6 H

10 DAN 77 10 MN77 CONST. REV.

ORJAN76 APiA ' UNITS 'I &2 R

S-696 AlrI*CARY BUILDING FLOOR FRAMING PLAN EL. 401-0 AB 13FEC81 13rFCSt RECORD

'JAPR76 ARCA i UNITS 1 &2 R = S-696 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 401-0 AW 05JUN81 05GN91 CONST. REV.

28JAN76 AREA 2 UNITS i &2 R

  • S-697 AUXILIARY 9UILDING FLOOR FRAMING PLAN EL. 401-0 AR 05JUNB1 05JUN91 CONST. REv.

28 DAN 76 AREA 3 VNTit '&2 R

S -'N9 AUXILIARV CV1. DING FLOOR FRAM! W PLA9 EL.

01-0 AB 07NOV80 07NOV80 LONST. REv.

07MAY7G AREA 8 U2W i *. 1 &2 R

S-699 AU! < ;iRY CUILDING FLOOR FRAMINa kLAN h.

.50 1-0 AC 3OAPR81 30APR81 RECORD 29 DAN 76 M.E A li UNIT 1 R

S-700 AUXILIARY CUILDING FLOOR FRAMING Pl>N EL. 401-n V

15AUG80 15AUGBO CONST. RFV.

28JAN7G AREA 6 UNITS 1&2 R

S-701 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 401-0

/. T 19 MAR 81 19 MAR 81 RECORD 28dA476 AREA 7 UNIT 2 R

S-702 AUv i LI ARY BO." DING FLOOR FRAMING PLAN EL. 401 O D

23AUG7P 23AUG78 CONST. REV.

28 DAN 76 AREA 5 & 7 UNITS 1 & 2 R

S-703 AURILIARY BUILDING FLOOR FRAMING PLAN EL. 376-6 C

24SEP76 24SEP76 CONST. REV.

23APR76 AREA 5A 7 UNITS 1&2 R

S-704 AUXILIARY BUILDING TUNNEL. FLOOR FRAMING PLAN R

15 DAN 81 t5 DAN 91 FOR RECOPD

')2".0075 EL.354*-4" UNITS 1&2 R

  • S-705 AUXILIARY BUILDING MISC. FLOOR FRAMING N

02JUNS1 02JUN91 CONST. REV.

3 %CT7' PLANS UNITS 1&2 R

S-70G AUXILIARY BUILDIw: TUNNEL FLOOR F'2AMING PLANS P

1*DEC70 110EC79 CONST. REV.

0". 9V; 5 fL.374-6 & EL.394-0 UNITS 1 &2 m75 R + S-707 AUXILIARY BUILDING TUNNEL FLOOR FRAMING PLANS P

O2JUf M 1 02JUNSI CONST. REV.

EL. 375-6 & EL. 394-6 UN!YS i&2 R

S-708 AUXILIARY BUILDING TUNNEL FLOOR FRAMING PLANS T

19 MAR 81 19 MAR 81 RECORS 07NOVis e

AT EL. 376-0, 391-6 & 392-4 UNITS 1&2 Q

R S-709 AUXILIARY BUILDING TUNNEL FOUNDATION PLAN H

26 DAN 77 2GJAN77 CON',1.

R[V.

?1AfR76 m

EL. 367-0 AREA 1 UNITS 152

-I

! SARGENT LUNDY L

nN O t NTF3M

52 b

ORAUING LIST STRUCIURAL DEPARIMENT DATE 06300t PAGI W

STRUCTURAL SFCTION COMMO.NE ALTH EDISON BVRON/BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4331-4392/JGR3-4G34 SAFETY DRAWshK; TITLE REV REV DATE STATUS SPEC.

DATE CLASS.

NO.

DATE ISSUF.D tJO.

APPROVEU R

S-710 AU(ILIARY BUILDING TUNNEL. FOUNDATION PLAN G

29NOV7G 23NOV76 CONST. REV.

07MAf76 EL. 367-0 AREA 4 UNITS 1&2 R

S-711 AUXILIARY BUILDING TUNNEL FRAMING PLANS F

05JUN78 05JUN78 CONST. REV.

07tMV75 EL. 338-6 5 379-6 AREA 5 UNIT t R

S-712 AUXILIARY BUILDING TUNNEL FRAMING PLANS E

05JUN78 05JUN78 CONST. REV.

(A!JW75 j

EL. 380-6 & 3'9-6 AREA 7 UNIT 2 R

S-713 AUXILIARY BUILDING R

21NOV80 2tNOV90 RECORD 2G7E37G I

SECTIONS & DETAILS UNIIS 1 &2 R

S-714 AUXILIARY BUILDING SECTIONS M

21NOVBO 21NOV80 RECORD 1erAv76 UNITS I &2 l

R S-715 AUXILIARV BUILDING FOUNDATION M

09JUN90 09JUN90 CONST. REV.

07NOV75 SECTION 1-1 AREA 4 SHEET 1 UNITS I&2 R

S-716 AUKILIARY BUILDING FOUNDATION U

22APR80 22APR80 CONST. REV.

1GAUG7G SECTION 1-t UNITS 1 & 2 R

S-717 AUXILIARY BUILDING FOUPOATION AA 30APR81 30APR81 CON 31. REV.

07JUL75 SECTION 1-1 UNITS 1&2 R

S-718 AUXILIARY BUILDING FOUNDATION AM 1? MAR 81 19MARRt RECORD 28JAN70 SECTION 1-1 Ut4ITS 1&2 R

S-720 AUKILIARY BUILDING FOUNDATION AB 01JUL80 OfJULBO CONST. REV.

07JUL/5

=

SECTION 1-1 UNITS 1 & 2 R

S-721 AUXILIARY BUILDING FOUNPATION AM 28AUGSO 28AUGPO CONST. k t' V.

28 8AN76 SECTION 1-1 UNITS 1&2 R

S-723 AU(ILIARY BUILDING FOUNDATION N

050CT73 050CT79 CONST. REV.

MAPR76 SECTION 1-I AREA 1 SHEET 1 UNITS 1 & 2 R

S-724 AURILIARY BUILDING FOUNDATION V

22APR60 22APRSO CotJS t. RE4.

WAUG76 SECTIOf4 1-1 UNITS 1&2 R

S-725 AUXILIARY BUILDIf4G MISC. PLANS B

15JUL80 15JUL80 CON"T. REV.

2C+EB80 SECTIONS & DETAILS UNITS 1&2 R

S-72G AUXILIARY BUILDING FOUNDATION N

15 DAN 81 15 DAN 31 FOR RECORD 02:4 075 SECTION 2-2 UNITS 1 & 2 R

S-727 AUXILIARY BUILDING FOUNDATION L

23SEP80 23SEP80 C0f4ST. REV.

16AUG76 SECTION 2-2 UNITS 1&2 R

S-728 AUXILIARY BUILDING FOUNDATION AC 23SEPBO 23SEP80 CONST. REV.

07JUL75 j

i SECTION 2-2 UNITS 1&2 R

S-721 AUXILIARY EUILDING FOUNDATION Z

13FEB81 13FEB81 RECORD 2BJAN76 SECTION 2-2 UNITS 1&2 R

S-731 AUFILIARY BUILDING FOUNDATION W

15 DAN 8t 15dANSt 50k RECORD 07JULV5 i

SECTION 2-2 UNITS 1 &2 R

  • S-732 AUXILIARY BUILDING FOUNDATION V

05JUN'31 05JUNSt CONST REV.

28dAH76 SECTION 2-2 UNITS 1 & 2 R

S-734 AUXILIARY BUILDING FOUNDATION G

16 MAR 78 1GMAR78 F ABfe lCAT j uta 07 f.tA Y 76 SECTION 2-2 UNITS 162 R

5-735 AUXILIARY BUILDING FOUNDATION M

23JANSO 23JAN80 CMU REV 16AUG76 SECTION 2-2 UNITS 1 & 2 i

R + S-736 AUXILIARY BUILDING FOUfJPATION S

05JUN81 05JUN31 C0tisT. REV.

210CT77 SECTION & OETAILS UNITS 1&2 R

S-737 AUXILIARY BUILDINC FOUNDATION T

15JANSt 15JANEf FOR RECORD 02SEP75 SECTION 3-3 UNITS 1 & 2 ro Q

R S-738 AUXILIARY BUILDING FOUNDATION AF 30APR81 30APR81 RECORD 28 DAN 76 m

SECTION 3-3 UNITS 1&2 SARGENT/1. UNDY mum

1 g

53 A

DAIF e GJ r.t P A(.I

.ti n DRAWING LIST STRUCTURAI. DEPARIMFHf STRUCTURAL SECTION COMMONWEALTH EDISDN BYl'ON/BRAIDWCOD Uf4ITS 1 & 2 PROJECT NOS 4241-4392/4G83-4684 SAFETY DRAWING T*TLE REV REV DATE STATUS SPEC.

DAfr DATE ISSUED NO.

ArrROVED CLASS.

NO.

i R

S-739 AUXILIARY BUILDING FOUNDATION k

15 DAN 91 15 DAN 89 CONST. REV.

OME P 75 SECTION 4-4 UNITS 1&2 BUILDIN FOUNDATION AL 13FE081 13FEC81 RECORD 28dANTG R

S -l at)

AUXILIARY SECTION 4-4 UNITS 1 & 2 R + S-741 AUXILIARY BUILDING FOUNDATION AE 05JUN81 05JUfJ81 REcCrD 07JUL75 SECTION 5-5 UNITS t&2 R

S-742 AUXILIARY BUILDING FOUNDATION AJ 220CT80 220CT80 CONST. REV.

2SJAN76 SECTION 5-5 UNITS 1&2 R

S-743 AUXILIARY BUILDING SECTION G

21NOV80 21NOV80 RECORD 22dUfJ77 UNITS 1&2

  • 'NOV80 21NOV80 RECORD 07JUL75 R

S-744 AUXILIARY BUILD 1tei FOUNDATION AE e

SECTION G-G UNITS 1 S 2 R

S-745 AUXILIARY BUILDING FOUNDATION AM 19 MAR 88 19 MAR 61 RECORD 28JAN76 SECTION 6-6 UNITS 1 & 2 R-5-746 Aux!LIARY BUILDING SECTION E

14 DAN 80 14lANRO CONSI. REV.

08APR77 UNITS 1&2 R

S-147 AUXILIARY BUILDING FOUNDATION W

15JULRO 15JULSO CONST. REV.

02SEP75 SECTION 7-7 UNITS 1 & 2 AA 300CT79 300CT79 CONif. RI V,

2HJAfJ76 R

S-748 AXUILIARY BUILDING FOUNDATION SECTION 7-7 UNITS 1&2 R

S-749 AUX 1LIARY BUILDING BLOCK VALL STEEL COLUMN T

235EP80 235EP80 CONST. REV.

18FEB77 SCHEDULE UNITS 1&2 S-750 AUXILIARY BUILDING FOUNDATION N

05JUN81 05JUH81 RECOPD 07f4AY7G R

  • SECTION 8-8 8 9-9 UNITS 1& 2 R

S-751 AUXILIARY SUILDING FOLNDATION W

22APR80 22APRSO CONST. REV.

07dU'_75 SECTIONS UNITS 1h2 R

S-752 AUXILIARY BUILDING FOUNDATION T

01dUL80 01dul80 CONST. REV.

07dul75 SECTIONS UNITS 1&2 R

S-753 AUXILIARY BUILDING FOUNDATION SECTIONS & DETAILS L

23 MAR 79 23 MAR 79 CONST. REV.

07*.3V75 UNITS 1 & 2 R

S-754 AUXILIARY BUILDING FOUNDATION d

18AUG77 18AUG77 CONST. REV.

07f40V75 I

SECTIONS & DETAILS UNITS 1&2 j

R S-755 AUXILIARY BUILDING FOUNDATION SECTION 50-50 L

15 DAN 81 15 DAN 81 CotJS T - REV.

07MAY7G j

UNITS 1 &2 R

S-756 AUXILIARY BUILDING ELEVATOR H

25APR78 25APR78 FAB REV 05AUG7G SECTION1 & DETAILS UNITS 1&2 R

S-757 AUXILIARY BUILDING S

O2 MAR 79 U2 MAR 79 CONST. REV.

13FEB76 SECTIONS & DETAILS UNITS 1&2 R

S-758 AUXILIARY BUILDING FOUNDATION SECTION 51-51 G

29NOV7G 2T.13V7G CONST. REV.

23APR7G

<JNITS 1&2 R

S-759 AUX 1LIARY BUILDINC e TION 51-51 L

3OJUN78 3OJUN78 CONST. REV.

ICAUG7G 1

UNITS 1&2 R

S-760 AUXILIARY BUILDING H

13 REB 81 13FEB81 RECORD 2GF. TAR 7G SECTIONS & DETAILS UNITS 1&2 R

S-761 AUXILIARY BUILDING FOUNDATION SECTION 63-63 T

19A'R81 19 MAR 81 RECORD 02SEP75 AREAS 1 & 2 SHEET 1 UNITS 1&2 R + S-762 AUXILIARY BUILDING L

05 DUN 81 05dVN81 RECORD 27APR76 FOUNDATION SECTIONS AREA 1 UNITS 1 & 2 co F

16 MAR 78 16 MAR 78 FABRICATIOfJ 07PIAY7G g

R S-763 AUXILIAstY BUILDING FOUNDATION SECTIONS AREA 1 & 4 UNITS 1 & 2 n

S/WGENTnLUNDY g F NGINFEftG

-.., _ ~.

. ~ -....

f 54' g

DRATIPJG LIST STRUCTURAL DF.PARikFNT I'AT[ s%3091 l'AGI 41 51RUCTURAL SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4G83-4084 SAFETY DR AW I tJG TITLE RE%

REV DATE STATUS

SPEC, DATE CLASS.

tJ0.

DATE ISSUED tJ0.

APPROVED R

S-764 AUXILIARY BUILDING FOUNDATION L

23SEP80 23SFP80 CONST. REV.

02SEP 5 SECTIONS & DETAILS UtJITS 1 & 2 R

S-765 J.UXIL I ARY BUILDING F0utJ0ATION H

1GMAR78 16 MAR 78 FABRICATI0tJ 07JUL75 SECTIONS & DETAILS UNITS 1 &2 R

S-76G AUXiLI ARV BUILDItJG FOUNDATION SECTIONS N

13 DAN 78 t ?J Af478 COtJS T. REV.

02stP75

& DETAILS UNITS 1&2 R

  • S-767 AUXILIARY BUILDING FOUNDATION SECTIONS T

02JUN81 02JUN31 C0f 4ST. REV.

02SEP75

& D2 TAILS UNITS 1&2 R

S-768 AUR!LIARY BUILDING FOUNDATION J

13JAN78 ?3JAN78 COtJST. REV.

07NOV75 SECTIONS UNITS 1&2 R-S-769 AUXILI ARV BUILDING FOUtJDATION N

240CT80 210CT80 CONST. REV.

07NOV75 SECTIONS & DETAILS UNITS 1&2 R

S-770 AUXILIARY BUILP MG FOUNDATION SECTION 164-164 J

15 DAN 81 15dMJ81 FOR RECORD 23APR7G UNITS 1&2 R

S-771 AUXILI ARY BUILDING Fs JNDATION G

29NOV7G 29NOV76 C0t4ST. REV.

02SEP75 SECIIONS & DETAILS UNITS 1 &2 R

S-772 AUXILIARY BUILDING FOUf40ATION S

Ot "8L80 01JUL80 CONST. REV.

07JU175 SECTIONS & DETAILS UNITS 1&2 R

S-7'3 AUXILIARY BUILDING FOUNDATI0tJ SECTIONS & DETAILS N

2GAUG80 26AUG80 CONST. REV.

07JUL75 UNITS 1&J R

S-774 AUXILIARY BUILDING FOUNDATION N

30APR81 30APR81 RECORD G2SER75 SECTIONS & DETAILS UNITS 1& 2 R

S-775 AUXILI ARY BUILDING FOUNDATION SECTIONS UNITS i&2 H

01JUL80 OtJULSO CONSt. REV.

31DEC75 R

S-776 AUXILIARY BUILDING SECTIONS & DETAILS UNITS 1 & 2 T

2GAUG80 2GAUG80 CONST. REV.

15 DAN 76 R

$-777 AUXILIARY BUILDING FOUNDATION G

3tMAR78 31 MAR 78 CONST. REV.

15 DAN 76 SECTIONS & DETAILS UNITS 1&2 R

S-778 Autt'.lARY BUILDIfJG FOUNDATION AA 220CT80 220CT80 CONST. REV.

28dAt476 I

SECTION 160-160 UNIT 1 R + S-779 AUXILIARY BUILDING FOUNDATION Y

05JUN81 05JUN81 RECORD 2RJAN76 SECTION 161-161 UNIT 2 R

S-780 AUXILIARY CUILDING FOUNDATION T

240CT80 240CT80 CONST. REV.

28 J AtJ76 SECTION 1G2-162 UNIT 1 R

S-781 AUXILIARY BUILDING FOUNDATION W

15JAN91 15 DAN 81 FOR RECORD 28JAN7G SECTION 1G3-163 UNIT 2 R

S-782 AUXILIARY BUILDING FOUNDATION J

19 MAR 81 19 MAR 81 RECORD 28 DAN 76 SECTIONS & DETAILS UNITS 1&2 R

S-783 AUXILIARY ^UUILDING SLAB SCHEDULE SHEET 1 B

11FEB76 ttFEB76 CONST. REV.

02SEP75 UNITS 1&2 R

S-784 AUXILIARY BUILDING SLAB SCHEDULE SHEET 2 8

ttFEB76 11FEB76 CONST. REV.

02SEP75 UNITS 1 & 2 R

S-785 AUKILIARY BUILDING SLAB SCHEDULE SHEET 3 A

17MAY7G 17MAY76 CONST. REV.

07tJOV75 UNITS 1&2 i

R S-78G AUXILIARY BUILDING SLAB SCHEDULE SHEET 4 6

17MAY76 17MAY7G CONST, REV.

07NOV75 UNITS 162 R

S-787 AUXILIARY BUILDING SLAB SCHEDULE SHEET 5 B

22APR80 22APR80 RECORD 07NOV75 o

UNITS 1&2 R

S-788 AUXILIARY BUILDING SLAB SCHEDULE SHEET 6 B

07 DAN 76 07 DAN 76 C0tJS T RUCT ION 07tJUV75 co UNITS 1 & 2 SMGENTMUNDY m-nc.

T W3 M

O ORAWING LIST STRUCTURAL DEPARTMINT DAlf 063011 PMJ 4?

STWUCTURAL SECTION COMMONWEALTH EDISON BVRON/ERAIDwCOD UNIT' 1 & 2 PROJECT NOS 4391-4312/d683 1G84 SAFETY ORAWING T I 'I s E REV REV DATE STATUS SPEC.

DATE CLASS.

NO.

DATE ISSUFD NO Arr40VED R

S-789 AU(ILIARY BUILDING SLAB SCHEDULE SHEET 7 C

17 fen 78 17FEB78 CONST. REV.

OadAN76 SNITS 1 6 2 R

S-790 AUXILIARY ButtDING SLAB SCHEDULE SHEET 8 F

170CT77 170CT77 RECODD 09 DAN 74 UNITS 1 &2 R

S-791 AUXIt.IARY BUILDING SLAB SCHEDULE SHEET 9 D

29NOV76 29NOV76 CONST. REV.

ORJAN76 UNITS 1&2 W

S-792 AUtiLIARY dUILDING SLAB SCHEDbtE SHEET 10 B

22APR80 22APR80 RECORD 28JAN7G UNITS 1 &2 R

S-793 AUXILIARY BUILDING SLAB SCHEDULE SHEET 11 E

17FEG78 17FEC78 CONST. REV.

2*JAN76 UNITS 1 &2 R

S-794 AUXILIArv BUILDING SLAB SCHEDULE SHEET 12 C

09sEP76 095EP7G CONST. REV.

2RJAN7G UNITT 1 & 2 R

S-795 AUXILIARY BUILDING SECTIONS UNITS I &2 H

050CT79 050CT79 CONST. REV.

Inrrn77 R

S-70G AUXILIARY BUILDING FOUNDATION F

2GMAR76 2GMAR76 CONST. REV.

07JUL75 WALL REINr0RCING DETAILS UNITS 1 &2 R

S 797 AUXILIARY BUILDING STEFL COLUMN SCHEDULE K

18 Mrv 77 18MAY77 FAc REV 2OJAN76 SHEET 1 UNITS 1&2 R

S-798 AUXILIARY BUILDING STEEL COLUMN SCHEDULE J

100EC76 100FC7G FAB REV 2OJ ArJ76 SHEET 2 UNITS 1 &2 R

S-799 BLOCK WALL STEEL COLUMN DETAILS S

07NOV80 07NOV80 CONST. REV.

13FE876 UNITS t &2 R

S-800 AUXILIARY BUILDING BLOCK WALL STEEL COLUMN AP 19 MAR 81 19 MAR 84 RECORD O2SEP75 SUPPORT SCHEDULE UNITS 1 & 2 R

S-801 FUEL HANDLING BUILDING E

13 DAN 78 13JAN78 CJNST. REV.

27MAY7G TOP REINFORCING PLAN EL. 401-0 UNITS 1 &2 R

S-802 FUEL HANDLING BUILD?NG F

13JAN78 13JAN78 CONST. PEV.

27FtA476 BOTTOM REINFORCING PLAN EL. 401-0 UNITS 1 &2 R

S-810 FUEL HANDLING BUILDING FOUNDATION PLAN J

13JAN78 13 DAN 78 CONST. REV.

27MAY76 EL. 385-0 AREA 1 UNITS 1 &2 R

S-811 FUEL HANDLING BUILDING GRPUND FLOOR FRAMING PLAN 5

09DCT79 090CT79 CONSI. REV.

27MAY76 EL. 401-0 AREA 1 UNITS 1&2 R

S-812 FUEL HANDLING BUILDING GROUND FLUOR FRAMING PLAN V

090CT79 090CT79 CONST. REV.

ISSEP75 EL. 401-0 AREA 2 UNITS 1 & 2 R

S-813 FUEL HANDLING BUILDING GROUND FLOOR FRAMING PLAN R

1HMAR8%

18 MAR 81 RECORD 15SEP75 EL. 101-0 AREA 3 UNITS tF 2 R

S-81G FUEL HANDLING BUILDING FObNDATION T

224UG79 22AUG79 CONST. REV.

27MAY7G SECTIct: 1-1 UNITS 1&2 R

S-817 FUEt. HANDLINn 9UILDING FOUNDATION G

2GDEC79 26DEC79 CONST. REV.

27 HAY 76 SECTIDN 2-2

'.f T S 1&2 R

S-818 FUEL HANDLIs.G BUILDING FOUNDATION G

29 jut.7 7 29JUL77 CONST. RFV.

27M4v7G SECTION 3-3 UNITS 1&2 R

S-819 FUEL HANDLING BUILDING FOUNDATION J

25JUN80 25JUN80 CONST. RFV.

2774Y76 SECTION 4-4 UNITS 1&2 R

S-820 FUEL HANDLING BUILDING FOUNDATION 5

290CT79 290CT79 CONST. REV.

27MAv76 SECTION 5-5 UNITS 1&2 R

S-821 FUEL HANDLING BUILDING FOUNDATION L

2GDEC79 26DEC79 CONST. REV.

27 HAY 76 SECTION 6-6 UNITS 1&2 e

Q R

S-822 FUEL HANDLING EUILDING FOUNDATION L

26DEC79 2GDEC79 CONST. RtV.

?7 HAY 7G m

SECTION 7-7 UNITS 1&2 l

SARGENT' LUflDY

h SG M

4 ORAWENG LISV STRUCTURAL DEPARTMENT DATE OG'3081 l' AGE 43 g

STRUCTURAL SECTION COMMONWEALTH EDISON BYRON /BQAICWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4G83-4684 SAFETY DRAWING TITLE REV REV DATE STATUS SPEC.

DATE CLASS.

NO, DATE ISSUED NO.

f.PPROVED i

R S-823 FUEL HANDLINC BUILDING R

27JUL79 27JUL79 CONST. RFV.

27MAY76 i

SECTIONS & DETAILS $?t.1 UNITS 1&2

^

R S-824 FUEL HANDLING BUILDING U

05JUN78 05JUN78 CONST. REV.

27MAV7G I

PLC, M TICNS & DETAILS Stl. 2 UNITS 1&2 R

S-825 F UI HY DLING BUILDING SECTION & DETAILS N

22 MAR 79 22 MAR 79 C0f1ST. REV.

04AUG76 UNIi 5 i A 2 R

S-827 SPEN 1 F t ?+. L STC2 AGE POOL LINER PLAN N

17JAN80 17 DAN 30 CONST REV 2OJUL76 EL. 426-0 UNI 15 t&2 R

S-828 SPENT FUEL STORAGE POOL LINER PLAN M

050CT78 050CT78 CONST. REV.

2OJUL7G EL. 385-0 UNITS s&2 R

S-830 SPENT FUEL STORAGE POOL LINER G

22APR77 22APR77 FAB. REV.

2OJUL76 SECTIONS 95-15, 16-16 & 17-17 UNITS 1&2 R

S-831 SPENT FUEL STORAGE POOL LINER L

02AUG78 02AUG78 FAB REV 2OJUt 7G SECTIONS 18-18 23-23 & 24-24 UNITS 1&2 R

S-832 SPENT FUEL STORAGE POOL LINEk J

240CT77 240CT77 FAB REV 20' TG SECTIONS 19-19 8 20-20 UNITS 1 %2 i

R S-833 SPENT FUFL STORAGE POOL LI'JER H

OBAPR77 08APR77 FAQ REV 2OJt1L76 SECTIONS 21-21 & 22-22 UNITS 1&2 R

S*834 FUEL HANOLING BUILDING P

18 MAR 81 1RMAR81 RECORD 220CT7G SECTIONS & DETAILS UNITS 1&2 1

j R

S-835 FUFL HANDLING Bt!ILDING TRACK LAYOUT G

08MAY78 08MAY78 FAB. REV 220CT76 4

EL. 426-0 PLANS. SECTIONS & DETAILS UNITS 1 & 2 R

S-836 DECONTAMINATION PIT LINE1 PLANS. SECTIONS N

09NOV79 C9NOV79 FAR REV 2OJUL76

& DETAILS UNITS t&2 j

R S-837 FUEL HANDLING BUILDING SECTIONS & DETAILS W

26DEC79 2GDF.C79 CONST. REV.

2OJUL7G l

UNITS 1 &2 l

R S-838 FUFL HANDLING BUILOING M

2GDEC79 2GDEC79 CONST. REV.

04AUG7G set,TIONS & DET AILS UNITS 1 &2 R

S-839 FUEL HANDLING BUILDING L

2GDEC79 2GDEC79 CONST. REV.

04AUG76 SECTIONS & DETAILS UNITS 1 & 2 R

S-840 SPENT FUEL STORAGE POOL LINER R

18AUG80 18AUG80 CONST. REV.

2OJUL7G SECTIONS & DETAILS UNITS 1&2 R

S-841 SPENT FUEL STORAGL POOL LINER E

01JUN77 01JUH77 FAB REV 2OJUL76 SECTIONS & DETAILS UNITS 1 & 2 R

S-842 SPENT FUEL STORAGE POOL LINER S

22 MAR 79 22 MAR 79 CONST. REV.

2OJUL76 SECTIONS & DETAILS UNITS 1&2 R

S-843 SPENT FUEL STORAGE POOL LINER T

17dANSO 17 DAN 80 CONST REV 2OJUL76 SECTIONS & DETAILS IJNITS 1&2 R

S-844 FUEL TRANSFER TUBE SLEEVE DETAIL AB 10APR81 tOAPR81 CONST. REV.

2OJUL7G UNITS 1 &2 R

S-845 -

SPENT FUEL STORAGE POOL LINER R

18AUG80 18AUG80 CONST. REV.

2OJUL76 SECTIONS & DETAILS UNITS 1 &2 R

S-846 SPENT FUEL STORAGE POOL E

26DEC79 2GDEC79 RECORD 21f1AR77 SECTIONS & DETAILS UNITS 1 & 2 R

S-858 FUEL HANDLING BUILDING EMBEDMENT PLAN E

25MAY79 25MAV79 CONST. REV.

O1AUG76 EL. 411-0 AREA 2 UNITS 1&2 R

S-859 FUEL HANDLING BUILDING EMBEDMENT PLAN F

2GDEC79 2GDEC79 CONST. REV.

O,1AUG7G EL. 42G-O AREA 2 UNITS 1 &2 e

R S-860 FUEL HANDLING BUILDING EMBEDMENT PLAN L

27dUL79 27JUL79 CONST. RE" 04AUG7G n

EL. 426-0 AREA 2 UNITS 1&2 SARGENT^LUNDY wenn

57 O

Q 11RAWING LIST STRUCTURAL DEPARTMENT DAff e6Tmt P Av l da e

STRUCTURAL SFCTION COMMONWEALTH EDISON BYRON /BRAIDWOOD Ut4tTS t & 2 PROJECT NOS 4391-4392/4r:P3 4G84 SAFETV DRAWING TITLE REV REV DATE S T ATtl5 "PEC.

DATE CLASS.

NO.

DAIE ISSUED N3.

AprROVED R

S-8G1 FUEL HANDLING BUILDING C

26DEC79 2GOEC73 CONSt. REV.

05AUG77 C F f' T Y (145

r. Or T A T t. 9 4 IPl? T 9 1 4 ?

~ _' * '

.=%~

3

,r rR i' Z }_ f '

w -

\\'=

. _ _ ~.

I

[

b

'r 3 GATE HOUSE FRAMING PLANS UNITS 1&2 R

175FP80 175tPCO CUf1S T. REV.

06r*

5-86 GATE HOUSE PLANS, SECTIONS & DETAILS UNITS 1 &2 J

12MAY80 12MAY80 CO"ST. RFV.

7P 5-865 TE HOUSE COLUMN POW ELEVATION & MISCELLANEOUS C

110CT78 110CT78 FAB REV OGFEB78-I *,

^ SECTIONS & OETAILS UNITS 1 &2 i

S-P66 GA?

- "ISE GIRT FRAMING UNITS 1&2 C

2SMAY78 25MAV78 CONST. REV C'6FEB7" GATEHOb

' MENT CONNEC1 ION DETAILS UNITS 1&2 0

25MAY78 25MAY78 CONST C6FEB73 1

5-867 1

RLV.

06FEBiP

!J 5-808 GATE HOUSE SEL 9 & DETAILS UNITS 1&2 C

25MA '8 25MAY78 j

4 i

S-869 SUPERSEDED BY S-869-S-869-BR

'J S-870 SUPERSEDED BY S-870-dY &

' -BR

'J S-871 LcCEIVING BUILDING ROOF FRAMINu N

E On J 06JUN79 CONST. REV.

15 MAR 7P UNITS 1&2

'J S-872 RECEIVItJG BUILDING COLUMN BRACING &

aldulPO OldUL80 FOR RECORD 15 MAR 10 A

s i

FRAMING DETAILS UNITS 1 & 2 N

S-873 RECEIVING BUILDING GIRT FRAMING P.

25MAV78 25MAY78 FAB FEV 15 MAR 77 UNITS 1 &2

'l4 N

S-874 SUPERSFDED BY S-874-BR R

S-87G CONTAINMENT BUILDING STRUCTURAL ARRAP 4T 04DEC79 04DEC79 CON %T. REV.

05 DON 7 UNITS 1 &2 R

S-877 CONTAINMENT BUILDING STRUCTURAt NGEMENT S

'V79 06NOV79 CONST. REV.

05duf17' UNITS 1 & 2 R

S-878 CONTAINMENT BUILDING INCO NSTRUMENT SHAFT B

tONOV.

'ONOV76 CONST. REV.

23APR7r EMBEDMENTS UNITS 1 &2 j R

S-879 CONTAINMENT BUILDINr

.E TIE PLACEMENT A

O2DEC77 02i

'7 CONSTRUCTION 02DEC7-i SHT 1 UNITS 1&"

R S-880 CONTAINMENT B JG DOME TIE PLACEMENT B

O2AUG78 O2AUG78 "NST. REV.

020EC7' SHT 2 UNITE 2

R S-881 SUPERStr.

5-881-BR R

S-882 CD p CT NT BUILDING FOUNDATION TOP D

tOAUG76 10AUG76 CONST. RL 03JUN7'.;

/ FORCING PLAN UNITS 1&2 R

S-883

ONTAINMENT BUILDING FOUNDATION BOTTOM F

12APR77 12APR77 RECORD 03dt tfl 7 '

RLINFORCING PLAN UNITS 1 &2 R

S" CONTAlf. MENT BUILDING TENUON LOCATION PLANS &

F 2tJUN78 2tdUN78 CONST. REV.

05f TAP /'

SECTIONS UNITS 1 &2 885 CONTAINMENT BUILDING DOME STIFFENERS UNITS 1 & 2 D

10FEB77 25MAY78 C0fJS T RUC T I O!J "PJ7 to

-r O

e _ n o r:

rem ot a. t a **r e t r ret t ? t n ?

  • tc *- r r t ' m 'a e n r T A? e

} *1f

  • [ G 3 f y ' V '

_ - ~. _.

x ' U i~L.,

?'

"N W '

~

~

~T~

T*

SARGENT <l.Ui!DY

,r - m n.e

rg g

g a

DRAT 71NG LIST STRUCTURAL DEPARTMENT DATE OG30"1 f AGt d'>

STRUC104AL SECTION COMMONWEALTH EDISDN BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4G83-4G84 SAFETY DRAWING TITLE 4rv REV DATE STAIUS SPEC.

DATE CLASS.

t40.

DATE ISSUED NO.

APPROVED p

V Tw:e4(m ' -- ~ '~

~ ~ ~

t r '

R' I

R S-898 CUNTAlfr[ENT BUILDING FOUNDATION PLAN EL.374-0 5

210C177 25%Av78 CONT, i ift'iMUN tt>J';N 1 AREA 1 UNIT 1 R

S-892 CONTAINMENT BUILDING FOUNDATION PLAN EL.374-0 P

210CT77 25MAY78 CONSTRUCTION O DUN 7 4 AREA 2 UNIT 1 R

S-893 CONT AINME NT BUILDING FOUNDATION PLAN EL.374-0 R

25MAY78 25MAV78 CO'JS T. REV.

O'i-JUN 74 AREA 3 UNIT 1 R

S-844 CONTAINMENT BUILDING FOUNDATION PLAN EL.374-0 L

?8APR77 2Lf4 A Y 78 CUNSTRUCTION 05dt P4: -

AREA 4 UNIT 1 R

S-895 STEAM TUNNFL/ SAFETY VALVE ROOM FLOOR PLAf4 N

17 DOL 78 17dUL78 CONST. REV.

28 DAN 76 EL. 377-0 AREA 1 UNIT 1 R

S-89G STEAM TUNNEL / SAFETY VALVE ROOM FLOOR PLAN M

25MAV78 25MAY78 CONST. REV.

28 DAN 76 EL. 377-0 AREA 2 UNIT 1 3 ~

m _ q_

R S-899 STEAM TUNNEL / SAFETY VALVE ROOM FLOOR PLAN L

25MAY78 25MAY78 RECORD 2 't

'47 G EL. 399-0 & 401-0 AREA 1 UNIT 1 R

S-900 STEAM TilNNEL/ SAFETY VALVE ROOM FLOOR PLAN P

29?.UC80 29AUG!10 COW. REV.

28 DAN 76 EL. 399-0 & 401-0 AREA 2 UNIT 1 R

S-902 CONTAINMENT BUILDING SAFETY VALVE ROOM F

31 MAR 78 3tMAR78 CONST. REV.

03 DUN 7G ROOF PLANS UNIT 1 R

S-903 CONTAINMENT BUILDING SAFETY VALVE ROOM E

O2NOV77 02NOV77 CONS 1.

RTV.

03.lON76 T't ANS E L. 416-4 UNIT 1

-}r n'

or i s. rt,,

.r" su i v v, a. vam a

i

-n-1,- mem.

3=

CONTAINMENT BUILDING FLOOR FRAMING PLAN EL.377-0 N

3OdUL80 3OdUL80 FOR RECORD M%

ira 5 1 & 4 UNIT 1 JT BUILDING FLOOR FRAMING PLAN EL.390-0 AC 29AUG80 29AUG30 CON' 17fMR7G S-906 AkV M 1

RECORf, 17ttAR7G y

S-907 CONT A I NME NT%Qy. i..

'004 FRAMING PLAN EL.390-0 Z

01DECen

,n AREAS 1 &4 UNITD PLAN EL.395-0 5

23MAYPO C0taS T. REV.

17 MAR 76 S-908 CONTAINMENT BUILDING FLOO" 4

AREAS 2 6 3 UNIT 1 S-909 CONTAINMENT BUILDING FLOOR FRAMING P d

01DEC80 01DEC80 FOR RECORD 17t9 AR 76 AREAS 1 &4 UNIT 1 S-910 CONTAINMENT BUILDING r

.e AN

'creo 29AUGno COriSI, pEV.

17 MAR 76 EL. 399-O & 40

    • '~J NIT 1 S-911 CONTAlt" ft s rM R FRAMING PLAN AK O2APR81 c0N%T. REV.

17F9AR76 p ot-O AREAS 1 & 4 UNIT 1

[

  • S-9

' p NMENT BUILDING FLOOR FRAMING PLAN EL.407-0 R

01 DUN 81 OtJUN31 R t t.

17 MAR 70

, f REAS 2 & 3 UNIT 1

l m

r nor n "mr.n ru t v i n t..n r e nne ron m on ru m re an, n e

--ituar m

+4"ar m

,e

-#J o

~~

~

Y A

L W U MLX ~D 1' ' ~

~ T L X' M ' ~ ' ~

' ' ~' T I ' ?S T -

n L~'

SARGENT LUNDY ir ratur ar r n.

Ma O

L DRAT $!PJG 1 IST STRUCTURAL DEPARTMEter D4ff f a. it m l 8 v.i tt STRUCTURAL SECTION COMMONwE ALTH EDISOff BYRON / BRA!CWOOD UNITS 1& 2 PROJECT NOS 4331-4392/4G83-4G84 SAFETY DRAWING TITLE REV DEV DAIE STATUS SPFC.

DATE DATE ISSUED NO.

AFPROVED CLASS.

NO.

-1 7

^

m ' T rv,W**t-r %'

r m

.r.

..m r g-r CONTAINMt.' BUILDING LINER Ep3EDMENT SECTIONS &

P O'IFEB78 25MAY18 C0f JS T PUC T I ON M

f DETAILS SH.1 UNITS 1 & 2 S-9h c0NTAINMENT BUILDINO LINER EMBEDMENT SCHEDULE SH.2 d

10r40V76 25MAY78 CONSTRUCTION 120tC 1

5-943 Cs. -

#ENT BUILDING LINER EMBEOMENT SECTIONS &

G 15APR81 15APR81 CONST. PEV.

240CT, DE T A)(

'l UNITS 1 &2 S-944 CONTAIM % "- 'LOING INTERNAL STORAGE STANDS G

05FEB79 05FFG79 FAB P 190Ci U

PLAN. SECTf rTAILS UNITS 1 & 2 S-945 C0!!TAINMENT BU

'E

'NTERNAL STORAGE STANDS R

04DEC79 04DEC70

.,f.

REV.

190CT l

SECTIONS & OETM LS 9 & 2 S-94G VOID S-947 VOID S-948 VOID R

160Cf80 1GOCT80 CON 3T. REV.

2Hfff' S-949 CONTAINMENT BUILDING SECONDARY SHIELD WALL PENEIRATION SH.1 UNIT 1

    • ,. MMAY7R 08f9AY78 CONST. REV.

27tM 4 n 5-950 CONTAINMENT BUILDING SECONDARY SHIF

?'

PENE TR AT ION SH.2 IJNIT 1

'; J D WALL L

2%

2GDEC79 CONST. REV.

OP W f

S-951 CONTAIN*. TENT BUILDING SECONDA PErJE TRAT ION SH.3 UNIT 1 7j F

3fMAR78 CONST. REV.

OC.J tA S-952 CONTAINMENT CUILDING

/Cf4TS EXTERIOR DEVELOPED Q s ' '.

ELEVATION UNIT 1 3OJAN M g r REV Ofid/J

/

5-953 CONT AINMENT P'

. S'.6 EXTERIOR DOME ANCHOR BOLT K

3OJArlRO V>

LOCATION

. AT S 1&2

',,*CDILDING B

04tJOV77 09NOV77 CO?b

  • m 25 Ji r ?

S-955 CONTA

.' N Cf': 5ECTIONS & DETAILS UNITS 1 &2 g.

2OJtJ 2

  • S-958 A A MENT BUILDING MISC. STEEL SCHEDULE UNIT 1 Y

01 DUN 91 01dVNR1 RECORD

?S?9 l S"'

CONTAINNENT BUILDING MISC. STEEL SCHEDULE UNIT 2 N

01 DUN 91 01dUr19 8 RECORD w

..,,c.,

,., n-

~.

n.._.,~-

-.. - ~..

R S-965 CONTAINMENT BUILDING FOUNDATION N

3ONOV77 25MAv/H Luf J o l F UL 41U 4 v.M 5

PLAN EL. 374-0 AREA 5 UNIT 2 R

S-966 CONTAINMENT BUILDING FOUNDATION PLAN EL.374-0 K

3ONOV77 25MAY78 CDNS T RUC T I O*J 03JUN75 AREA 6 UNIT 2

~

y-ARLA 8 UNIT 2 R

S-969 STEAM TUNNEL / SAFETY VALVE ROOM FLOOR PLAN M

25MAY78 25MAY78 CONST. REV.

2 P.d A f!7 G EL. 377-0 AREA 5 UNIT 2 R

S-970 STEAM TUNNEL / SAFETY VALVE ROOM FLOOR PLAN N

25MAY78 25MAY78 CONST. REV.

28 dan 76 EL. 377-0 AREA 6 UNIT 2 m

Q R

S-973 STEAM TUNNEL / SAFETY VALVE ROOM FLOOR PLAN K

3ONOV77 3ONOV77 CONST. REV.

28.J AN N ro h.

399-0 & 401-0 AREA 5 UNIT 2 SARGEilT LUNDY T NGINF F FtG

^

01 i

"N 4m m

DRAWING 1.IST STRUCTURAL DEPARTMENT D4ff Q6Na t PMu

.a STRUCTUR.".L SECTION CCMM3NWEALTH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4302/4083-4G84 SAFETY DRAWING TITLE REV REV DATE STATUS SPEC.

PA'r CLASS.

NO.

DATE ISSUED No.

AtT R% t o

  • R S-974 STEAM TUNNEL / SAFETY VALVE ROOM FLOOR PLAN M

2GFEB79 2GFEB73 CONST. REV.

29 DAN 7G EL. 399-O & 401-0 AREA G UNIT 2 R

S-977 CONTAINMENT BUILDING SAFETY VALVE ROOM E

O2NOV77 02tJUV77 CONST. REV.

03dVN75 PLANS EL. 41G-4 UNIT 2 R

$-978 CONTAINMENT BUILDING SAFETY VALVE ROOM D

02NOV77 02tJOV77 CONST. REV.

03dVN7G ROOT PL ANS UtJI T 2

-^

^

-1

<br z,

7 p

r r-Ti j

L'L. :.,0 2 % 6 361-0 AREA 1 UNII^t R

S-991 CONTAIrJ-1ENT BUILDING TUNNEL EMBEDMENT PLAN C

28FEG77 23r[D77 CONST, REV.

ifNICic EL. 302-G AREA 2 UNIT 1 R

S-982 CONTAltWENT BUILDING TUNNEL EMBEDMENT PLAN G

2RMAR79 28 MAR 73 CONST. REV.

18TEG76 EL.377-0 AREA 1 UNIT 1 R

S-983 CCNTAINMENT BU I LD !f 4G TUNNEL EMGEDMENT PLAN F

10t'AR78 1GMAR78 FACRICATION 1 PJ E F' 7 C EL. 377-0 AREA 2 UNIT t R

S-934 CON T A ltJt1ENT GUILDING TUNNEL EMBEDMENT PLAN D

30APR79 30APR73 CCNST. REV.

13FEC7G FL. 339-0 AREA 1 UNIT 1 R

S-935 CONT A l ft. TENT BUILDING TUtJNEL EMSEDMENT PL AN F

1GMAR7R 16 MAR 78 FACRICAffCN t e r t f T r.

EL. 399-O AREA 2 UtJIT 1 R

S-98G CONTAINMENT GUILDING TUNNEL EMBEDMENT PLAN E

O?tJ0V77 00NOV77 COPJST. REV.

18F EC7G EL. 3G2-6 6 3G1-0 AREA 5 UNIT 2 R

S-987 CCNTAltJMENT L'UILDItJG TUNNEL EMBEDNENT PLAN D

09tJOV77 O?tJ0V77 CCMST. R t i.

feFrG7G EL. 3G7-6 AREA G UNIT.2 R

S-903 CONTAltJMENT BUILDING TUNNEL EMBEDMENT PLAN F

3ONOV77 3Cf30V77 CONST. REv.

terrnT6 EL 377-0 AREA 5 UNIT 2 R

S-N CONT AINr.'[NT BUILDI!JG TUNNEL EMBEDMENT PLAN E'

1GMAR78 1GMAR'40 F Al'R I C A T I ON 10r!C7G EL. 371-0 AREA G UNIT 2 R

S-990 CONTAINMENT GUILU'fJG TUNNEL EMBEDMENT PLAN C

2eFEU77 2SFEC77 CONST. REV.

terEC7G EL. 399-0 ARE A 5 UtJI T 2 R

S-991 CONTAINMENT HUILDING TUNNEL EMBEDMENT PLAN d

25SEP80 255EPHO C0t!ST. REV.

tRFfB7G FL. 399-0 ARFA G tJNIT 2

{

^

1

-/

R S-933 CONT A lt#. TENT HUILDING EroGEDMENT PLANS U

3OdUL80 30dULHO I U L' NtCUN t,,2 4 t ;' lG EL. 4tG-4 UNIT 1 R

S-994 CONTAINNENT r,r,g(D]NG Lt.MEDMJN' PLANS B

3OJUL80 3OdULSO FOR R F C0r'D 02AUG7G EL. 41G-4 bre ! T 2 r r in --

D I'llkLOINGFLOOP tRAr.:ING PLAtJ EL.377-0 H

OCMAY7n OtMA Y 7'l

0. y,,,.-

RW~a-- Pt AN n

^ x "Y

  • '"=

~

S.,,,

Lt 330-0 AREAS 6 & 7 UNI O %

f.

s,

. = -

s Co :TaltiLtENT CUIL OIN s

S-938 r

tt. e

. w I

I b e,w G

2 g

. s,. m..,.,... c., 7 c.,..r....-

n nn.) r m tNG riAM G

065EP79

('0 9 "77

-J

/

g

-.w w n, m.,

+

. _ - - =

1 n.

- l r. p.. r t e

' L + *.. i l g;

=gt-.

.?!.e..

h.'......-

63 g

g DRAWIRG LIST STRUCTURAL DEPARIMENT DAIE t r.3091 8 W.r So STRUCTURAL SECTION COMMONWEALTH EDISON BVRON/BRAIDWOOD UtJITS 1 & 2 PROJECT NOS 4391-4352/4G83-4G84 SAFETY DRAWING TITLE REV REV DATE STATUS SPLC.

DATE CLASS.

NO.

DATE I SSut 0 F J0.

APPROVE D h

[Lgm-ulg_7 - y

<3 r

2 33 1

m..

1 - -

1 m1

-n BUI I RLM tJ0. 2& 4 UNAIS t & 2

,. \\-

't CONTAINMENT BUILDING GIRT FRAMING C

210CT77 210CT77 C0flS T. REV.

'f BUTTRESS NO. 1 & 5 UNITS 1 & 2 S-1032 CONTAINMENT BUILDING LINER PENETRATION AA 01DEC80 010EC80 FOR RTCORD o /DC T '

DULE UNIT 2 5-1034 LtA tNN NT BUILDING DOME LINER EMBEDMENT PLAN G

JOMAR78 25MAV78 CONSIRUCTir 25 MAR UNIT.

5-1035 CONTAINMIN

' LDING INTERIOR DEVELOPED ELEVA110N U

15APR81 1 SAPR 91 CON" s.

070C1 UNIT 2 5-103G CONTAINMENT SUIL TNER EMBEDMENT SCHEDULE M

3OJAN79 3OJAP~

OR RECORD 25fA A P

i SHEET 1 UNIT 2 S-1037 CONTAINMENT BUIL. DING lit.

MEDMENT SCHEDULE J

10NOV7e

.,73 CONSTRUCTION 1? der SHEET 2 UNIT 2

.i S-1039 vo!D

'l WALL, SECTIONS & OETAILS UNITS 1&2 S-1044 CONTAINMENT BUILDING SECONDARY SHIELD WA L

1GOCT80 160CT80 CONST. REV.

030C1 PENEIRATION SHEET 1 UNIT 2 S-1045 CONTAINf4ENT BUILDING SECONDARY S L

AUG78 02AUG78 CONST. REV.

O30C1 PEfJETRATION SHEET 2 UNIT 2 S-1046 CONT A !!JME NT BUILDING SEC '

a(IELD WALL J

26b

?GDEC79 C0tJS T. REV.

030CT

'i PENETRATION SHEET 3

1 5-1047 CONTAINNENT BUIL dDMENTS EXTERIOR DEVEL0nED C

31 MAR 78 3 CONST. RFV.

19 Arc t7 I

ELEVATION UN S-1048 CONTAINy()

yTilNG F

3OJUN78 3OJUNT8

'Y.

REV.

06d APR fcfli EMGLOMENT SCHEDULE UNITS 1 &2 PIPE P'

S-10!1 aCNT BUILDING STRUCTURAL A

10APR80 10APR80 CONSiku 10APF f

,eGfilTY TESTING INSTRMENTATION UNITS 1&2

.UNTAINMENT BUILDING STRUCTURAL A

10APRRO 10APR80 CONC TRUCT IUti 10MT l

S-105' INTEGRITY TESTING CRACK MAPPING LOCATIONS UNIT 1

,[

CONTAINMENT BUILDING STRUCTURAL.

A 10APRRO 10 APP 80 eJS T RUC T I ON

' n M's

-l INTEGRITY TFSTING CRACK NAPPING LOCATIONS UNIT 2 J

r,n

=-

UNII7 C '2 R

S-1057 C0f4TAINMENT BUILDING SECTIONS & DETAILS W

29AUG90 29AUG80 C0f4S t. REV.

03 JUrr,5 UNITS 1 &2 R

S-1058 CONTAINMENT BUILDING SECTIONS & DETAILS P

OGNOV79 06HOV79 CONST. RI V.

03JUN75 UNITS 1 & 2 R

S-1059 CONTAINMENT BUILDING SECTIONS & DETAILS AA 2GFEB79 2GFEB79 CONST. PEV.

05JUN74 UNITS 1 &2 R

S-10GO CONTAINMENT BUILDING SECTIONS & DETAILS F

16 MAR 78 16 MAR 78 FACRICATIOfJ 28 DAN 76 UNITS 1 &2 R

S-1061 CONTAINMENT BUILDING SECTIONS & DETAILS K

294UG80 29AUGRO CONST. REV.

03.. TUN 76 UNITS 1 &2 R

S-10G2 CONTAINMENT BUILDING SECTIONS & DETAILS K

31 MAR 78 31 MAR 78 CONST. RFV.

03JUN75 UNITS 1&2 e

R S-1063 CONTAINMENT BUILDING M

O2AUG78 O2AUG/8 CONST. REV.

29dANiG m

SECTIONS & DETAILS UNITS 1&2 SARGEllT: 1.UflDY

_w r N n1NrF rM&

6G M

Q e

DR At]IMG LIST SIRUCTUR AL DEPARIMEQtST DATE D63001 l'AtJ

  • .1 STRUCTURAL SECTION COMMONWEALTH EDISDN SYRON/BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391 -4392/.tr,83 4Ge4 SAFETY DRAWING TITLE REV REV DA1F SIATUS e.r f c.

DAir CLASS.

f 40.

fu i r _ t " e f r ri

.n,--

W f

'5 %

31

+,,+*#9-t ; C r c., k.G u o -

I u t dt it 431 U t duf P11 REr0ro i

StCII0i45 & UETAILS UNITS 1&2 r

N.S.S.S.

SUPPORT FRAMING STEAM GENERATOR SUPPORT M

O t JUf M 1 01JUN81 Cof 4S i. RFV.

31 Air 31 Aut y{ '

It'TIONS & DETAILS SH. 1 UNITS 1 &2

  • S-1920 SUPPORT FRAMING SECTIONS & DETAILS AC 01JUN81 01JUfJS t f"

UNl h% l

  • SECTIONS & DETAILS C

13 DAN 78 CONST. REV.

2PFEi S-1121 CONT A INMuth.Q UNITS 1 & 2 S-1122 CONTAINMENT & FUEL HAND 4 ING F

31 MAR 78 FAB REV 275El EQUIPMENT TOOL RACKS SH.1 Otil% ?

S-1123 CONTAINMENT & FUEL HANOLING BUILDI 07APR77 07APR77 FAB REV 22%F t J

E QUI PME f A T TOOL RACKS SH.2 UNITS 1&2

%q S-1924 CONT AIN?AENT BUILDING n

06SEP79 OGSEP79 CONST. REV.

07 dut I? A:

R.C.F.C.

ENCLOSURE ELEVATIO b

S-1125 CONTAINMENT BUILDING C

O-10C T 7 9 CONST. REV.

0100i l

R.C.F.C.

ENCLOSURr

't UNIT 1 S-112G CONTAINMENT

'M E

O.10CT79 o-. m

.' "' M T. PfV.

07du g O R.C.F.

Af SECTIONS UNITS t&2 pk S-1127 s

A ETAILS UNITS 1&2 A

160C180 160CTSO Cut 100C p oNs & DETAILS UNITS 1& 2 ONTAINMENT BUILDING E

OGSEP79 06 S'. P 79 CONST. REV.

i n a u-4

  1. c 1

R.C.F.C.

ENCLOSURE ELEVATIONS UNIT 2 r

c c.,,.,,,,,. -,

r..,

t _

    • l'2!?'

tt?__

?w u T

_**T^"2

-- 2 --

d.

. _f N

S-11'35 COLUfM4 BRACING ROW E UNIT 1 D

09JUL76 09JUL76 FAB REV 01 MAR 76

~

N 5 113G COLUMN ERACING ROW E UNIT 2 C

2GAUG76 26AUG7G FACRICATION 01f94R76 R

S-1137 COLUMN BRACING ROW L UNIT 1 N

OGJUN30 OGJUNSO RECURO 01 MAR 16 R

S-1138 COLUMN BRACING ROW L UNIT 2 J

OGJUN80 OGJUN80 CONST. REV.

01 MAR 7G R

S-1139 COLUMN BRACING ROWS AA, BB, H & L G

04 DAN 80 04 DAN 80 CONST. REV.

12NOVM UNITS 1 &2 R

S-1840 COLUMN BRACING ROWS 10, 23, 26 & C N

27DEC79 270FC79 CONST. REV.

07APR76 UNITS 1& 2 R

S-1141 COLUMN BRACING ROWS 6 8 30 UNITS 1&2 P

300CT79 300C179 RECURI) 01f9AR76 R

S-1142 COLUMN BRACING ROWS 1,

4 & 32, 9.6, 13, 16 & 20 L

01JULSO OtJULCO CONST. REV.

01 MAR 7G G.

O.9 S.

5.2, & 7 UNITS 1&2 R

S-1143 COLUMN BRACING ROWS Q, 37, 5.3 & 30.7 T

21NOVPO 2tNOV80 CONST. REV.

OfMAR76 UNITS 1 &2 R

S-1144 COLUMN BRACING ROWS 15 & 21, 12 & 24, 45 U

2ONOV79 2ONOV79 CONST. REV.

O t P17. R 7 G

& D.1 UNITS 1&2 R

S-114S COLUMN BRACING ROWS 18, 34 & A UNITS 1 & 2 E

22APR77 22APR77 FAB REV Off1AR7G R

S-1146 COLUMN BRACING ROWS C, V.9 N & E.7 N

12APR79 12APR79 CONST. RTV.

01f1AC/G o

UNITS 1 &2 J

24JAN79 24JAN79 CONSI. REV.

01'1AR7G O

R S-1149 COLUMN BRACING ROWS 11, 17, 19, 2d & T g

m UNITS 1 &2 SARGEllT.LuflDY

. mamw

07 Q

Of2 AWING LIST STRUCTURAL DEPARTMFNT D A 10 G3081 PAQ

'e l STRUCTURAL SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOO UNITS 1 & 2 PROJECT NOS 4391-4392/4G83-4G84 SAFETY DRAWING TITLE REV REV DATL STATUS SPEC.

DATE DATE ISSULD P40.

Arre0VEo CLASS.

NO.

R S-1150 TURBINE ROOM. SERVICE CUILDING & RIVER SCREEN HSE.

M 12SEPPO 12SEP80 CONST. REV.

1PFEP77 COVER PLATE SCHEDULE UNITS 1 &2 N

S-1151 HFATER BAY COLUMN SCHEDULE H

04AUG77 04AUG77 F AB f;EV 01 MAR 76 UNITS 1 & 2-N S-1152 TURBINE ROOM COLUMN SCHEDULE K

04FER77 04FEB77 C0tN T. REV.

170EC75 SH. 1 UNiiS 1 &2 R

S-1153 TURBINE ROOM COLUMN SCHEDULE R

13DFC77 130EC77 FAB REV 070CT75 UtJI T S 1 & 2 N

S-1154 TURBINE ROOM COLUMN SCHEDULE UNITS 1&2 H

18NOV76 1RNOV7G FAB REV 070CT75 N

S-1155 TUR81NE ROOM GIRDER SCHEDULE UNITS 1 &2 F

30AUG7G 30AUG76 FAC REV 22 MAP 7C N

5-1156 TURBINF ROOM GIRDER SCHEDULE UNITS 1 &2 F

25AUG77 25AUG77 FAB REV 01 MAR 7G N

S-1157 TURBINE ROOM GIROER SCHEDULE UNITS 1 &2 D

11AUG76 11AUG7G FAB REV 01 MAR 7G N

S-1158 TURBINE ROOM MISCELLANEOU3 FLOOR FRAMING PLANS U

21NOV80 21NOVSO C0fJS T. REV.

01 MAR 7G ONITS 1 &2 N

S-1159 TURBINE ROOM MEZZANINE FLOOR FRAMING PLAN T

17dANAO 17dArJ80 Cor Si REV O1 MAR 76 EL. 42G-O AREA 1 UNIT 1 N

S-11GO TURBINE ROOM MEZZANINE FLOOR FRAMING PLAN V

13SEP78 13SEP78 CONST. REV.

01 MAR 76 EL. 426-0 AREA 2 UNIT 1 R

S-11G1 TURBINE ROOM MEZZAf!!NE FLOOR FRAMING PLAN AC 13FEB80 13FEB80 CorJST REV 01 MAR 7G EL. 42G-O AREA 3 UNIT 1 N

S-1162 TURBINE ROOM MEZZANINE FLOOR FRAMING PLAN U

05JUN78 05JUN78 CONSI. REV.

OfMAR76 EL. 426-0 AREA 4 UNIT 1 R

S-1163 T URB I PJE ROOM MEZZANINE FLOOR FRAMING PLAN AM 18ti A R 81 18 MAR 81 RECCRD OIMAR76 EL. 426-0 AREA 5 UNIT 1 N

5-1164 TURRINE ROOM MEZZANINE FLOOR FRAMING PLAN AL 18 MAR 81 18 MAR 81 RECORD 01 MAR 76 EL. 42G-O AREA 6 UNIT 1 R

S-1165 TUR0!hE ROOM MEZZANINE FLOOR FRAMING PLAN AB 18 MAR 81 1DMARS1 RECORD 01 MAR 7G EL. 42G-O AREA 7 UNIT 2 N

S-1166 TUR6INE ROOM MEZZANINE FLOOR FRAMING PLAN Z

30APR81 30APR81 CONST. REV.

01 MAR 7G EL. 426-0 AREA 8 UNIT 2 R

S-1167 TURBINE ROOM MEZZANINE FLOOR FRAMING PLAN V

23SEPRO 235EP80 CONST. REV.

01 MAR 7G EL. 42G-O AREA 9 UNIT 2 N

S-1168 TURBINE ROOM MEZZANINE FLOOR FRAMtNG PLAN U

30APR81 30APR81 RECORD 01 MAR 7G EL. 42G-O AREA 10 UNIT 2 N

5-11G9 TURBINE ROOM MEZZANINE FLOOR FRAMING PLAN K

21NOV80 21NOV80 CONST. REV.

01 MAR 7G EL. 426-0 AREA 11 UNIT 2 N

S-1170 TURBINE ROOM MEZZANINE FLOOR FRAMING PLAN T

21NOV80 21NOV2O CONSI. REV.

01 MAR 76 EL. 426-0 AREA 12 UNIT 2 N

S-1171 TURBINE ROOM MEZZANINE FLOOR FRAMING PLAN P

21NOVPO 21NOV80 RECORO OtMAR76 EL. 426-0 AREA 13 UNIT 2 N

S-1172 TURBINE ROOM MEZZANINE FLOOR FRAMING PLAN V

21NOV80 21NOVRO RECORD 01MPR7G EL. 426-0 AREA 14 UNIT 2 N

S-1173 TURBINE ROOM MAIN FLOOR FRAMING PLAN P

13SEP73 13SEP78 CONST. REV.

01 MAR 7G e

EL. 451-0 AREA 1 UNIT 1 O

N S-1174 TURBINE ROOM MAIN FLOOR FRAMING PLAN P

3ONOV78 3ONOV78 CONST. REV.

01 MAR 76 m

EL. 451-0 AREA 2 UNIT 1 SARGENTMUNDY

. nm.r w

[

cs M

Q DRAWING L IST STRUCTURAL DEPAR TMI NT D A I L u 30'11 P a t.1 STRUCTUPAL SECTION COMMONWEALTH EDISON BYRON /BRAIOWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4G83-4G84 SArETY DRAWING TITLE REV REV OAYE STATUS SPEC DATE CLASS.

NO.

6 ATE ISSUED PJ0.

APPROVED R

S-1175 TURBINE ROOM MAIN FLOOR FRAMING PLAN Z

170C179 170CT79 CONST. REV.

OtMAR7G EL. 451-0 AREA 3 UNIT t N

S-1176 TURGINE ROOM MAIN FLOOR FRAMING PLAN AA 13FEBRt 13FEB31 RECOPD Ott9AR7G EL. 451-0 ARIA 4 UNIT 1 R

S-1177 10RBINE ROOM MAIN CLOOR FRAMING PLAN AG 18 MAR 81 18 MAR 81 CotJS T. REV.

OtMAR70 EL. 451-0 AREA 5 Uti!T 1 N

S-1f78 TURBINE ROCM MAIN FdOR FRAMING PLAN AC 01 DOL 80 01dUL80 CONST.

.EV.

01 MAR 70 EL. 451-0 AREA 6 UNIT R

S-1179 TURBINE ROOM MAIN FLOOR FRAMING PLAN W

1GduN80 1Gdu!EO CONSI. REV 01 t.* A R 7 6 E l.. 451-0 AREA 7 UNIT 2 N

5-1180 TURBINE ROOM MAIN FLOOR FRAMING PLAN R

01JUL80 01dUL80 CONST. REV.

01 MAR 76 EL. 451-0 AREA 8 UNIT 2 R

S-1181 TURBINE ROOM MAIN FLOOR FRAMING PLAN Y

13FE001 13FEB81 CONST. REV.

OtMAR76 EL. 451-O AREA 9 UNIT 2 N

S-1132 TURBINE ROOM MAIN FLOOR FRAMING PLAN W

13FEB81 13fCB81 CONST. REV.

01 MAR 7G EL. 451-0 AREA 10 UNIT 2 N

S-1183 TURBINE ROOM MAIN FLOOR FRAMING PLAN L

135FP78 13SEP78 CONSI. REV.

01 MAR 76 EL. 451-0 AREA 11 UNIT 2 N

S-1184 TURBINE ROOM MAIN FLOOR FRAMING PLAN F

3ONOV78 3ONOV78 C0taST. REV.

01tMR 7 G EL. 451-0 AREA 12 UNIT 2 N

S-1185 TURBINE ROOM MAIN FLOOR FRAMING PLAN r

28APR78 28APR78 C0i4S T. REV.

01 MAR 7G EL. 451-0 AREA 13 UNIT 2 N

S-1186 TURBINE ROOM MAIN FLOOR FRAMING PLAN V

3ONOV78 3ONOV78 CONST. REV.

01 MAR 7G EL. 451-0 AREA 14 UNIT 2 N

S-1187 TURBINE ROOM CRANE GIROER & RAIL PLAN H

03FFB78 03FEB78 FAB REV 09APR70 UNITS 1&2 N

S-1188 TURBINE ROOM CRANE GIROFR SECTIONS d

15AUG80 15AUG80 CUNST. REV.

01APR7G

& DETAILS UNITS 1 52 N

S-1190 TURBINE ROOM ROOF FRAMING PLAN AREA 1 UNIT 1 G

28 MAR 78 28 MAR 78 C0tJST. REV.

C3APR7G N

S-1191 TURBINE ROOM POOF FRAMINC PL/N AREA 2 UNIT 1 H

28 MAR 78 28 MAR 78 CONST. REV.

09APR76 N

S-1192 TURBIT.E ROOM ROOF FRAMING PLAN AREA 3 UNIT 1 H

23FEB79 23FEB79 RECORD 09APR7G N

5-1193 TURRINE ROOM ROOF FRAMING PLAN AREA 4 UNIT 1 G

28 MAR 78 28 MAR 78 CONST. REV.

09ArR76 N

S-1194 TURBINE ROOM ROOF FRAMING PLAN AREA 5 UNIT 1 G

28 MAR 78 28 MAR 78 C0t!S T. REV.

20APR76 N

S-1195 TURBINE ROOM ROOF FRAMING PLAN AREA 6 UNIT 1 F

28 MAR 78 28 MAR 78 CONST. REV.

20APR76 N

5-119G TURBINE ROOM ROOF FRAMING PLAN AREA 7 UNIT 2 E

2RMAR78 28 MAR 78 CONST. REV.

12dUL76 ed N

5-1197 TURBINE ROOM ROOF FRAMING PLAN AREA 8 UNIT 2 D

28 MAR 78 28 MAR 78 CONST. REV.

12dul76 N

5-1198 TURBINE ROOM ROOF FRAMING PLAN AREA 9 UNIT 2 D

28 MAR 78 28 MAR 78 CONST. REV.

12dut 76 N

S-1199 TURBINE ROOM ROOF FRAMING PLAN AREA 10 UNIT 2 0

28M.278 2SMAR78 CONST. REV.

12dUL7G Q

N S-12OO TURBINE RGJ1 ROOF FRAMING PLAN AREA 11 UNIT 2 C

28 MAR 78 28 MAR 78 CONST. REV.

210UL7G n

S/\\RGEtlT4LUflDY j

+

,,womerm

l 69 M

+

DRAUING I.IST STRUCTURAL DEPARtMEN!

DQif fNi30?11 P AC.!

W STRUCTURAL SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4 391 -4332/4GR3 -4G8 8 SAFETY ORAWING TITLE REV REV OATE STATUS SPEC.

DATE CLASS.

NO.

DATE ISSUED NO.

APPROVFD N

5-120t TUPBINE ROOM ROOF FRAMING PLAN AREA 12 UteIT 2 C

28 MAR 78 28 MAR 78 C0tJSt. REV.

22JUL7G N

S-1202 TURBINE ROOM ROOF FRAMING PLAN AREA 13 UNIT 2 0

28 MAR 78 28 MAR 7R CONST. REV.

3OSEP76 4

N S-1203 TURBINE ROOM ROOF FRAMING PLAN AREA 14 UNIT 2 C

28 MAR 78 28 MAR 78 CON;T. REV.

3OSEP7G N

S-1204 TURBINE ROOM SECTIONS & OETAILS H

2GJUN79 26JUN79 CCNST. REV.

130EC77 UNITS 1 &2 N

S-1205 TUROINE ROOM SECTIONS & DETAILS d

210EC77 210EC77 CONST. REV.

13F E B 76 UtJI T S 1&2 N

S-120G TURBINE ROOM SECTIONS & DETAILS P

13JUL78 13JUL7R RECORD 28NOV75 UtJI T S 1 &2 N

S-1207 TURBINE ROOM FOUNDATION E

170CT79 170CT79 CONST. REV.

02PTAR76 SECTION 61-G1 UNIT 1 N

5-1208 TURBINE ROOM FOUNDATIs N O

170CT79 170C179 CP'JS t. REV.

00ftAR76 SFCTION G1-61 UNIT 2 N

S-1209 TURBINE ROOM FOUNDATION O

04AUG77 04AUG77 CONST. REV.

07APR76 SECTION 8G-86 UNIT 1 N

S-1210 TURBINE ROOM FOUNDATION SECTIONS 86-86 & 87-87 C

290EC78 290EC78 FOR RECORD 15JUN76 UNITS 1&2 N

S-1211 TURBINE ROOM FOUNDATION SEC*tDN 87-87 C

3JOEC77 130EC77 CONST. REV.

1CMAY76 UNIT 2 N

S-1212 TURBINE ROOM FOUNDATION SECTIONS & DETAILS H

13DEC77 130EC77 CONST. REV 1GMAR76 UNIT 1 N

5-1213 TURBINE ROOM FOUNDATION SECTION 88-88 C

25AUG77 25AUG77 C0tJS t. REV.

tOMAY76 UNIT 1 N

S-1214 TURBINE ROOM FOUNDATION SECTION 89-89 A

30SEP76 3OSEP7G CONST. RFF.

10MAY76

, UNIT 2 N

S-1215 TURBINE ROOM FRAMING PLAN EL. 523-0 UNIT 1 F

035EP7G 035EP76 FAB REV 09APR7G N

S-1216 TURBINE ROOM FRAMING PLAN EL. 523-0 UNIT 2 C

03SEP76 035EP76 FAB REV 12JUL7G N

5-1217 TURBINE ROOM ROOF TRUSS O

2OJUL76 2OJUL7G FAB REV 09APR76 ELEVATIONS & OETAILS UNITS 1 &2 N

S-1219 MAKE-UP DEMINERALIZER AREA R

30APR81 30APR81 CONST. REV.

22MARh 1

ROOF FRAMING PLAN UNIT 1 N

S-12?O HEATER BAY MEZZANINE FLOOR FRAMING PLAN Y

05SEP79 05SEP79 CONST. REV.

01 MAR 76 EL. 42G-0 AREA 1 UNIT 1 N

S-1221 HEATER BAY MEZZANINE FLOOR FRAMING PLAN Y

30APR81 30APR81 CONST. REV.

O WM6 4

EL. 426-0 AREA 2 UNIT 1 N

S-1222 HEATER BAY MEZZANINE FLOOR FRAMING PLAN U

01AUG80 01AUG80 CONST. REV.

O "*A50t; EL. 42G-O AREA 3 UNIT 2 N

S-1223 HEATER BAY MEZZANINE FLOOR FRAMING PLAN S

13FEB81 13FERS1 COPN. REV.

O t tP 97ti EL. 42G-0 AREA 4 U;4IT 2 N

S-1224 HEATER BAY RCOF FRAM*NG PLAN N

28 MAR 78 28 MAR 78 CONST. REV.

Ot*1AR7G AREA 1 UNIT 1 N

S-1225 HEATER BAY FIOOR FRAMING PLAN EL. 4S1-0 AA 30APR81 30APR81 CONST. IM w DiMAR76 AREA 2 UNIT 1 to Q

N S-1226 HEATER BAY FLOOR FRAMING PLAN EL. 451-0 AA 18 MAR 81 18 MAR 81 CONST. M V.

01 MAR 76 m

AREA O UNIT 2 S/WGErlT t LUrlDY

., mmm,. m

p 70 O

Q y

DR4 WING IIST SIRUCTUIAL DEPARTMENT U A T E OMOn 1 P A CI

  • .7 STRUCTURAL SECTION COMMONWEALYH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4332/4G83-4GR4 SAFETY DR AW ItK2 TITLE REV REV DATE STATUS SPEC.

DArE CLAS.S.

NO.

DATE ISSUED NO.

APPROVED N

S-1227 HEATER BAV ROOF FRAMING PLAN H

28 MAR 78 28 MAR 78 CONST. REV.

0171AR7G AREA 4 UNIT 2 N

S-1228 HEATER BAY ROOF FRAMING PLAN K

28 MAR 78 28 MAR 78 CONST. REV.

17NAv7G AREA 2 UNIT 1 N

S-1229 HEATER CAY ROOF FRAMING PLAN F

2nMAR78 2SMAR78 C0tJS T. REV.

12JUL7G AREA 3 UNIT 2 N

S-1230 TURBINE ROOM SECTIONS & DETAILS N

30APR81 30APR81 CONST. REV.

ibJUN76 UNITS 1 &2 N

S-1231 TURBINE ROOM MISCELLANEOUS STEEL L

27FEB78 27FF018 CONST. REV.

17MAY76 FRAMING DETAILS UNITS 1 &2 R

S-1232 TURBINE ROOM MISCELLANEOUS ROOF FRAMING PLANS W

18 MAR 81 18 MAR 81 CONST. REV.

200CT7G UNIT 1 R

S-12*13 TURBINE ROOM MISCELLANEOUS ROOF FRAMING PLANS R

21NOV80 21NOV80 RECORD 190CT76 UNIT 2 N

S-1234 TURBINE ROOM MISCELLANEOUS FLOOR FRAMING PLANS L

13JUL78 13JUL78 FAC REV 18JUN7G UNITS 1 & 2 N

S-1235 TURGINE ROOM MISCELLANEOUS FLOOR FRAMING PLANS N

04JANSO 04 DAN 00 CONS

  • REV.

29fJOV7G UNITS 1&2 N

S-123G BOILER STICK SUPPORTS SECTIONS & DETAILS C

13SEP78 13SEP78 RECORD 12JUL7G UNITS 1&2 N

S-1237 RADWASTE/ SERVICE BUILDING COMPLEX FLOOR FRAMING S

OGSEP79 OGSEP79 CONST. REV.

12NOV7G PLAN EL. 417-0 AREA 1 UNITS 1&2 N

S-1238 RADWASTE/ SERVICE BUILDING COMPLEX FLOOR FRAMING F

03 APR 7st 03APR78 FAB REV 12f JOV76 PLAN EL. 417-0 AREA 2 UNITS 1&2 N

S-1242 RADWASTE/dERVICE BUILDING COMPLEX FLOOR FRAMING M

03APR78 03APR/8 C0tJST. REV.

12tJOV 7G PLAN EL. 433-0 AREA 1 UfJITS 1 &2 N

S-1243 RADWASTE/ SERVICE BUII. DING COMPLEX FLOOR FRAMING L

19JUL7P 19JUL78 CONST. REV.

12NOV76 PLAN EL. 433-0 AREA 2 UNITS 1&2 N

S-1244 RADWASTE/ SERVICE BUILDING COMPLEX FLOOR FRAMING M

28 MAR 79 28 MAR 79 CONST. REV.

12f40V7G PLAN EL. 433-0 AREA 3 UNITS 1 &2 N

5-1245 RADWASTE/ SERVICE BUILDING COMPLEX FLOOR FRAMING T

2tNOV80 21NOV80 RECORD 12tlOV7G PLAtt EL. 433-0 AREA 4 UNITS 1 & 2 N

S-1247 RADWASTE/ SERVICE BUILDING COMPLEX L

19JUL78 19JUL78 CotJST. REV.

12tl0V7G FLOOR '74 MING PLAN EL.451-0 AREA 1 UNITS t&2 N

S-1248 RADWASTE/ SERVICE BUILDING COMPLEX J

19JUL78 19JUL78 CONST. REV.

12NOV7G FLOOR FRAMING PLAN EL.451-0 AREA 2 UNITS 1&2 N

5-1249 RADWASTE/ SERVICE BUILDING COMPLEX M

OGOEC78 OGDEC78 CONST. PEV.

12Nov76 FLOOR FRAMING PLAN EL.451-0 AREA 3 UNITS 1 & 2 N

S-1250 RADWASTE/ SERVICE BUILDING COMPLEX V

06JUN80 OGJUN90 CONST. REV.

12NOV7G FLOOR FRAMING PLAN EL 451-0 AREA 4 UNITS 1 & 2

' N S-1251 RADWASTE/ SERVICE BUILDING COMPLEX G

2RNOV77 28tJOV77 RECORD 12NOV76 ROOF FRAMING PLAN AREA 1 UNITS 1&2 N

S-1252 RADWASTE/ SERVICE BUILDING COMPLEX G

140CT77 140CT7/

CONST. REV.

12fl0V76 ROOF FRAMIP3G PLAN AREA 2 UNITS 1&2 N

S-1253 RADWASTE/ SERVICE SUILDING COMPLEX J

21FEB78 21FEB78 FAB REV 12NOV7G ROOF FRAMING PLAN AREA 3 UNITS 1 & 2 N

S-1254 RADWASTE/ SERVICE BUILDING COMPLEX J

03APR78 03APR78 FAB REV 12tJOV76 ROOF FRAMING PLAN AREA 4 UNITS 1&2 tog N

S-1255 RADWASTE/ SERVICE BUILDING COMPLEX F

26DEC79 2GDEC79 CONST. REV.

140CT77 STEEL FRAMIP'G DETAILS UNITS 1&2

n SARGENTxi. UNDY 1

"ENCINEEftO 8

71 M

M DRAWING LIS1 STRUCTURAL DEPARifAD51 DA10 edDott1 P Ar.i M

STRUCTURAL SECTION, COMMONWEALTH EDISON

[lVRON/BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4GR3-4G84 SAFETY DRAWING TITLE REV REV DATE STATUS SPEL.

D A I F.

CLASS.

No.

DATE 155U10 NO.

APPROVf L' N

5-1256 RADWAS1E/ SERVICE BUILDING COMPLEX E

140C177 140CT77 FAB REV 2nNOV7G STEEL FRAMING DETAILS UteITS 1 &2 N

5-1257 RADWASTE/ SERVICE BUILDING COMPLEX H

08APR77 08APR77 TAB REV 19JUL70 COLUMN SCHEDULE UNITS 1 &2 N

5-1258 RADWASTE/ SERVICE BUILDIfJG COMPLEX C

29 MAR 77 29 MAR 17 FAB REV 12NOV7G GIRDER SCHEDULE UNITS 1&2 N

S-1259 RADWASTE/ SERVICE BUILDING COMPLEX STEEL COLUMN E

28NOV77 28NOV77 FEB REV 07FEB77

$UPPORT SCHEDULE UNITS 1 A 7

.m,

-om 7. ;-., ;

r w-e _-+m_

p f-1271 SUPERSEDED BY S-1271-BY & S-1 i i S-SUPERSEDED BY S-1272-BY 272*I e

S-1273

- "UPERSEDED BY S-l'-

& S-1273-1

'A S-1274 "EDED B e

74-BY & S-1274-1 S-1275 SUPERS 4 '

.f S-1275-BY & S-1275-i r

5-1276 5

(DED 276-BY & S-1276-1 5-1277 brERSEDED f S - 1. '

Y & S-1277-l

'1 d

S-t*

SUPERSEDED BY S-1278-BT

-1278-1 279 SUPERSEDED BY S-12?9-RY &S

-f

,,.{

i

'L_

v_._

c_

n _.

n-=

W S-1206 AU4fLIARY BUILDING FLOOR FRAMING PLAN Y

20SEP79 20SEP79 CONST. REV.

09JUL76 E l.. 414-0 & EL. 417-0 AREA 3 UNITS 1 & 2 R

S-1287 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 409-G G

130fC77 13DEC77 CONSI. REV.

17t3 A Y 76 AREA G UNITS 1&2 R

S-1288 AUXILIAR) BUILDING FLOOR FRAMING PLAN EL 415-0 2

15 DAN 81 15 DAN 31 CONST. REV.

20APR7P.

AREA 1 & 4 UNITS 1 &2 9AY7G R

S-1289 AUXILIARY BUILDING FLOOR IRAMING PLAN EL. 414-0 AH 30APR81 30APR81 RECORD AREA 5 UNIT 1 R

S-1290 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 414-0 AB 220CT80 220CT80 CONST. REV.

17 t1 A Y 7G AREA 7 UNIT 2 R

S-1291 AUXILIARY BUILDING FLOOR FRAMING PLAN EL. 414-0 U

30APR81 30APR81 RECOPD 17MAY76 t.REA 5 & 7 UNITS 1&2 R

S-1292 AUXILI ARY BUILDING MEZZANINE FLOOR FRAMitra PLAN Z

OGOCT80 OGOCT80 CONST. REV.

20APR7G EL. 42G-O AREA 1 UNITS 1 &2 R

  • S-1293 AUXILIARY BUILDING MEZZANINE FLOOR FRAMING PLAN AT 05JUN81 05JUN81 RECORD 29M'R7G EL. 42G-O AREA 2 UNITS 1 &2 R
  • S-1294 AUXILIARY BUILDING MEZZANINE Ft90R FRAMING PLAN AM 05JUNB1 05JUN89 RECORD tr'.JU L 7 6 to EL. 426-0 AREA 3 UNI'JS 1&2 O

R S-1295 AUXILIARY BUILDING MEZZANINE FLOOR FRAMING PLAN W

21NOV80 2tNOV80 CGiriT. REY.

09JUL76 nm LL. 42G-0 AREA 4 UNITS 1&2 SADGErlT 1.UtlDY

~

g 72 C3 DaTr.(3cqs PAm sai DRAWING LTST STRUCTURAL DEP ARTMEc4T STRUCTURAL SECTION COMMONWEALTH EDISCN DVRON/BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4302/4083-46n4 SAFETY DRAWING TITLE REV REV DATE STATUS SPEC DRTF DATE ISSUED

.40.

APNOV E D CLASS.

NO.

R S-1296 AUAILIARY mjl'. DING MEZZANINE FLOOR FRAMING PLAN AL 30APR81 30APR81 RECOR9 17t# A ) 76 EL. 426-0 AREA E UNIT 1 R

  • S-1297 AUXILIARY BUILDING MEZZANINE FLOOR FRAMING PLAN AF 05JUN81 05JUN91 RECORD 17 Mat 76 f

E'. 426-0 AREA 6 UNITS 1 &2 R

S-1298 AUXILIARY BUILDING MEZZANINE FLOOR FRAMING PLAN AG 21NOV80 21NOV80 C0f3S T. RE1 17 A Y 7 G EL. J2G-O AREA 7 UNIT 2 R

S-1299 AUXILIARY CUILDING MEZZANINE FLOOR FRAMING PLAN N

220CIPO 220CIBO CON %I. REV.

17 ttA v 76

)

EL. 426-0 AREA 5& 7 UNITS 1 &2 R

S-1301 AUXILIARY BUILDING FLOOR FRAMING PLAN AB 30APR84 30APRSt RECORD 20APR7G l

)

EL.439-0 AREA 1 UNITS 1 & 2 S-1302 U4!LIARY BUILDING FLOOR FRAMING plt.N AU 05JufJ81 05JUN31 RECORO 2CAPR7G l

l R +

EL.439-0 AREA 2 UNITS 1 & 2 S-1303 AUXILIARY BUILDING FLOCR FRAMING PLAN AS 05JUN81 05JUf181 RECORU O",JUL76 j

l R

  • EL. 439-0 AREA 3 UNITS 1 &2 R

S-1304 AUXILIARY 9UILDING FLOOR FRAMING PLAN W

21NOV80 21NOV80 RECORD 09JUL76 l

EL. 439-0 AREA 4 UNITS 1 &2 R

S - 1' JOG AUXILIARY BUILDING FLOOR FRAM'NG PLAN T

ttDEC79 itDEC79 CONST. REV.

17MAY7G l

EL. 439-0 AREA 6 UNITS 1 &2 R

S-1309 AU%1 LIAR" BUILDING MAIN FLOOR FPAMING PLAN AF 15JAN81 15JAN31 FOR RECORD 20APR7G EL. 451-0 AREA 1 UNITS 1 &2 S *380 AUXILIARY BUILDING FLOOR FRAMING PLAN AK 05JUN11 05JUN31 RECORD 2CAPR76

)

4

_. 451-0 AREA 2 UNITS 1 &2 P

S-1311 AUXILIARY BUILDING MAIN FLOOR FRAMING PLAN AK 19fM R81 19 MAR 81 RFCnco ONUL76 EL. 451-0 AREA 3 UN!T5 1 & 2 R

S-1312 AUXILIARY BUILDING MAIN FLOOR FRAMING PLAN AD 220CT80 220Ctha CONS 1.

REV.

09JUL7G EL. 451-O AREA 4 UNTTS 1 &2 R

'i-1313 AUXILIARY BUILDING MAIN FLOOR FRAMING PLAN AA 21NOVhO 21NOVSO RECORD 17PAv76 EL. 451-0 AREA 5 UNIT 1 R

4-1314 AUXILIARY BUILDING MAIN FLOOR FRAMING PLAN Z

15 DAN 81 15JAN31 FOR RFCORD O 2.suf J7 t>

EL. 451-0 AREA 6 UNITS 1 &2 03FEB79 G5FEB79 CONST. REV.

17ttav 76 R

S-1315 AUXILIARY BUILDING MAIN FLOOR FRAMING PLAN EL. 451-0 AREA 7 UNIT 2 R

S-1316 NXILI ARY BUILDING MAIN FLOOR FRAMING PLAN K

3OOCT79 300CT79 CONST. REV.

17MAv76 EL. 4Y -0 AREt.S 5 & 7 UNITS t&2 R

S-1317 AUFILiARY BUILDING FLOOR FRAMING PLAN P

05FEB79 05FEB79 CONST. REV.

14Jutt6 EL. 459-0 AREA 5 UNIT 1 AM 05JUN81 05JUN31 RECORD 02JUf37G S-1318 AUXILI ARY Esu!LDING PLOOR FRAMING PLAN R

EL. 459-2 AREA 6 UN I i &2 R

S-1319 AUXILIARf BultGINii FLOOR FRAMING PLAN R

05FER79 05FEB79 CONST. REV.

14JUL76 EL. 459-0 AREA 1 t) NIT 2 r

S-1320 AUXILIARY BUILGIP7J FLOOR FRAMING PLAN U

220CT80 220CT80 C9NU. REV.

02du176 EL. 4G7-0 AREA 5 UNIT 1 R

S-1321 AUXILIARY BUILDING FLOOR FRAMING PLAN AF 30APR81 30APRRt RFCNi' 02JUNi6 EL.467-4 AREA G UNITS 1 &2 R

S-1322 AUXILIARY BUILDING FLOOR FtJAMING PLAN S

05FEB79 O*./EB70 CONST. REV.

02 don 76 EL. 467-0 AREA 7 UNIT 2 R

S-1324 AUXILIARY BUILEING FLOOR FRAMING PLAN AE 15 DAN 81 15 DAN 31 FOR RICORD 02 JUN 7 r, EL. 475-6 AREA 6 UNIT 1&2 Q

R S-1325 AUXILIARY BUILDING ROOF FRAh.NG PLAN W

71JUL80 OtJUL80

'ONST. 9LV.

OTuv7G e

AREA 1 UNITS 1&2 n

SACGEffT LUf10Y

73 O

M DRAUING LISI STRbCIURAL DEPARIMENT DAlf 4A30n1 P A r.t s.o STRUCTURAL SECTION COMMONWEALTH EDISut4 BYRON /BRAIDWOOD UNITS 1 & 2 PRUJECT NUS 4391-4392/4rg3 4cg4 SAFETY DRAWING TITLE REV REV DATE STATUS SPEC.

DATF DATE ISSUED NO.

APPROVED CLASS.

NO.

R S-132G AUXILIARY BUILDING "DOF FRAMING PLAN AA 15JAN81 15J E 1 FOR RECORD 03ttAv7G AREA 2 UNITS 1&2 R

S-1327 AUXILIARY BUILDING ROOF FRAMING PLAN R

21NOVSO 2tNovdO RECOPD 09JUL76 AREA 3 UNITS 1 &2 R

S-1328 AUXILIARY BUI6 DING ROOF FRAMING Pla.N R

12APR79 12AP279 CONS's. REV.

09JUL76 AREA 4 UNITS 1 &2 R

S-1329 AUX?LIARY BUILDING ROOF FRAMING PLAN L

28M%R79 28 MAR 79 CONST. RFV.

02JUtJ76 AREA 5 UNIT f R

S-1330 AUP!LIARY BUILDING I400F FRAMING PLAN P

28 MAR 79 28M A R 7*.s CONST. REV.

??fEB77 AREA 7 UNIT 2 R

S-1332 AUXILIARY BUILDING R30F FRAMING PLAN J

13NOV78 13NOV78 CONST. RFV.

02JUN76 AREA 6 UNITS 1&7 2'

S 1333 AUXILIARY BUILDING ROOF FRAMING PLAN U

01APR80 01APRSO RECORO O2JUN76 AREA 2 & 3 UNITS f&2 R

S-1334 AUXILIARY BUILDING ROOF FRAMING PLAN H

04 DAN 78 04 DAN 70 CDW,f. REV.

22FEB77 AREA 5 4 7 UNITS 1 & 2 R

S-1335 AUXILIARY BUILDING WISC. FLOOR FRAMIN3 PLANS U

19NAR81 19Mr.R81 C0f JS T. REV.

03!tAV7G UNITS 1&2 R

S-1336 AUXILIARY BUILUING PLAN EL. 500-0 AREA 1 E

2tSEP78 215EP78 RECORD 22NOV7G l

UNITS 1 & 2

.7

  • S-1337 AUXILIARY BUILDING PLAN EL. 500-0 AREA 4 H

05JUN81 05JUNRi RECORD 27t40V76

]

UNIIS 1 &2

)

w..

R S-1339' AUXILIARY BUILDING SECTIONS & DETAILS AA 21NOV80 2tNOV80 CONST. REV.

02SEP75 UNITS t& 2 R

S-1340 AUXILIARY BUILDING FOUNDATION SECTIONS & DETAILS R

10JU'78 10JUL78 CONST. REV.

20&PR76 UNITS 1&2 R

S-1341 AUXIIIARY BUILDING SECTIONS & DETAILS M

11APR78 11APR78 CONST. REV.

23JAN76 l

UNITS t&2 R

S 1342 AUXILIARY BUILDING SECTIONS & DETAILS M

15 DAN 81 15JAN81 C0t45 ;

REV.

22tJOV 7 G UNITS 1 & 2 R

S-1343 AUXILIARY BUILDING J

26MAY77 2GMAY77 C0tJST. REV.

205EP7G SECTIONS UNITS t&2 R

S-1344 AllXILIARY BUILDING SECTIONS & OETAILS N

3OAPR81 30APR81 UCCO*D 09JUL76 UNITS f&2 R

S-1345 AUXILIARY BUILDING SECTIONS & DETAILS UNITS 1 & 2 R

13FEB81 1"FEB81 RECORD 22tJOV /S R

S-1346 AUXILIARY BUILDING SECTIONS UNITS 1 & 2 G

30APR81 30APR81 RECORD 22tJC'/76 R

S-1347 AUXILIARY BUILDING SECT 1bNS & DETAILS W

21NOV80 21NOV80 RECU 1 16AUG76 UNITS 1&2 R

S-1348 AUXILIARY BUILDING SECTIONS & DETAILS Y

21NOV80 7tNOV80 RECORD tGAUG76 UNITS t&2 R

S-1349 AUXLLIARY BUILDING SECTION 210-210 UNITS 1 & 2 P

21NOV80 21NOV80 RECORD 1GAUG76 R

S-1350 AUXILIARY BUILDING SECTIONS UNITS 1 & 2 C

2OJUL77 2OJUL77 CONST.

"TV.

27t40ViG O

R S-1351 AUXILIARY BUILDING SECTIONS J

3OAPR81 30APR81 RECORD 20N3V76 to UN115 1&2 m

SNTGENTXLUNDY

= rNtDNTEt1G

70 Q

ORAWING LIST STRUCTURAL DEPARTMENT DATE nG30P1 PAGr Gt STRUCTURAL 'ECTION COMM0fJWE ALTH EDISON BYRON /BRAIDwo0D UNITS 1 & 2 PROJECT NOS 4391-4392/4603-4G84 SAFETY DRAWING TITLE REV REV DATE STATUS SPES DATE C. ASS.

FJ0.

DATE ISSUFD NO.

APPROvfD R

S-1352 AUT.!LIARY BUILDING SECTIONS & DETAILS AH 30APRR1 30APR31 RECORD 1GAUG7G UNITS 1 & 2 R

S-1353 BLOCK WALL 5

14 J ArJ80 14JAN30 CONST.

"EV.

14GCT7G STEEL COLUMN DETAILS UNITS,&J R

S-1354 AUXILIARY BUILDING COVER PLATE SCHEDULE Y

13riC81 13F EC81 RECORD 03FE377 UNITS 1 & 2 fl S-1356 CABLE PAN EMBEDMENT PLATE DETAILS UNITS 1 &2 F

070CT77 070CT77 Cof1S T. RFV.

O?SEF75 R

S-1357 AU4ILIARY BUILDING EMBEDMENT PLAN d

28AUG80 28AUG30 L"NST. REV.

OPJAN7G EL. 391-G AREA 2 UNITS t S2 R

S-1358 AUXILIARY CUILDING H

02dtfL79 02JUL79 CONsT. RIV.

2GJtN77 SECTIONS & DETAILS UNITS 1& 2 R

S-1359 AUXILIARY BUILDING SECTIONS & DETAILS UNITS 1 &2 8

2tAPR77 21AI477 C0f JS T. REV.

14 tt.a.R 7 7 R

S-13GO AUXILIARY BUILDING SECT!UNS & DETAILS UNITS 1&2 4

21NOV80 2 t rJOVSO CONST. REV.

2tArR77 R

S-1361 AUXILIARY BUILDING SECTIONS UNITS 1 & 2 M

300CT79 300CT79 CONST. REV.

21APR77 R

S-1362 AUXILIARY BUILDING SECTIONS UNITS 1&2 N

09d'JN90 09J'JN90 COPJS T. REV.

2tAPR77 R

S-1363 AUXILIARY BUILDING COVER PLATE SCHEDULE C

3OJUfJ7R 3OJUN78 CorJS T. REV.

21ftAR77 UNITS 1 & 2 R

S-13G4 AUXILIARY BUILDING COVER PLATE SCHEDULE R

05JUL77 05dt:L77 FA9 REV 2 titAR77 UNITS 1 & 2 R

S-13G5 AUXILIARY BUILDING COVER PLATF SCHEDULE C

2tDEC77 21DEC77 CONST. REV.

21rt1R77 UNITS 1 &2 R

S-1366 AUXILIARY BUILDING SECTIONS UNITS t & 2 M

09JUN2O 09JUfJ30 Cor4ST. REV.

21APR77 UNITS 1 &2 R

S-1367 AUXI.IARY BUILDING EMBEDMENT PLAN EL. 346-0 L

O2JUL79 02JUL79 RFCORD O?SEP75 AREA 2 UNITS 1&2 R

S-13G8 AUTILIARY BUILDING EM017 MENT PLAN EL. 346-0 L

15 DAN 91 15dANSt CONI!. REV.

02SEP75 AREA 3 UNITS 1 & 2 R

S-13G9 AUKILIARY BUILDIfJG EMBEDMENT PLAN EL. 346 0 D

24JAN79 24JAN79 FOP RECORD O20EP75 AREA 5 UNIT 1 R

S-1370 AUXILIARY BUILDING EMBEDMENT PLAN EL. 346-0 G

22 dun 77 22JUN7' RECURD 023FF75 AREA G UNITS 1&2 R

S-1371 AUXILIARY BUILDING EMBEDMJNT PLAN EL 346-0 D

24 DAN 79 2 4d Afl79 FOR RECORD O2SEP75 AREA 7 UNIT 2 R

S-1372 AUXILIARY BUILDING EMBEDMENT DEVELOPED ELEVATIONS T

215EP78 215EP78 CONST. REV.

02SEP75 AREAS 5 & 7 UNITS 1&2.

9 S-1373 AUXILIARY BUILDING EMBEDMENT PLAN EL. 357-0 J

22FE078 22FEB78 EECORD O25tP75 AREA 6 UNITS 1&2 R

  • S-1374 AUXILIARY BUILDING EMBEDMENT PLAN EL. 364-0 N

05 JUNE 1 05JUNRt RECORD 07NOV75 AREA 2 UNITS 1&2 R

S-1375 AUXILIARY DUILDING EMBEDr4ENT PLAN EL. 364-0 J

OsJUN80 09JUNPO CONST. REV.

07NOV75 AREA 3 UNITS 1 &2 R

S-137G AUXILIARY BUILDING EMBEDMENT PLAN EL. 364-0 M

tSJAN81 15dANSt FOR PECORD 07NOV75 m

AREA 5 UP IT 1 g

P S-1377 AUXILIARY BUILDING EMOEDMENT PLAN EL. 3G4-0 N

07Nov80 07NOV80 CONST. RI V.

07tJuv75 m

AREA G UNIT 9 1&2 SARGENT ' i.llflDY

-nu

g 9

>= P C2 L 5

th O

.e. c o e e o e c :

t-c e e e e e e o o t

w e-r-

e-r r-e.

r-r-

e-r-

~

e-e-

e-e-

r-r-

~

e-I.

D2 w>

ct

> u ec w

2 2

> 2 cr >

2 2 2

2 a.,

eJ 2

af at L

O 4

at w

t c'

f

.r.

-O O

O t.

as c=

t E

-)

7 E

7 4

2 7

2 3

7 m

4 -- +-

4 7

<t tu

- 2 2

I /

g g

h 3L e-r-

n e-O m

e-tu c;

~

c' c1 O

c r

c3 o-,

e c'e c4 O re N

O

]

O N

r.

o N

O O O O O N

O O re O

p, g

i W

i C.D U -

{

C i

wC C

CL 2 W

o i

1 i

. 2 2

2 l.

0 0

C 0

0 I >

(

w w

P O

w Cr u

w w==

w ma

- w w

w w

w w

un U

U 4

4 4

' :s gg 3

O O

ct it U

e

=

CL Cs CC Cr u u ll C

w w

U O

L O

U O

t c

cr tg

g e-

-==

L

1 ct e.-

m 4 c > -

O 0

0 0

e 2

O 6

cc O

(1 O

O O

O M

e 0

e

f C e.

r w

U 2

2 2

2 2 O

U 2

ID U

L3 2

U 2

2 2 2 2 2

u 2

2 0

2 u a > 2 2 2

2 2

2 s

  • 3 3

O L

3 3

O 3

3 3

O L

3 U

U i

O L'

7 C

7 2

7 7

E E

7 2

2 E

2 7

7 7

2 <

7 e

6 0

W 0 re N

N m O

-0 0

c c-o c O

O O

o e P

i Ce c O

T T

O O

O f7 O O O O -

  • O cd

==

  • r d

['

E O cc e a) e r-10 a;

O cc cc.

O c

- o O

O a3 0

c0 6(-

e-i<

r-a) 03 to a>

r-r-

r-r-

r-w c) r-r-

r-r-

a) e-c) c)

~ a:

s.

2 2 2 > cc 2

O c

tz cr >

2 2

2

> cr 2 c.

i e-3 O

at CL at 3

3

< < < g a 3

3 O

cu 3

U 6.-

e:

U c:

gO

> 2 7

7 2

at 2

7 2

E s

7 7

7 2

at 7

O v

b i

O 1

4 D

o o c.

w n

o e O

o o m w

m c

c e

c.

w w

O n -

- - 0

- - O I

O N

- - - O O O O w

O N

ti ce n O h

Nn L

c-w r*

2 2

6 la-w 0 0 0 > 2 U

"3 n.J 3 > 3

.J Z

4 O

6 0

6 3

9 r

e 0

O f

n' r

20 OO O2 u 2

?

m 06-O O O O O O O.

O O O O O O O.

O.

O at wu e

e e

e e

e e

e e

N J

ee w

v w t-r-

r-r-

M ri t'3 r1

- * *= - *= -

CL

>O M

M n n M

f1 n

f1 M

M v

9 9

9 9

v 2

2 L'

27 C

t-r-

CD CD 03 c3 O O O O O O

'I 4

O 2

.J

_J &

==

I 5

CL aC CL

+

+

.J

.J J

J J

J

.J

.J J

.J J

.J

.J

..J

'2 P'

t,,

.J J

.J 3N w

w e.J w

Nw anJ w

w w w L.J w w w

w w

4 O

O

=*

1 ZOe 2 2 2 2 242 2 2 2 2 2 2

2 2 2 2 2 2 2N 2

k 2

at at at at 4

4

=t at at 4

at at at at at at at at at 3

C U

.3 2*

J

.a

_J J

.J

.J

.J J

J J

J J N.J J

J J

w J

J eo O

C-W t

O CL CL CL CL 9

CL CL CL CL 4

Cu CL a

CL 4

C6 CL CL C.

i 4w 0

m l

VW M

e5

=~

e-W e.-

>p->=

H e-M 6-H H

>=

b F

3Y Y

X 9,

==

J Z

2 2

2 Z== Z 2 2 2 2 2 2-2 2 2 2 2 2 2

.W.-

2 2

2 1

2 2

w w

w w

w2w w

w w

w w

w w

w w

w w

w w

- at at at

.2 3

=

2 2

2 2

231 E

E X

E 2

EWE E

E E

E 2

2=

M

  • =

0 O

O O

O

)

O O

O O

O Q >- O O

O O

O O

C2

1 c

0 w

w w

w wow w

w w

w w

w ** w w

w w

w w

w3 i-w w

J w

C3 D

CO C3 L3 2 c3 to

!C CD CD CD N CO

=0 0

f C

4 O

C3 C3 N C3 C3 r3 e to E"

E E

E E

2DE E

2 E

E 1

Eb

-E<

4 L

L O

2 E

E 2

2@E i

"3 Cr i

2 e

12 w

3 w

w ee W w

w c-w w w w w w

w w

w w w

w w e5 w o

e4 O

n O

O O

O nONONONONONONO2ONONONONONOec J

at 2

2 2 2 2.J 2 2 2 2

t 2

2-2 2 2 2

2 2 20

.Je

'h o

'S P-11 >.

c i-e-

==

4.5 O *- O N O N O e

= m== e5== ee== w e6== e5 = ee e e5

  • e6 *= ec ** 2 =
  • e6 ** e5== ee *= 4== e5 ** W a.*

at Cr

==

-w w

o w

-4

,14 m

C U

C O

O>0 0

0 0 0 0 0

O O

Owo O

O O

O OHOW In'w 3

N J

J==J JeJO.J*.JeJ J

Je.J J ct J

.J

.J J

.J - J **

.J at

== 2 w

.s e.-

I p.

F

==

me em we w m.e

==

p 2

rg== 2==

-e Z==

air f~

U 20 3

333m3m3==30303O30303M3 3 m 3 M 3 m 3 e 3 e 3 3 3 cr L at at at 3

O2

-Q e-to sc > c >- CC 2 c0 > Q H Q >- 03 H CG e-c3 > d2 & 03

  • CO > r3 6-CD >- Q H to c3 at 3

c3 N 3r N 3 '.

JB L

==

6-C*

>2>

>2>2>cr>2>2>2>2>2>2>O>2%2>2>2>2>

>0 5

C t-i O e5 0 eo d'

'S 1

2

= = *

==

t-

** <== = =* - **

(*

e2 2

2 cr 3 cr et tr a u 3 Cr 6 c 3 2 3 3.1 3 tr 3 cr a tr 3 Cr.J u a e 3 a a cr 3 a 3 cc ee Ct

'g' a

e U

at at at a

4 a

f==-==*s=

==== n me (*)== v e t Q== @ a.t v 4

at at at at at w <

>= r-.4. O se a,

e**

O d J

.J w

- e= q em.J== e- ** v s.m to== (") og T== Q em e.e

,- e

.b LaJ @ w W w

~

.J

.2

.) L o J

J

.J J

.J

.J e.J

.J J

.J J

JM

- y w at== at J at eJ at me 2 e.J at== at om U== at== at== ait om at,.J 0

- 3 >. 3 >= 3 r

at== <== at em at we e at me at e.e e

ew

_J a

3 cz 3 a D ec D a 3 3 D cz 3 cz 3 cr 3 a D er D e 3 - D cr D a 3 a 3 cr D er D cr 3.J

. Ja 6 me 6 *a 6 L

L) x w x w V w x w x 2 W w W w X w W u W w W W X @ v w >': wWwXwXwXwX -

U 0

3 at < < 4 at at at 4 at >= at at 4 at 4 at at at 4 4 at at at 2 at < 58 af as at at at 4 at sa at =1 w 0

w2uZw s

23232 r

Z H

~

U I

< e r

l5 - !

3 3

2 F

O O

O re r9 w o t-O O

M

=r e

{-

c4 m o to P-a) ci 0 2

a)

O

~.

N vi e w m m m C

D E

O O

O O

O O

O O

O O O O

,9-C1 r7 r'3 r3 M-f7 M

(1

(")

M C')

O c's 9

v 9

O,-

3O 19

(")

M tJ e

e e

gg tr s

e e

e e

e e

e e

s e

e e

e a

e e

e e

a e

s O

O O

M M

O W

M O

O O

W W

O M

M M

.i O

O O

i i

i n

y we 2

2 2

2 E

E E

2 2

2 G

2 2

2 F

Q a.

4

)

<A

@U Oc-90CC

76 g

ch ORAWIPG LIST STRUCTURAL DEPARIMIPdi DATF e Eto+t t t Auf r> 1 STRi1CTURAt. SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJFCT NOS 4391-4392/tr,83 4GR4 SAFETY DRAWING TITLE REV REV DATE STATUS SrEC.

Dart DATE ISSUED t:0.

APrROVED CLASS.

NO.

^ T :. -

w

=

- y R

_T y

y.

R S-1408 FUEL HANDLING CUILDING F

0500T78 050Ct78 RECURD OtNAd76 CULUMN SCHEDULE UNITS 1 &2 R

S-1409 FUEL HAtJDLING BUILDItJG C

OtJUN17 OtJUN77 FAB RTV 27MA)76 CONCRETE COLUMN SCHEDULE UNITS 1&2 R

S-1411 FUEL HANDLING BUILDING C

09NOV7G 09tJOV76 CONST. REV.

04AttG76 SLAB 3CHEDULE UNITS 1&2 R

S-1412 FUEL HANDLING BLDG GIRDER SCHFOULE & BLOCK WALL F

090CT79 090CT79 CONST. REV.

2GdAN77 STEEL COLUMN SUPPORT SCHFDULE UNITS 1&2 R

S-141G FUEL HANDLING BUILDING FLOOR FRAMING PLAN J

28FEB80 2RFEB80 CONST. REV.

2OJUL76 EL. 411-0 AREA 2 UNI 15 1&2 R

S *487 FUE L HANDLING BUILDING Ft.00R FRAMING PLAN 5

17APR80 17APR80 CONST. PEV.

2OJUL76 EL.42G-O AREA 1 UNITS 1&2 R

S-1418 FUEL HANDLING BUILDING ILOOR FRAMING PLAN N

26DEC79 2GDEC79 CONST. REV.

04A8'G76 EL. 426-0 AREA 2 UNITS 1 & 2 R

S-1419 FUEL HANDLING BUILDING ROOF FRAMING PLAN D

050C178 050CT78 RECORD 04AUG76 EL. 427-G AREA 3 UNITS 1 &2 R

S-1420 FUEL HANDLING EUILDING ROOF FRAMING PLAN H

050CT78 050CT78 RECORD 04AUG76 Ei.474-0 AREA 1 UNITS 1 & 2 R

S-1421 FUEL HANDLING BUILDING ROOF FRAMING PLAN F

MSEP79 OGSEP79 CollS t. REV.

04AUG76 EL.474-0 AREA 2 UNITS 1&2 R

S-1424 FUEL HANDLING BUILDING CRANE GIRDER & RAIL PLAN E

2tJAN77 2tJAN77 CONST. REV.

13AUG76 AREA 1 UNITS 1&2 R

S-1425 FUEL HANDLING BUILD!f0 CRANE GIRDER & RAIL PLAN O

09 MAR 77 09 MAR 77 FAB REV tLAUG7G ARFA 2 UNITS 1&2 R

S-1426 FUEL HANDLING BUILDING CRANE GIRDER & RAIL F

23NOV77 23NOV77 FAB PEV 13AUG7G SECTIONS & DETAILS UNITS 1 & 2 R

S-1427 FUEL HANDLING BLDG CRANE GIRDER O

23JdN80 25JUN90 CONST. REV.

035EP76

& RAIL SECTIONS & DETAILS UNITS 1&2 N

  • S-1438 DIESEL GENERATOR EXHAUST SUPPORT F

29MAY81 29MA181 RECORD 220Ut477 PLANS, SECTIONS & OETAILS UN115 1&2 N

S-1440 TURBINE BUILDING STEEL COLUMN H

13FEC81 13FEB81 CONST. REV.

01NOV7G SUPPORT SCHEDULE UNITS 1&2 N

S-1441 TURBINE BUILDING TOP & BOTTOM REINFORCING C

04AUG77 04AUG77 RECORD tsPEC76 PLAN EL. 426-0 UNIT 1 N

5-1442

'iURBINE BUILDING TOP & BOTTOM REINFORCING D

05JUN78 05JUN78 FOR RFCORD 200EC73 PLAN EL. 426-0 UNIT 2 N

5-1443 TURBINE BUILDING TOP & BOTTOM REINFORCING 0

02JUN77 02 dun 77 CONST. REV.

090EC76 PLAN EL. 451-0 UNIT 1 N

S-1444 TURBINE BUILDING TOP & BOTTOM REINFORCING B

04AUG77 04AUG77 CONST. REV.

070LC76 PLAN EL. 451-0 UNIT 2 N

S-1445 TURBINE ROOM SECTION 4-4 UNIT 1 J

12MAY80 12MAY80 CONST. REV.

OtSEP7G N

S-144G TURBINE ROOM SECTION 4-4 UNIT 1 AD 28AUG80 28AUG30 CONST. REV.

O t';E P 7G N

S-1447 TURSINE ROOM SECTION 4-4 UNIT 2 V

1BMAR81 18 MAR 81 RECORD Olst s*76 N

S-1448 TURBINE ROOM SECTION 4-4 UNIT 2 G

12MAY80 12MAYBO CONST. REV.

OtSt.P76

=

SARGENT: LUNDY

> F NGINF f"rtD

h esO M

Q I

DRAWING LISV STRUCTUROL DEPARTMENT DATE OG3091 r u.t 67 STRUCTURAL SECTION COMMONWEALTH EDISON l

BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4 391 - 4 ~19 / 4 E 8 3.1 ti81 SArETY DRAWING TITLE REV REV DATE S T A T L's irl c.

DATE DATE ISSUED FJO.

AFOROW D i

CtASS.

f 40.

"~

' INI iOW~D T

E ATT0llUt b' 2.

Np

- nNT AltJt1EtJf BUILDING MISC. WALL ELEVATIONS UNIT 2 E

160CTFO 1GOCT90 CONST. REV.

. M,

[

09 Ati'.

h S-153.

T JT AltJMEtJT CUILDItJG PRESSURIZER ENCLDSURE K

22k1V 79 22MAY79 CotJ%i. R5 "

. 4 1 ELEVATION AREA 8 UNIT 2 5-1540 COEi th...

tJILDING SiE AM CENERATOR P

.53EPRO 25SErno v.

Oa AIF.

fl i.

b

[NCLOSURE %

DEV. Et.EVATION AREA 5 UNIT 2 K

25SErPO ~

CutJST. REV.

09309 E Y

S-1541 C0tJTAlfJMENT Bul QT

,QEAM GENERATOR E tJC LOSUR E EATERIUR't Q MJVATION ARE A 6 UNIT 2 3

d S-1542 CONT AINUIEtJT BUILDING Sir e.D4 RATOR i

'J2MAY79 CONSI. RFV.

090'.

q ENCLOSURE EXTERIOR DEV. LLEVA&4 EA 7 UrJIT 2 p

j S-1543 CONTAINt1ENT BUILDING SIEAM GENERKI N 2?MAY79 22MAY79 C0tJS T. REV.

09AUT

j ENCLOSURE EXTERIOR DEV. ELEVATION AR M

. [.,

J 31JUL80 31dulBO CONST. REV.

00AUG l

S-1544 CONTAltJNfNT BtlILDING STEAM GENERATOR j

INTERIOR DEV. ELEVATI0t

'tII T 2 BUILDING STEAri GF # j,,,,,A t

EtJCLOSURE mrraO 25SEPbo CONST. REV.

C R t.U C ';*

j R

S-1545 CONT A INtAENT E tJCLOSURE INTERIOR DEV.

..uN AREA 6 UNIT 2 j

g S-154G CONTAINMENT BUILDIt" de-CE NE R A T OR d

3 8 JU

'"t. 8 0 CONSI. REV.

0" AUG ji l

l ENCLOSURE INTF

, / ELEVATI0fJ AREA 7 UNIT 2 Oa AUC$ ;q l l S-1547 CONT AINMr '.' p OING STEAM,ENERATOR L

31dulHO 31dul,

'mi, REV.

j l

E NC'

' i,WTE RIOR DEV. ELEVATION AREA B UNIT 2 i

/

S-1548

' JNT BUILDING R. C.

PUNP ENCLOSURE C

15NOV78 15N0478 COtJ5 '

09AUG l

l

>Ii LEVATION AREAS S & 7 UNIT 2 t

I CONTAIN'AENT GUILDING R.

C.

PUMP ENCLOSURE D

050CT78 050CT78 CONSt. REV.

DeAUL 1

l e

i OfV. F.LEVATION AREAS 5 & 8 UNIT 2 u

% $ re 9,

,m ent nrcorn N

" nigi.e m i t e n_r e nc r n+ ten a uru t e r r r rnese i

h.

, y -

r R

S-1551 AUAILIARY UUILUING SEG l i$f7S UNI T S 1 6 2 01 1Ybts._. tt todut/8 Ot$1.

Lv.

l iUU w' R

S-1552 AllAILI ARY BUILDING SECTIONS & DETAILS E

2OSEP79 2OSFP79 C0tJS T. REV.

05MA'iTG UNITS 1 &2 R

S-1553 AUXILIARY BUILDING SECTIONS & DETAILS D

O2NOV77 02NOV77 CONST. REV.

OMAY76 UNITS 1 & 2 R

S-1554 AUXILIARY BUILDING SECTIONS & DETAILS H

07NOV80 07NOV80 CONST. REV.

17MAv76 l

l l

UNITS 1 & 2 R

S-1555 AUXILIARY BUILDING lECTIONS G

14 DAN 80 14 d Af J90 CONSI. REV.

17MAy7G l

UNITS 1 &2 R

S-1556 AUXILIARY UUILDING SECTIONS & DETAILS F

29NOV76 29NOV76 C0tJS T. REV.

17 PAY 7f l

LNITS 1 &2 R

S-1557 AUKILIARY BUILDING SECTIONS o DETAILS H

15 DAN 81 15dANSI RECORD 01 dun 7G UNITS 1 &2 R

S-1558 AUXILIARY BUILDING SECTIONS H

220CT80 220CT80 RECORD 01dutGG UNITS 1 &2 R

S-i559 AUXILIARY BUILDING SECTIONS & DETAILS F

16 MAR 78 16 MAR 78 FACRICATIOtJ 01dutJ 7G UNITS 1 &2 R

  • S-1560 AUXILIARV BUILDING BLOCK WALL STEEL AN 02 dun 81 02JUN81 CotJS T. REV.

1WAV7G COLUMN SCHEDULE UNITS 1 &2 so Q

R S-1561 AUXILIARY BUILDING BLOCK WALL AJ 15dVL80 1500L80 CONSI. REV.

O tStP t6 STEEL COLUMN SCHEDULE UNITS 1 &2 m

SMGENT sI.UflDY T HOINrt:rm j

Gl Q

Q

=

DUAD!NG LIST STRUCIURAL DEP6Rittf 941 DATF o mm:

e m.1 a9 STRUCTURAL SECTION COMMOf4 WEALTH EDISDN BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/46R3-4G84 SAFETY DRAWING TITLE RFV REV DATE STATUS SPEC.

DATE CLASS.

NO.

DATE ISSUED tJD.

ArrrovtD R

  • S-156

AUXILIARY BUILDING SECTIONS & DETAILS H

05JUN31 05dNr 81 RECURD OtJt'N76 UtJITS 1 52 R

S-1563 AUMILIARY BUILDING 3ECTIONS & DETAILS J

15dAtJ81 150.'*e RECUfm 01du? J76 UtJI T S I &2 R

S-15G4 AUXILIARY BUILDING SECTIONS & DETAILS G

22DCTHO 22DCT80 RECDPD

01. It W 7 G UNITS 1 & 2 i

m -. y '

'--Q

-y R

S-1566 AUAILIAr<f BUILDING SECTIONS & DETAILS S

30APRS1 30ArR81 RFCORD 27JUL76 UNITS 1 & 2 N

235EP80 235EPRO CONST. REV.

14JUL76 R

S-1567 AURILIARY BUILDING SECTIONS & DETAILS UNITS 1 & 2 S-15G8 AUXILIAR) BUILDING FR AMIrJG PL AN EL. 463-5 AH 05JUNR1 05JUN91 RECORD 035F P76 R

  • AREA 2 UNITS 1 &2 S-15G9 AUt!LIARY BUILDING FRAMING PLAN EL. 463-5 AG 05JtN! 1 05dunst CONST. RIV.

03stP7G R

  • AREA 3 UNITS 1&2 R

S-1570 AUXILIARY BUILDING SECTION 370-370 V

13FECHI 13 F E C 91 RECORD 16AUG7G UNITS 1 &2 R

S-1571 AUXILIARY BUILDING SECT!ON 371-371 P

23SEP80 235EP80 CDNST. REV.

16 411G7 6 UNITS 1 & 2 R

S-1572 AUXILIARY BUILDING SECTION 372-372 AF 19 MAR 81 19 MAR 81 RFCORD 16AUG76 UNITS 1 &2 R

S-1573 AUXILIARY BUILDING SECTION 373-373 AA 20AUGa0 28AUGRO CONST. REV.

16AU376 UNITS 1 & 2 R

S-1574 AUXILIARY BUILDING SECTIONS & DETAILS Y

19 MAR 81 13 MAR 81 CONST. RFV.

16AUG76 UNITS 1 &2 R

S-1575 AUXILIARY BUILDINC SECTIONS & OETAILS H

12MAY77 12 HAY 77 CONST. RFV.

21APR77 UNITS 1 &2

^~

r_

. mm;;

s.

.u J,

DROGEN & NITROGEN STORAGE & UNLOADING AREA F

15AUG79 15AUG79 CCNST. RTV.

Z/

S-1578 RIVEN STEAM GENERATOR FEED WATER PUMP C

28 MAR 78 28 MAR 73 CONST. F 03duf J 7 [8

]

F'U N %.,

NS & DETAILS UfJI TS 1 &2 S-1579 MISC OUTO'O N %,

,r5 E

01AUG90 01 M !"

REV.

25 mar:

m l

c; PLANS SECTIONS A'% Q M

S-1580 GIRT F R At'I NG COLUMN ROV',

TS 1&2 P

vMAy77 CONsi. etV.

2?rtAR; 4

S-1581 GIRT FRAMENG COLUMN ROWS A.

L & d5 a

08MAY78 08MAY78 FAB REV 2 T 'U V 1 2

UNITS 1 & 2 W

5-1582 GIRT FRAMING COLUMN ROWS AA.

" R 13 DAN 7P rDt1ST. REV.

22MAC ;!

11, 25 & 32 UNITS 1 &

- k S-1583 GIRT F R AMING CD

4ITS 1 & 2 L

25 Aln,

DNt REV.

2 2 Mt.R i

)

L S-1584 e

ULUMN ROW L UNIT 1 N

13dUL77 13dUL77

? ? ? t A'?

i i

k M RT FRAMING COLUMN ROWS E & 37 UNIT 2 J

25MAY79 25MAY79 CON 5'.

RFV.

a

, -,_n - _ -

~~

_,g SARGEllT' LUUDY

___J9 NfWT f7 FW

82 b

O k

DRAWIt.O LIS1 STRUCVURAL DEPARTMENT DATE OG3081 vAGF G9 STRUCTURAL SECTION COMMONinEALTH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4083.tGud 9

SAFETY DRAWING TITLE REV REV UATE STATUS

Dr. i f CLASS.

NO.

DATE ISSUED t Jo.

Arreov 13 -

--~7(,

_3 r

r

s -

til RT FRAMING MISCELLANEOUS ELEVATIONS H

29%PR77 29APR77 CONST. FLV.

'f

,H MT 1 Uf4ITS 1&2 d

5-1583

1. NLQNG MISCELLANEUUS FLEVATIONS E

2GJUL77 2GJUL77 FAG REV OGAUG j

SHE l

5-1592 GIRT FRAMI NTAILS F

13SEP78 13SFP79

<v I?aut l

SHEET 8 UNITS 1 & 2N, r4 S-1593 GIRT FRAMING SECTIONS & Ot.

F OMr*

w V77 CONST. REV.

30"At l'

4 SHEET 7 UNITS 1 &2 C

S-1594 GIRT ' >\\M ANG SECTIONS & DETAILS 02AUG77 O2AUG77 FAP. REV.

31 *.t a r h

SHEET o UNITS I &2 S-1595 GIRT FRAHING SECTIONS & DETAILS

" tN"O 24JUN80 CONST. PEV.

22f t? P h

SHFET 1 UNITS 1 &2 L

22APR,,

CONST. REV.

22"AR S-159G GIRT FRAMING SECTIO""

a g'

SHEEI 2 UNIT k

Y S-1597 GIRT FP' NS & DETAILS R

28APR78 28APR78 u

'V 07APR J7 fri 1 & 2 N

S - t ro" t it MING SECTIONS & DETAILS E

30AUG76 30CG7G CONST. PEV.

OtPAv L)

JEET 4 UNITS 1 &2

.- (

<ior ruantw-creTrn m r nry re e o

n.

r~

e, I

a r

-~

l Y

.3 OirliTIT R

SWik;u Au i! ETA RT B'0 l LO I EML72 AN 1' d.TUliR' P L AN 2

264!M u, iTE.au turn t. wLv.

[L. 42G-O AREA 1 UNITS 18 2 R + S-1601 AUXILIARY BUILDING MEZZANINE FLOOR PLAN AN 05JUfJ91 05JU?iS 1 RECORU 01rJ3v7G CL. 426-0 AREA 2 UNITS 1 & 2 R + S-1602 AUXILIARY BUILDING MEZZANINF FLOOR PLAN AF 05JUf18 ! 05JUNM1 RECORD 01NOV76 EL. 426-0 AREA 3 UNITS 16 R

S-1003 AUXILIARY BUILDING MEZZANIf.6 FLOOR PLAN Y

21HOV80 21NOVRO CONST. REV.

01tnV76 EL. 426-0 AREA 4 UNITS 1 &2 R + S-1604 AUXILIARY BUILDING MEZZANINE FLOOR PLAN AC 05JUN81 05JUNB1 CO*JST. REV.

01Nov7G EL. 426-0 AREA 6 UNITS 1 &2 R

S-1605 AUXILIARY BUILDING FLOOR PLAN AB 3OAPR8e 30APR81 RECODO 01NOV7G EL. 439-0 AREA 1 UNITS 1 &2 R

S-160G AUXILIARY BUILUING FLOOR PLAN U

08AUG79 09AUG79 CONST. REV.

OtrJOV76 EL. 439-0 AREA 4 UNil5 1 &2 R

S-1607 AUXILIARY BUILDING MAIN FLOOR PLAN AK 13FEUS1 13FEB81 RECORD 01f 40 V76 EL. 451-0 AREA 1 UNITS 1 & 2 R + S-IGO8 AUXILIARY BUILOING MAIN FLOOR PLAN AJ 05JUfJS1 05JUN81 RECORO OtNOV76 EL. 451-0 AREA 2 UNITS 1 &2 R + S-1G00 AUXILIARY BUILDING MAIM FLOOR PLAN AM 05JUN81 0avuN91 CONST. REV.

01NUV7G EL. 451-0 AREA 3 UNITS 1 &2 R

S-1610 AUXILIARY BUILDING MAIN FLOOR PLAN AB 21N0'f"O 91tJOV80 RECORD Off30V7G EL. 451-0 AREA 4 UNITS 1&2 R

S-1611 AUXILIARY BUILDING MAIN FLOOR PLAN U

15 DAN 81 15 DAN 81 FOR RICORD 22APR77 EL. 451-0 AREA 6 UNITS 1&2 S-1612 AUAILIARY BUILDING FLOOR PLAN Z

05JUN81 05JUN11 RECORD 22APR77 R

u>

EL. 459-2 AREA 6 UNITS 1 &2 Q

R S-1643 AUXILIARY BUILDING FLOOR PLAN Z

30AP<Rd 30AFR81 RECORD 22AFR77 m

EL. 467-4 AREA 6 UNITS 1 &2 SMGENT ' l. UNDY

b g

Q3 O

DAIL t s.. lot' 1 P A rJ 7t>

DROWING LIST STRUCTURAL DEPARIMEPM STRUCTURAL SFCTION COMMONWEALTH EDISDN BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-439?/4GR3-4G84 SAFETY DR AW irJG TITLE REV REV DATE STAIUS SPEC.

DATE DATE ISSUED NO.

APPROVED CLASS.

NO.

R S-1614 AUXILIARY BUILDING ROOF WALL PLAN H

2OJUL79 2OJUL79.

Cat 4ST. REV.

22NOV76 AREA 1 UNITS 1&2 R

S-1615 AUXILIARY BUILDING ROOF WALL PLAN J

3OAPR81 30APRR1 RECORD 22NOV76 AREA 4 UNITS 1 &2 R

  • S-1G1G AUXILIARY BUILDING PLAN EL. 463 5 AREA 2 AG 05JutJ81 05JUN81 RECORD

.erEc77 UNITS 1 &2 S-1G17 AUXILIARY BUILDING PLAN EL. 463-5 AREA 3 T

05JU.181 05JUN81 CCNST. REV.

1at g77 R

  • UNITS 1 &2 R

S-1618 AUXILIARY BUILDING FLOOR PLAN AT EL. 477-0 P

13FEB81 13FEB81 CONST. REV.

O#APR77 ARFA 2& 3 UNITS 1 &2 R

S-1619 AUXILIARY BUILDING FLOOR PLAN T

15JAN81 15 DAN 91 FOR PFCORD O2JUN77 EL. 475-6 AREA G UNITS 1 &2 R

  • 5-1620 AUXILIARY BUILDING FLOOR EMBEDMENT PLAN T

05JUN81 05JUN91 RECORD 03AUG77 EL. 439-0 AREA 2 UNITS 1 &2 R

  • S-1621 AUXILIARY BUILDING FLOOR EMBEDMENT PLAN P

05JUN91 05JUN81 RECORD 31AUG77 EL. 439-0 AREA 3 UNITS 1&2 R

S-1623 BLOCK WALL STEEL COLUMN DETAILS A

15JUL80 15JUL30 CONST. REV.

15JULPO U*f f M i F.

-2

~W' 17,.,g M. _

a-'

'?_

~

R 5-1025 AUXILIARY BUILDING H

2GAUG80 2GAUGCO CutJS T. REV.

O t tJGv 76 SECTIONS & DETAILS UNITS 1 &2 R

S-1628 AUXILIARY BUILDING FLOOR EMBEDMENT PLAN F

05JUL77 05JUL77 SUPERSEDED 1EOCT76 EL 439-0 AREAS 2 & 3 UNITS 1&2 R

  • S-1629 AUXILIARY BUILDING SECTIONS & DETAILS S

11JUN81 11JUtJ81 CONSI. REV.

09.idN77 UNITS 1 &2 R

S-1630 AUXILIARY BUILDING SECTIONS & DETAILS G

235EP80 23SEP80 CONST. REV.

02JUN77 UNITS 1&2 R

S-1G31 AUXILIARY BUILDING C

30APR81 30APR81 RECORD 04 DAN 78 SECTIONS UNITS 1 &2 R

S-1632 AUXILIARY BUILDING V

15dAtJ81 15d AtlR 1 RECORD 21DEC77 SECTIONS UNITS 1&2 S-1633 AUXILIARY BUILDING U

05JUNP1 05JUtJ81 RECORD 09 MAR 78 R

  • SECTIONS UNITS 1 &2 R

S-1634 AUXILIARY BUILDING K

11DEC79 11DEC79 C0flS T. REV.

04 DAN 78 SECTIONS & DETAILS UNITS 1&2 R

S-1635 AUXILIARY BUILDING L

15 DAN 81 15datJ81 CONST. REV.

07FEP.78 SECTIONS & DETAILS UNITS 1 &2 N

5-163G AUXILIARY BUILDING BUTTRESS PLATFORMS A

04 DAN 79 04 J AtJ7 8 FABRICATION OSJAN78 PLANS, SECTIONS & DETAILS UNITS 1 & 2

^^

%. c.- ::

=~r-

~

}

r it,.

~

- L

,3

~

ar-tv-t-n,

UN fTS* t -6 hm

-_gC,

l NhCJM,L.LTNG FOUND ATION SECTIONS E

23SEP80 23SEP80 VOID

[

.uiu

14Jt, d

S-1639 AUX I LI ARY BUI Luita. t utAW -

F Og,w UNITS 1 &2 O

14 dt "'

S-1640 AUXILIARY BUT__j_n f F 94"vtF.

'e t

-M %

., p "i

^ -

1 n

2'1.L:

r

~%i-i

,wA 3 m * *w = _a v a n _ r eo.- *

  • f_

- w r o m'fT.W p f P r e r r T r* A Y p iT c O

T

~ ~

~' ""

T' 13 ; o T e): kE L 1[*,~*

e 4H~t l \\,51DLT T ~_ F

'_?

'*'~~C SMGEtlT 1.UllDY J r NfirPJFPGD*7

CS M

4O i

DRAWING LIST STRUCTURAL DEPARTMtf4T DAll f uloa t 0 3 r.t 7.*

STRUCTUPAL SFCTION COMMONWEALTH EDISON BYRON /BRAIUWOOD UNITS 1 & 2 PROJECT NOS 4 391 - 4 392 /4 GB:t 40814 SAFETY DRAWING TITLE RIV REV DATE SIATUS srEC.

OttE CLASS.

NO.

DATE ISSUED fJ0 ArrROvFD i,.

-V y

M t tf**k t 7 t R A7f7f t*f*1m m t erre t?P 1 Att-TUMI 1 s CONIAth* BENT EUILDING SAIET't INJECTION LINE d

200CT79 2GOCT79 CONST. PFV.

g' g

Wil!P RESTRAINTS PLHS. SECT & DETAILS UNITS i &2

.f S - t t,,

fiNT Alft1ENT RUll0ING SAFE T Y INdECTION LIPvt il 2GOCT79 2 GOC 179 CONSI. PI V.

18 '* w M FSTRAINTS PLNS. SECT & DETAILS UNITS 1 %2

]

S-1600 CU% ' '**QTBUILDING SAFETY INJECTION LINE L

17dUL80 170Ulf10 CONST.

ICup WilIP he g 74TS PLNS. SECT & DETAILS UNITS 1&2 S-tGS1 CCNTAINPtEN N..TNG SAFETY INJECTION LINE D

27 DON 79 27dt1N79 REV.

1USAR WHIP PESTRAINis "ECT & DETAILS UNITS 1&2 5-1GB2 AtJXILIARY BUILDING

& VOLUMN CONTROL PIPE D

27duM79 C0f 4"= T. REV.

1Grun t-RFSTRAINT PLANS UNITS 1N 27duf479 CCHST. REV.

ICutR 5-1683 AutILIARY BUILDING Cl4Ef4!C AL%.,

"4 CONTROL PIPE D

RESTRAINTS SECTIONS & DETAILS Uid N 7

S-1684 AUXILIARY BUILDING CHEMICAL & VOLUMfN PIPE 2700N79 27duf 479 CONST. PEv.

tCMAR j

S-1695 CONTAIN".1ENT BUILUING 6* FEEDWATER PIPE Wit H

27 DON 79 27 DUN 79 CONST. REV.

190VN ~j RESTRAINTS SECTIONS & DETAILS UNITS 1& N w

~

1 RESTRAINTS, PLAN. SECTIONS & DETAILS U" 2

S-1686 CONTAINf1FNT BUILDING 6* FEEDWATFD itIP

"' 't if 479 27dUf479 CONSI. REV.

19duti l

RESTRAINTS PLAN. SECTIONS & J

. UNITS 1 &2 S-1G87 CONTAINMENT BUILDING G* V rC R PIPE WHIP O

2701

'-' FUN 7 9 CONST. REV.

I NUf J RE STRAlfJTS PLAN. SFP

,e DETAILS UNITS 1 &2 l

S-1688 CONTAINMENT Buit'

',,FEEDWATER PIPE WHIP D

27 DUN 79

270,

~ ONST. REV.

1% fMN

  • 1 RESTRAINie TIONS & DETAILS UNITS 1&2 s

194UN il 5-1699 CONTAJ tf LDING G" FEEDWATER PIPE WHIP F

27 DUN 79 27duf379 r.o k

j PT/'j PLAN. SECTIONS & OETAILS UNITS 1A 2 a

S-169G

,p"St!P RESTRAINT AS BUILT DIMENSIONS A

23MAY80 23MAY80 RECORD 2 3M A 's '

sliE E T 1 UNITS 1 &2 PIPE WHIP RESTRAINT AS BUILT DIMENSIONS SHEET-2 A

17dOLRO 1700L80 RECOPO 97dUt' UNITS 1 &2

~

ev 2.; w

- 4cm n ey

. << gg4p r

- wrecemy 7-o E

S-1700 FLOOR LOADING $1GNS B

070CT77 070CT77 FACRICATION 30DEC7G DETAILS & SCHEMES UNITS 1 &2 R

S-1701 AUXILIARY BUILDING FLOOR LOAD P.O DIAGRAM B

070CT77 070CT77 FtBRICATIOfJ 300EC76 EL. 330-0, 34G-0, 357-0 8 3G4 0 UNITS 1&2 R

S-1702 AUXILIARY BUILDING FLOOR LOADING DIAGPAM B

070CT77 070CT77 F APR I C A T I GtJ 30DEC70 EL. 383-0 & 401-0 UNITS 1& 2 R-S-1703 AUKILIARY BUILDING FLOOR LOADING DIAGRAM C

070CT77 070CT77 FARRICATION 3OUECTG EL. 42G-O & 439-0 UN!TS 1 &2 R

S-1704 AUXILIARY BUILDIN FLOOR LOADING DIAGRAM B

070CT77 070CT77 FAP.RICATION 3OOEC7G EL. 4S1-0. 459-2 & 467-0 UNITS 1&2 R

S-1705 AUXIL13RY BUILDING FLOOR LOADING DIAGRAM B

070CT77 070CT77 F ABR IC A TIOfJ 3OUEC76 MM W. ANS UNITS 1&2 R

S-170G AU.v i l. a. R V BUILDING FLOOR LOADING DIAGRAM

'l 070CT77 070CT77 FACRICATION 300fC7G MISC PLANS UNITS 1&2

^

V

-~s

~, x -

L

^

g o

n m

SMIGENT - LUNDY n-,,~

M N

Q DATE s a do's t P A '.I 11 t)RACIbi LIST STRUC1 URAL DEPQRTMCNT STRUCTURAL SECTION COMMONWEAtTH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4r.r3-4684 SAr'ETY ORAWING TITLE REV REV DATE STATUS SrtC.

DAff DATE ISSUED NO.

APPROvfD CLASS.

NO.

N S-170')

TURRIHF BUltDING FOUNDATION LOADING DIAGRAM C

070CT77 070CT77 FACRICA110*J 300FC76 PLAN EL. 3G9-0 UNITS t & 2 N

5-1710 TURBINF BUILDING LOADING DIAGRAM U

070CT77 070CT77 FAP.P! CATION 3OOFC76 GROUND FLOOP PLAN EL. 401-0 UNITS 1&2 N

S-1711 TURCINE BUILDING LOADING OI AGRAM P

070C177 070CT7/

FACRICA110f4 3nPCC70 MFZZAtJINE FLOOR PLAN EL. 42G-O UNITS 1 &2 N

5-1712 1URBINE BUILDING LOADirJG DIPGRAM B

070CT77 070CT77 FACRIrATION 3rntc7G MAIN FLOOR PLAN EL. 451-0 UNITS 1& 2 N

5-1713 TURBINC BUILDING LOADING DIAGRAM B

070CT77 070C177 FAURICATION 3r#E C 7G MISCELLANEOUS FLOOR PLANS UNITS 1 L2 N

S-1714 RADWASTE/ SERVICE BUILDING FLOOR LOADit4G DIAGRAM C

070CT77 070CT77 FACRfCATIOf4 3DOEC76 EL. 401-0, 417-0, 433-0 & 451-0 UNITS 1&2 R

S-1715 AUKit 1 ARY BUILDING FLOOR LOADING DIAG'?AM B

070CT77 07DC177 FABRICAT10N 22APQ77 MISC. PLANS UNITS 1 & 2

~

A+,~~

W'

.j

,n.wa w

A C Fiv_,.

wss,.a

, a a vu S-1721 AUXILIARY BUILDING CONCRETE PARTITION B

O2JUNR1 02JUN81 C0f4S T. REV.

2tMAR31 R

WAt t prTaft% tlNTTC 1 A 2 e

t,

.n rn. r n:

r r

r, oiny

--..p.

L 7.M R

.-1iJB AUXILIAh EUlluiNG LUr4CRt I LFWTIl~IO14 (790uaMNMi u.u, G r, WALL ElEV4TIONS UNITS 1& 2

, y r r-r

,y se

~,7

..be

. w w!

+=, sum N '9Ef1S ATE CLE AN-UP & TECHNICAL SUPPORT CTR BLDG O

15JUN91 15JUN31 Ill HSE Cor"t a

i SECTIONS & DF1 AILS UNITS 1 &2 S-1753 C or 4U t h...

r' A TECHNICAL SUPPORT CTR BLDG O

15JUN81 15JUf J A 1 FLOOR FRAMING UNITS 1 &2 (q_

T CTR BLOG

,o r31 IN HSE CUT.1 S-1754 CCNDENSATE CLEAN-UP o FLOOR F R AMING PL AN E L 451 -0 UNIh.% -

ROOF FRMG PLAN MISC. P

  • N j

t a

' 0 15JUfJS 1 15JUf481 IN H"J Corm

  • S-1755 CONDENSATE CLE%N-UP & TECHNICAL
  • Pk" i

w O

N tuf481 IN H5E COM*1

'I

& j M M UPPORT CTR BtDG S-17b6' CONDENSATE Ctf "

i

+

)

t SECTI t'"

gif 2

S-1757

, g AN-UP & TECHNICAL SUPPORT CTR BLDG O

15JUtl81 15Jurde

  • tMI'6 RACING SCHEDULE & DET AILS UNITS 1&2 j

e v r rr af v e n t o te m r rTp re ne.

n _ i n. 'n" a. E iuHSt I N mr r o***t

~,

Corn'F NU T r_r, r an-tip~

e n--

M 7 I

' J'J " Ci #

7

<~m

    • f f;

klWE9f Q 4 _.' P

  • t f'

T.

TOTAL ESTIMATED NO. OF DRAWINGS =

1G50 1070 NO. OF DRAWINGS STARTED

=

to 1029 O

TOTAL NO. OF APPROVED DRAWINGS

=

nm SARGEllTiLUtlDY ommnm

88 M

O DRAd!!dG LIST SVRtCTURAL DEPARTMENT DAIF OG3 ORS PAGF 75 ARCHIT CTURAL SECTION COMMONWEALTH EDISCN BYRON /CRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/468a 4G84 SAFETY DRAWING TITLE RFV REV OATE STATUS SPEC.

DATE CLASS.

' io.

DATE ISSUED t J0.

Art'POVf D py -

~

= w c

g --

gj - c.iy 9 rt g : p, g ap7 R

%D FIAL DOOR SCHEDULE SHEET 5 N

27 FLU 81 27FFCot 2 7 tti. f i:

A-29 SPECIT N ow M A'.

" "HF E T PU.

1

' M==**t7 o o LONSi9 REV 17dT h

UNITS 1 &2

~.

W" y

.g'Y'

~

~

' '%k 7mMAYPO 30MAY8t C0tJS T R REV 10Cf E

M A-90 SPECIAL DOOR A j

Iil.J

-M4ETE T A I LS SHE E1 NO.

s P

28 AH7W. '

15 At :

cha rmno gge r.pr _ ngp f t a y pon apan r r r3 Nw

_ _ _r N

A-34 RADWASTL/ SERVICE BLOG. COMPLEX GENERAL PLANS G

070CT80 070C1PO CONSTR REV 05.fuh i SHEET 1 UNITS 1 &2 N

A-35 RADWASTE/ SERVICE BLOG. COMPLEX GENERAL PLANS 0

24MAY79 24MAY79 CONSeR REV 05 DUN 78 SHEET 2 UNITS 1 & 2

. s. r

-(,

i g

n -

m

' ' ~ " '

~ ' '

..m-.

,..-, - - c i.

P

' -% INhte scHr 00te-SHt t-t-wr t UN r tv- -

$^

9nWALTE/ SERVICE BLOG. COMPLEX RDOM H

17MARSO 17t1AR80 CONSTR RT v I

S

~

NO. 2 UNITS 1 52 p

v ROOM H

2 3MW~"

~N ' EL" J 09d4-If A-38 R ADWA S ti75Dm%

Cg F INISH SCHEDULE SHE LT"imWA,

e A-39 RADW ASTE/SER/ ICE BLDG COMPLEX ROOM %

s**

075EP79 075EP79 CONS 1R frV 09 d/Jt FINISH SCHEDULE SHEFT))G M "QR PEV 09dfJ

'a m

West"fTiliULE TURR1 [.JN fl,,A-40

--MJMILLARJ, QLDG ROOM F Y N LSH V

G70F T M n7F T ag rnN; gy,*

Yo Alaa thDW A ST E/ SE R\\TICE7CDG~ Cot @E E A R

JUiILI~5PJUUTC8v usis"i RT/

UiUMG

'7 GROUND FLOOR PLAN AREA 1 UNITS 1 & 2 N

A-45 RADWAS1E/ SERVICE BLOG COMPLEX P

170CT80 170CT80 CONSTR REV 10.

'N' e 'UNO FLOOR PLAN AREA 2 UNITS 1&2 N

A-4G RtUWA51E SERVICE BUILDING COMPLEX M

290CT80 290CT80 CONSTR REV 12dAtm GROUNO FLOOR PLAN AREA 3 UNITS 1&2 N

A-47 RA0 WASTE SERVICE BUILDING COMPLEX G

27FEB81 27FEB81 CONSTR REV 13 DAN 77 CROUND FLOOR PLAN AREA 4 UNITS 1&2 N

A-48 RADWASTE/ SERVICE BLDG COMPLEX V

03 DAN 80 03dANRO CONSTR REV OGOCT7G SECOND FLOOR PLAN AREA 1 UNITS 1&2 N

A-49 RADWASIE/ SERVICE BLOG COMPLEX S

OGOCT80 000CT80 CONSTR REV 13.J AN 77 SECOND FLOOR PLAN AREA 2. UNITS 1 &2 1

A-50 RADWASTE/ SERVICE BLDG. COMPLEX FLOOR PLAN O

05MAY81 05MAY81 CONSTR PEV 27F EOR 1 EL. 410-0 AREA 4 N

A-51 RADWASTE DOCK ENCLOSURE C

030CT80 030CT80 CONSTR REV 14 MAR 80 UNITS 1&2 N

A-S2 RADWASTE/ SERVICE BLOG COMPLEX M

OGOC180 OGCCTRO CONS 1R REV OGOCT7G THIRD FLOOR PLAN AREA 1 UNITS 1&2 N

A-53 RADWASTE SERVICE COMPLEX R

OGOCT80 OGOCT80 CONSTR REV 13 DAN 77 THIRD FLOOR PLAN AREA 2 UNieS 1&2 mg N

A-54 RADWASTE SERVICE COMPLEX R

2GdUN79 26 dun 79 CONSTR REV 13.J A:< 77 THIRD FLOOR PLAN AREA 3 UNITS 1&2 m

SARGEtlT:D LUllDY I T N r*1 N FG.G.

89.

g g

g DRAWINC LIST STRUCTURAL DEPARTMFc47 DATE 063091 PAGE 7G ARCHITECTURAL SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4712/4683-4G84 SAFETY OR AWIrki TITLE REV REV DATE STATUS SPEC.

DATF CLASS.

No.

DATE ISSUED NO.

A6PRCVFD N

A-65 RA0 WASTE / SERVICE BLDG COMPLEX L

17 MAR 80 17 MAR 80 CONSTR REV 13 DAN 77 THIRD FLOOR PLAN AREA 4 UNITS 1&2 N

A-56 RADWASTE/ SERVICE BLDG COMPLEX W

170CT80 170CT30 CONSTR PEV Oo0CT76 FDJRTH FLOOR PLAN AREA 8 UNITS 1&2 N

A-57 RADWASTF/5CLVICE BLOG COMPLEX K

2GdON79 2GdUH79 CCNSTR RE V 10 DAN 77 FOURNO FLOOR PLAN ARFA ? UNITS 1&2 N

A-58 RADWA5fE/ SERVICE BLDG COMPLEX R

060CT80 OGOCT00 CONSTR REV 1? DAN 77 FOURTH FLOOR PLAN AREA 3 UNITS 1&2 N

A-59 RADWASTC/ SERVICE BLOG COMPLEX N

170CTBO 170CT80 CONSTR REV 13 DAN 77 FOURTH FLOOR PLAN AREA 4 UNITS 1&2 N

A-G1 RADWASTE/ SERVICE BLDG. COMPLEX J

2GFEB79 26FEB79 CONSTR REV 22NOV7G ROOF PLAN AREA 1 & 2 UNITS 1 &2 N

A-G2 RADWASTE/SFRVICE BLOG COMPLEX J

2GFEB79 2GFEB79 CONSTR REV 22NOV7G ROOF PLAP AREA 3 UNITS 1 &2 N

A-63 RADWASTE/ SERVICE BLDG COMPLEX d

26FEB79 2GFF079 CONSTR REV 22NOV7G ROOF PLAN AREA 4 ONITS 1&2 N

A-64 RADWASTE/ SERVICE BLOG. COMPLEX LEILING PLAN H

2GFEB79 2GFEB79 CONSTR REV 28APR77 DETAIL SHEET NO. t UNITS 1 &2 N

A-65 RADWASTE/ SERVICE BLDG COMPLEX W

27MAY80 27MAv80 CONSTR REV 28APR77 MISC. REFLECTED CEILING PLANS UNITS 1 & 2 N

A-G6 RADWASTE/ SERVICE BLOG. COMPLEX N

OGOCT80 OGOCT80 CONSTR REV 2CAPR77 2ND FLOOR REFLECTED CELLING PLANS UNITS 1 & 2 N

A-G; RADWASTE/ SERVICE BUILDING COMPLEX R

240CT79 240CT79 CONSTR REV 25tAPR77 2ND & 3RD FLOOR CEILING PLAN UNITS 1&2 N

A-G8 RADWASTE/cFRVICE BLOG COMPLEX R

300EC80 300EC80 CONSTR REV 28APR77 3RD FLOOR REFLECTED CEILING PL SHT 1 UNITS 1 & 2 N

A-69 RADWASTE/ SERVICE BtDG COMPLEX L

29 DAN 79 29 DAN 73 FOR RECORD 28APR77 3RD F LOOR REFLECTEO CEILING PLANS SH.2 UNITS 1 &2 N

A-70 RADWASTE/ SERVICE SLDG COMPLEX M

29 DAN 79 29 DAN 79 FOR RECOPD 26APR77 4TH FLOOR REFLECTFD CEILING PL SHT 1 UNITS 1&2 N

A-71 RADWASTE/ SERVICE BLDG COMPLEX H

107PR79 10APR79 CONSTR REV 20APR77 4TH FLOOR REFLECTED CELLING PLANS SH.2 UNITS 1 & 2 N

A-72 R3DWASTE/ SERV'CE BLDG COWLEX K

2GFEB79 2GFEB79 FOR RECORD 28APR77 4TH FLOOR REFLECTED CE!Lli4G PLANS SH.3 UNITS 1&2 N

A-73 RADWASTL/ SERVICE BLOG COMPLEX F

2GFEB79 2GFEB79 FOR RECORD 2GAPR77 4TH FLOOR REFLECTED CEILING PLAN UNITS 1&2 N

A-74 RADWASTE/ SERV;CE BLDG COMPLEX H

13APR79 13APR79 CONSTR REV 28APR77 CEILIMG PLAN DETAILS SHEFT NO. 2 UNITS 1 & 2 N

A-75 RADWASTE/ SERVICE BLOG COMPLEX F

26FEB79 2GFEB79 FOR RECORD 13 DAN 77 WALL SECTIONS SHEET NO.

1. UNITS 1&2 N

-76 FADWASTE/ SERVICE BLOG COMPLEX F

26FEB79 26FEB79 CONSTR REV 13 DAN 77 WALL SECTIONS SHEET NO.

.? UNITS 1&2 N

A-17 RADWASTE/ SERVICE BUILDING COMPLEX F

OGOC780 OGOCT80 CONSTR REV 13 DAN 77 WALL SECTIONS SHEET NO. 3 UNITS 1&2 N

A-78 RADWASTE/ SERVICE BLOG COMPLEX J

2OJUL79 2OJUL79 CONSTR REV 10AUG77 SECTIONS & DETAILS SHEET NO. 1 UNITS 1 &2 N

A-79 RAOWASTE/ SERVICE BLDG. COMPLEX K

3ODEC80 3OL EC80 CONSTR REV 140EC77 u)

SECTIONS & DETAILS SHEET NO. 2 UNITS 1 & 2 Q

N A-80 RADWASTE/SERWICE BLDG. COMPLEX L

3ODEC80 3ODEC80 CONSTR REV 10AUG77 SECTIONS & DETAILS SHEET NO. 3 UNITS 1&2 I

SARGENTMUNDY T NHSEm s

4 e

C

>- c e i.

t-r-

r-C c c o o C

O C

C c c Z

t-f r

m r r-t-

'I O.

t-r-

r-r-

r-5 t-t-

r-t-

r-f-

r-r-

r-t-

r-r-

e t-t-

J>

2 u

2 a O

O u

0 C

C

.3 0

t.]

J J

J C

"M "I

3 e

at E

0 3

3 w

w w

w 3

3 3

3 C

C O

w 3

3

>- C C

at 6

6 L

7 7

7 2

2 2

mi E at t.;

2 Oc n

C M

0 O

N N

N N

N N

^

O O

C

-O O

Di C

O o O

U 0

O C H

O - -

N N

N O

L.

==

1 en.

I W

C.D r

s.:

C

_5 f2 V5 i

l r

0 6-u 6

w w

Cr 6

C O > '.

CC a

t u

t.C u u u u u CC U

u w

w J

w 6

w 6

w a

,J w

a.J w

O 3

C.

O t.

Cr u

O a U t-U U

U 't i a.

u.

3 Cr CE.

C.E. u Cr M

CC Cr u w Cr r1 C

f:

w CE Cf C.C m-w

> u p-e Cg e-

>- -/ a a V

V t

B V

D 0

e p-0 V

V O

s' O

O B

y w

2 2

2 bf 2

2 2

2 2

2 2

~ ' ' 2 2

2 O

O O

O O

O O

O O

O O

O O

O O

O O

O O

O O

U w

U U

U 6

U kk.

U U

U U

U U

L U

U U

U U

U U

4 Q

[{I O

C O O - cc O m Cn ci m O C m o e O

CD o

r O

O c:

t-r-

r-t-

r-co -

cc c

r-c:

ce c'

to r-c) r-r-

r-a-

cc ww w

c c 2

O e

i U

c a a

2 2

  • u 9

J c c >

e.- 3 U

w w

w w

U r>b w

w w

3 U <

at U

U 3

6 a;

C 7

7 O

E O

7 6

6 2

<m O

6 6

m E 6

O J

C 6

7 6

O C

N t-C O

O O

r-O C3 M

o OW C

0 m

r-O C

C E.

N n

e N

O O N

O N

N O

t:

O a.e w

.o

/'

a-d O

e cc O re m C5 m

c

e O

O O e

O O

e CD m O r

r-r-

a, w cc t-r-

r-r-

r-c:

  • i c) cc t-
o ce c;

cc t-c2 r-J c:

c, T.

b-c C

c.

Cr C3 t1 U

c:

c.

-.s 2

2 Cr m

w<

U w

w w

w U

- w w

w 3

0 4

U

<C U

3 w

w e

cc uO O

6 6

m E

6 O

5'.

O 6

in 2

7 7

O E

O 7

6 6

2 C

C 0

M M

n c

O e N

5 o O O

n M

- m M

o v

O O N

O N

N O

It o O - *-

N C':

N N

i N

O O

w M

CC E

6 w

< Q "3

  • 3 w

7 I >

3 > <

J 2 I M C I 6

w li e

=

M sl$

4 O

O 2m

.J

.J

g *

,e )

OO

- >=

e2 4

4 e

>e

fi QF w w wU N

N N

O O

LI.

p a=

w I7

=0 eD e5 e6 e5 e5

=

>- O J LE

-m O

at C.

2 2

2 2

( of*

u mo O O

rs=

me

==

C 6-

> =. =.

e.r.

N N

3N en p H

t 1

e N

N 2

==

O e5 2

2 2U O

U 4

>4

'M e5 H

E 3

3 3w w w >-

'l*

O He 2

e N

N e.e e

em E-m W

M m

'o -

' > =

e n

O XTX@

C F ^

I 2

2 2

2 W

UM w w X

X X

X X

yi m m >-

3 3

3 3 ** *-

N 2

k W

.J

  • J
  • W

=W W

W WN

.a -

>=

W e-o be N

M T

3

>= >

==

.J CL O t O.J O J J

.J J

Vs

.J

==

w 2 2 2

2 2

2 I 3

3 3

3

    • ==

w 2

2 2 2 2 CL 2 CL c.

CL CL e0 L:

==

2 2

1 3

0 O

E ENE E

E 7

t =1 3

e 4

4 at 6-U >- U *- O W O at O N O N O -

4 >=

N F

v w

w w

w 3

3 W

m o > > > > > Cr > CC > 3 > CE > <t > >

Cr O

w wUwU-U U

U

..te at 0

w

.w w

+ eO cO O

O J

J

  • t at C
  • at at at < ": < < <t < at at at at w at N at M (D w CD w to w c3 w to c3 to CD (G u CO CD r-O OICIOIOmC O O>

ip

>.J at 4

m Cg Cr a 2 2 2

2

  • I 4

at

=

w

's CmOOOmOb-O-O-O-u_

Cr at U ** 2 at 3 at fr at Cr as rY. <t & *t CEJwJwOwuwu Cr w a w O

O J

a J

.J== J J

J2

.J w

w w

w

.sJ J %J

.J CO W CD 0 c3 O CD 2 EQ A CQ W (D D 4f 4

w w me i

3 C

O W 2 >* 2 >* 2 >= 2 >= CL >

  • 7, t-rh M CL F e W <t W at

.J at J

J

.J 3 >=

6-M] w w J 6 J w J t,J J w @ 5.3 *i.AJ Cr W & W @ w 2 w 2 u

2 C3 U CI U <! U 4 U f* O 2 U 2 U 2 4e4 atatatatatatetatet as 4

<t - <t 4

Cr W *a s.J== w== w w ** w =* w e

- 3 ** 3== 0.=

Cr a u I CL I c I CL I CL I G i O I O I O I T I 4 I.at 3

CN

  • * > - - > > = + - -

u ;

2 2

2 O

c O

O J

.J

>e

>-== 2

> w > w > w > >- >

U

>- O Cr O Cr O Cr O a w Cr O u - a >-

q.

O O

O c 2 0 2 0 & c Cr 0 -. c J o J O J o J 0 a.L c CL 3

U CC w

w w

wwwe we WU M

WNm WNOOOOOOOOCu 0606060wQ O

J J

J J

JCr _J G

<t JGJOJOJO E c0 E E e5 CG J C3 a c3 J C3 J C3 w CD w CD w CD w ETJ 2 CD 0 C3 O Cr w>

m e5 m oc e eD m I m W

ew

>- m f.)

N N

N NON

  • N

+NO t/"

wmw0 wow wOwOw b!

6 6

6 6

2 O

O w - w 2 w.2 w 2. w.atJ w.J w.J J 2-2*-e>-2>-2>-e0

>a J-w w

w w

U A.Z C.2 0 2 C.2 C 2 2 2. :t.2 2 2 2 2 0. 2 6 2.= 6 -

0 0 O O O O m.J. at >- at >- <t m F

=* <

0 m

0 w

2 2

2 2-at at at

.=

e

< ~ <== at== I.

sUma a

tr

== r C 3 0 3 c'. 3 :3 3 C N c3 N C3 N CD N CO 6 to 2 fD C. - Cr O Cr O Cr O tr O a N Cr N Cr N Cr N Cr O Cr ** Cr.2.*

==

3 3 > 3 > s >- 3 at 3 w 3 w 3 2 P~

-e-==

O at w at w at w at w at I at I < J iD<

a== ?

OUCUOUCHOwOwO<

J 6-

> 2

$=

>23Cr3ft3CE3u 3w 3w3w3w303<t3at i:- >- 3 >- O r U >- C >- O e E >- E >- E >- E e. U >- E P-E c

w Cr m Cr o Cr o tr O Cr 0 & m CE CL re 2 >.

e 3

I 3.

U

>s a

Cr J

C Q

<t 2 co CD cc 03 cc CD O

- O O O

-O O

O O - - - -

T O - m e o o cc e O N

m

= -

N r9 e.* co -

i e O e

30 e

s e

e a

e o

e a

e e

e e

e c.

e e

e e

e e

s 4

<t at 4

at

<t at 4

at 4

at

<t O

at 4

<r 4

<1 et 4

1. '

k M

we 2 2 2 2 2 2 2 x.- a t 2 2

Cr 2 2 2 2 2 = 2 2 2 2 2 6-at

< J

@U O.

90EE

91 M

d DATF O'.101:1 l'Am 78 DRAWING LIST STRUCTURAL OfPARIMENT ARCHITECTURAL SECTION COMMONWCALTH EDISON B)RON/BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4G83-4G84 SAFETY DRAWING TITLE REV REV DATE STATUS SPEC.

IM T E DATE ISSUED NO.

APPROVED CLASS.

NO.

N A-l15 TURBINE BtDG HEATER BAY G

13FEB70 13FFB79 CONSTR REV 10NOV76 ROOF PLAN EL. 451-0 AwEA 4 UNIT 2 N

A-116 TURBINE BLOG HEATER BAY H

13FEB79 13FEB79 CONSTR REV 27tJOV 76 ROOF PLAN AREA 2 UNIT 1 N

A-117 TURBINC BLDG HEATER BAY d

2OJUL79 2OdUL79 CON 510 REV 22NOV7G RG0F PLAN AREA 3 UNIT 2 N

A-118 TURBINE BLDG BASEMENT FLOOR PLAT. AREA 1 & 2 UNIT 1 E

2GdOL78 2GdOL78 CONStR REV 070CT75 N

A-119 TURBINE BLDG BASEMENT FLOOR PLAN AREA 3 & 4 UNIT 1 0

11dUL79 11JUL79 CONSTR REV 070CT75 N

A-120 TURBINE BLOG BASEMENT FLOOR PLAN AREA 5 UNIT 1 AA 160CT80 160CT80 CONSTR REV.

070CT75 N

A-121 TURBINE BLOG BASEMENT FLOOR PLAN AREA 6 UNIT 1 P

27FEB81 27FEBB1 CONSTR REV 070C.75 N

A-122 TURBINE BLOG BASEMENT FLOOR PLAN AREA 7 UNIT 2 R

2CNOV30 2GNOV80 CONSTR REV 070CT75 N

A-123 TURBINE BLDG BASEMENT FLOOR PLAN AREA 8 UNIT 2 M

2GdUL7R 2GdOL78 CurlSTR REV 070CT75 N

A-124 TURBINE BLOG BASEMENT FLOOR PLAN d

11JUL79 11dUL79 CONSTR REV 070CT75 AREA 96 10 UNIT 2 N

A-125 TURBINE BLDG BASEMENT FLOOR PLAN E

2GdOL78 2GdVL78 CONSTR REV 070CT75 AREA 11 & 12 UNIT 2 N

A-127 TURBINE BLOG GROUND FLOOR PLAN AREA 1 UNIT 1 T

3OduNc0 3OJUN90 CONSTR REV 26FEB76 N

A-128 TURBINE BLDG GROUND FLOOR PLAN AREA 2 Ur4IT 1 U

05SEP80 05SEP80 CONSTR REV 2GFEP7G N

A-129 TURBINE BLOG GROUND FLOOR PLAN AREA 3 UNIT 1 H

130CT78 130CT78 CONSTR REV 2GFEB76 N

A-130 TURBINE BLDG GROUNO FLOOR PLAN AREA 4 UNIT 1 D

30MAY78 30MAY78 CONSTR REV 2GFFB7G N

A-131 TURBIN3 BLDG GROUND FLOCR PLAN AREA 5 UNIT 1 T

29FEB80 29f fBBO CONSTR RLV 2GFFB76 N

A-132 TURBINE BLDG GROUND FLOOR PLAN AREA A UNIT 1 AC 27FEB81 27FEG01 CONSTE RFV 2GFEB7G N

A-133 TURBINE BLDG GROUND FLOOR PLAN AREA 7 UNIT 2 G

1100L79 11dul79 CONSIR REV 2GFEB7G N

A-134 TURBINE BLOG GROUND FLOOR PLAN AREA 8 UNIT 2 2

27FEB81 27FFB81 CONS 1R REV 2GFFB76 N

A-135 TURBINE BLOG GROUND FLOOR PLAN AREA 9 UNIT 2 G

2GAPR79 2GAPR79 COPASTR REV 26FEB7G N

A-13G TURBINE BLOG GROUND FLOOR PLAN AREA 10 UNIT 2 C

2GdUN79 2GduN79 CONSTR REV 2GFEB7G N

A-137 TURBINE BLOG GROUND FLOOR PLAN AREA 11 UNIT 2 K

3OMAY78 3OMAY78 CONSTR REV 26FEB76 N

A-138 TURBINE BLuG GROUND FLOOR PLAN 1REA 12 UNIT 2 N

11dUL79 1100L79 CONSIR REV 2GFEB7G N

A-139 TURdINE BLOG GROUND FLOOR PLAN AREA 13 UNIT 2 R

28AUG79 28AUG79 CONSTR REV 2GFLB7G N

A-140 TURBINE BLOG GROUND FLOOR PLAN AREA 14 UNIT 2 A0 OGFEB81 OGFEB81 CONSTR REV 2GFEB76 SARGENTMUNDY m ment

g 92 g'

DATE <>G3mti l' Act' I's ORAWING LIST SfRUCTURAL DEPARINENT ARCHITECTURAL SECTION COMMONWEALTH EDISON BYR0f t/BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4G83-4G84 SAFE'1 DR AW ItJG TITLE REV REV DATE STATUS SPEC.

DAir DATF ISSUID NO.

APPROVf D CLASS.

NO.

N A-141 TURBINE BLDG MEZZANINE FLOOR PLAN AREA 1 UNIT 1 G

27 dun 77 27JUN77 CONSTR REV 2OJUL76 N

A-142 TURBINE BLDG MEZZANINE FLOOR PLAN AREA 2 UNIT 1 L

OGMAY81 05MAY81 C0tJS T R Rf V 2OJUL'G N

A-143 TURBINE BLOG MEZZANINE FLOOR PLAN AREA 3 UNIT 1 d

11dVL79 11 DOL 79 CONSTR REV 20dut7G N

A-144 TURBINE BLDG MEZZANINE FLOOR PLAN AREA 4 UNIT 1 F

23 MAR 79 23 MAR 79 C0flSTR REV 2OdUL76 N

A-145 TU.JBINE BLDG MEZZANINE FLOOR PLAN AREA 5 UNIT 1 L

05FEB80 05FEB80 CONSTR REV 20dVL76 N

A-14G TURBINE BLDG MEZZANINE FLOOR PLAN AREA 6 UNIT 1 L

08SEP80 085EP80 CONSIR RE' 2OJUL7G N

A-147 TURBINE BLDG Mu;f 2ANINE FLOOR PLAN AREA 7 UNIT 2 L

29FEB80 29FEB80 Cl,fJSIR REV 20 DOL 76 N

A-148 TURBINE BLDG MEZZANINE FLOOR PLAN AREA 8 UNIT 2 G

29FEBPO 29FEB80 CONSTR REV 2OJUL76 l

N A-149 TURBINE ELDG MEZZANINE FLOOR PLAN AREA 9 UNIT 2 d

27FEH81 27FEB81 CONSTR REV 2000L76 N

A-150 TURPINE BLOG MEZZANINE FLOOR PLAN AREA 10 UNIT 2 0

04 MAR 77 04 MAR 77 CUNSIR REV 2OdVL76 N

A-151 TURBINE BLDG MEZZANINE FLOOR PLAN AREA 11 UNIT 2 E

1TdAN77 17d Af177 C0tJS I RUC T I ON 2Odul76 N

A-152 TURBINE BLDG MEZZANINE FLOOR PLAN AREA 12 UNIT 2 E

290EC77 299EC77 CONSIR REV 200UL76 N

A-153 TUMINE CLDG MEZZANINE FLOOR PLAN AREA 13 UNIT 2 L

OGFEB8. OGFEB81 rONSTR nc /

2OJUL7G N

A-154 TUPSINE BLDG MEZZANINE FLOOR PLAN AREA 14 UNIT 2 T

27FEB81 27FEB81 CONSTR REV 2OJUL7G N

A-155 TURBINE BLDG MAIN FLOCR PLAN AREA 1 UNIT 1 L

13SEP79 13SEP79 CONSTR REV 10f 40V7G N

A-15G TURBINE BLOG MAIN F.00R PLAN AREA 2 UNIT 1 L

070CT80 070CT80 CONSTR REV 10f J0V76 N

A-157 TURBINE BLDG MAIN FLOOR PLAN AREA 3 UNIT 1 d

28DEC78 28DEC78 CONSTR REV 1040V7G N

A-158 TURBINE BLDG MAIN FLOOR PLAN AREA 4 UNIT 1 0

28DEC78 280CE78 CONSTR k"V 10NOV7G N

A-159 TURBINE BLDG MAIN FLOOR PLAN AREA 5 UNIT 1 T

170CT79 170C179 CONSTR REV tr.mV76 N

A-1GO TUR'11NE BLDG MAIN FLOOR PLAN AREA G UNIT 1 J

28DEC78 28DFC/8 Cof'STR REV 10NCV7G N

A-161 Tur<tsiNE BLDG MAIN FLOOR PLAN ARE A 7 UNIT 2 S

300EC80 30DEC80 CONSTR REV IGtJOV7G s

N A-102 TURBINE BLDG MAIN FLOOR PLAN AREA 8 UNIT 2 d

160CT80 1GGaT80 CONSTR RFV, 10NOV7G

.4 A-163 TURBINE BLDG MAIN FLOOR PLAN tREA 9 UNIT 2 L

070CT80 070CTEO CONS?R REV

  • ONOV76 N

A-1G4 TURBItJE BLDG MAIN FLOOR PLAN ARIA 10 UNIT 2 G

28DEC78 28DFC78 CUNSTR. REV.

10NOV7G e

N A-165 TURBINE BLDC MAIN FLOOR PLAN AREA 11 ONIT 2 d

070CT80 070CT80 Co.*JS I R REV 10rJOV76 n

I SARGENTALUNDY MNmNFrnn

DRAWING LIST STRUCTURAL DEPAR1Wto DATE OG"1031 PAGE 20 ARCHI ECTURAL SECTION COMMONWEALIH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PRNICT NOS 4391-4392/4G83-4G84 SAFETY ORAviNG

'1TLE REV R7V DATE STATUS SPEC.

D M t.

DA1E ISSUED NO.

APP 6?O vl D CLASS.

No.

N A-1GG TURBINE BLDG MAIN (LOOR PLAN AREA 12 UNIT 2 G

28DEC78 28DEC78 CCtJS T R. REV.

1CNOi7G N

A-167 TURBINE BLOG MAIN FLOOR PLAN AREA 13 UNIT 2 K

11JUL79 11JUL79 CONSTR REV 10NOV7G N

A-1G8 TURRINE BLOG MtIN FLOOR PLAN AREA 14 UNIT 2 L

17MARSO 17 MAR 80 CON'sTR REV 10NOV76 TUcritJE BLOG ROOF PLAN AREA 1 UNIT 1 H

275EP77 275EP77 CONSTR REV 2 7tlOV7 G N

A-169 e

N A-170 TURBINE BLDG ROOF PLAN AREA 2 UNIT 1 J

24 DAN 79 24 DAN 79 CONSTR REV 20t:Ov76 N

A-171 TURBINE BLOG ROOF PLAN AREA 3 UNIT 1 H

15 DON 77 15JUN77 CONSTRUCTION 22NOV7G N

A'172 TURBINE 6:fG ROOF PLAN AREA 4 UNIT 1 G

15JuiJ77 15JUN/7 COf 4S T RUC T IOfJ 2240VIG N

A-173 TURBINF t'LCC. ROOF PL AN ARE A 5 UNIT 1 J

24JAN79 24 DAN 79 CONSTR REV 27tJOV7G N

A-174 TURBINE BLDG ROOF PLAN AREA G UNIT 1 H

275EP77 275EP77 CONSTR REV 27tJOV7G N

A-175 TURBINE BLDG ROOF PLAN AREA 7 UNIT 2 L

05SEP80 05SEP80 CONSTR REV 22NOV7G H

15JUN77 15JUN77 CONS 1RUCTION 2?NOV76 N

A-176 TURBINE BLDG ROOF PLAN AREA 8 UNIT 2 N

A-177 TURBINE BLDG ROOF PLAN AREA 9 UNIT 2 H

150UN77 15JUN77 CONS 1RUCTION 22NOV76 fl A-178 TURBINE BLDG ROCF PLAN AREA 10 UNIT 2 G

15JUN77 15JUtl77 CONSTRUCTIOtl 22NOV76 N

A-179 TURCINE BLDG RODF PLAN AREA 11 UNIT 2 G

05MAY77 15 jut 477 CONSTRUCTION 2?Nov7G N

A-180 TURBINE BLDG ROOF PLAN AREA 12 UNIT 2 J

24 DAN 79 24JAN79 CONSTR REV 22NOV76 N

A-131 TURBINE BLDG ROOF PLAN AREA 13 UNIT 2 G

15JUN77 15JUN77 CONSTRUCTIDH 22NOV7G

1 A-182 TURBINI BLDG ROOF PLAN AREA 14 UNIT 2 G

15JUN77 15JUN77 CONSTRUCTION 2?tJOV7G N

A-183 TURBINE BLDG. MISC. FLOOR PLANS SHEET NO.1 N

29FEB80 29FEB80 CONSTR REV 27 DAN 77 UNITS 1&2 N

A-184 TURBINE BLDG MISC FLCOR PLANS C

2GJUN79 2GJUN79 CONSTR REV 10SEP7G SHEET NO 2 UNITS 1&2

~

$ y w r y g w "y. f av

~

'T n a' l'

2 3, m7; r n ~- n ny,m,.m. qs? '" o "n.; e

- e,m.a, w.a. ;

a

+ -

....m.

. v

~_

i-(i p

- C / l W' -

"I t ~ ;! T '

I i

irb I

N A-189 TURBINE ROOM MISCELLANEOUS ROOF PLAN f

I IUIJL d J l i s)U 6 sJ w3 i a l iM :

M W **M EL. 468-2 UNITS 1&2 m

Q N

A-190 TURBINE BLOG WALL SECTIONS SHEET NO 1 UNITS 1 &2 F

1GOCT80 160CT80 CONSTR REV.

21DEC76 m

k SARGEtiT31.Uf!DY if%nlNFFn9

e-94 b

O DRAWING LIST STRUCTURAL DEPARIMit!i DATE OW1001 P AC.f 81 ARCHITECTURAL SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOD UtJITS 1 & 2 PROJECT NOS 4091 -4302/.1G91-4G84 SAFETY DRAWING TITLE REV REV DATE STATUS SPf C.

DATF CLASS.

NO.

DATE ISSUED fxi APPROVED N

A-191 TURBINE BLDG WALL SECTIONS SHEET NO 2 UNITS 1 &2 E

1GOCT80 160Cf80 CON",TP REV.

21DFC76 N

A-19" HEATER BAY SECTION UNIT 1 E

1 GOC 180 160CT80 CONSTR RE V.

17 d atJ 77 N

A-193 TURBll'E BLDG SECTIONS & DETAILS L

070C180 070CT80 CONSTR RFV 22 rJO V 7 G SHEEl NO 1 UNITS 1 & 2 N

A-194 104BINE BLDG SECTIONS & DETAILS K

OSSEP80 05SEPBO CONSTP REV 18FEB77 SHEET NO 2 UNITS 1 & 2 J

-_=

,,,...,cr

,c..

r,..r.,

re,

,.,3 r 17 DOL 80 17dUtSO CorntR REV L ~.-

y';

'N d

Q.t1 Q I.DG SECTIONS & DETAILS 4

.. d

-_ME 7

'f f

A-107 i(PICAL TTAM 1

r or m -

- - --ST R ELV 22No 6j A-198 TYPICAL ME T AL S I D I NG DE T A I LSE.J N'i u

'%- Q L77 07 DOL 77 CONSTRUCTION 22t10' M

UNITS 1& 2 f,

, p A-199 "T1IT S

E 17 d M

.,f

, J l +Y I ?.s 2

~

~hl

~

- a _y,

,;rrg,ie cnote,1p_ rr o 3.

,7 g

, ergrynn. mqcynn_ _,-

J, rimr+

m 4

n N

A-201 T URB I tJE UUILDING D

2 3 M A R 7 C.,

23 MAR 79 CONSlR REV 1 mew 71 SFCTIOrn & DETAILS UNITS 1 &2 N

A-202 TURBINE BUILDING H

OGFEBH1 OGrEC81 CONJ 1R REV 2' MAR 7 7 LECTIONS & DETAILS UNITS 1&2 N

A-203 TURRINE FOUNDATION PLAN SECTIONS & DETAILS C

2GAPR79 2GAPR79 CONSTR REV 2rhiUN7 7 UNITS 1 & 2 R

A-205 AUXILIARY BLDG PUMP FLOOR H

31 DAN 80 31dAH80 CONSTR REV 070CT75 PLAN AREA 2 & 3 UNITS 1 &2 R

A-2OG AUXILIARY BLOG PUMP FLOOR M

31 DAN 80 31dAf180 CONSTR REV 15AUG75 PLAN AREA 6 UNITS 1 &2 R

A-207 AUXILIARY BtDG BASEMENT W

2GtJOV80 2GNOV30 CONr.TR REV 10r J'1V 7 5 FLOOR PLAN AREA 2 UNIT 1 R

A-208 AUXILIARY BLDG BASEMENT Y

2GNOV80 2GtJOV80 CONSTR REV 10tJO V 75 FLOOR PLAN AREA 3 UNIT 2 R

A-209 AUXILIARY BLDG BASEMENT M

OGFEB81 OGFEB81 CONSTR REV IOf40V75 FLOOR' PLAN AREA 5 UNIT 1 R

A-2tO AUXILIARY BLDG BASEMENT Z

30DEC80 300EC80 CONSTR REV 070C175 FLOOR PLAN AREA G UNITS 1 & 2 R

A-211 AUXILIARV BLDG BASEMENT M

12APR79 12APR79 CONSIR REV 10NOV15 FLOOR PLAN AREA 7 UNIT 2 R

A-212 AlfXILI ARY BLDG BASEMENT K

O2AUG79 O2AUG79 CONSTR REV 10tJOV75 FLOOR PLAN AREA 5 & 7 UNITS 1 &2 R

A-213 AUXILIARY BUILDING VALVE OPERATING FLOOR PLAN E

11r[B80 11 REC 80 CONSTR REV 10r0B76 EL. 354-6 APEA 6 UNITS 1 & 2 N

A-217 AUXILIARY BLOG PIPE TUNNEL FLOOR PLAN B

10 REB 70 10 REB 78 CONSTR REV 070C17's EL. 357-0 & 367-0 AREA 4 UNIT 2 N

A-218 AUXILIARY BLDG PIPE TUNNEL H

30DEC80 3ODEC80 CONSTR REV 070CTTC TLOOR PLAN EL. 367-0 & 377-0 AREA 1 UNIT 1 u>

Q R

A-219 AUXILIARY BLDG UPPER BASEMENT N

08MAY81 08MAY81 CONSTR REV 101EB76 FLOOR PLAN EL.364-0 AREA 2 UNIT 1 m

S/WGENTALUNDY

{

ipNGINEFM.

95 M

C DRAi!!NG LIST STRUCTURJ.L DEPARTMENT DAir tv.3091 6'Ata n.'

ARCHITECTURAt. SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4GG3-4084 SAFETY DRAWING TITLE REV REV DATE STATUS SPlc DA1E DATE ISSUED NO.

AP6' ROVED CLASS.

No.

R A-220 AUXILIARv BLDG UPPER BASEMENT T

18NOV80 18NOV80 CorJST R RFV t or E irit; FLOCR PLAN EL 364-0 AREA 3 UNIT 2 N

A-221 AtiXILIARY BLOG PIPE 1UNNEL G

3ODECRO 30DECRO CONSTR RFV 070CT75 FLOOR PLAN EL.3G7-0 F. EL.377-0 AREA 4 UNIT 2 R

A-220 AUXILIARY BLOG UPPER BASEMENT M

OGFEC81 OGFEC81 CONSTR REV 10FEC7G FLOOR PLAN EL. 3G4-0 AREA 5 UNIT 1 R

A-223 AUXILIARY BLDG UPPER BASEMENT Y

OGFEB81 OGFEC81 CONSTR REV 10FEC7G FLOOR PLAN El 364-0 AREA G UNITS 1& 2 R

A-224 AUXILIARY BLDG UPPER BASEMENT N

OGFEB81 OGFEC81 CONSIR REV 10FFB76 FLOOR PLAN EL. 364-O AREA 7 UNIT 2 R

A-225 AUXILIARY BLUG UPPER BASEMENT M

26NOV80 20NOV80 CONSTR REV 10FEC76 FLOOR PLAN EL 364-0 AREA 5& 7 UNITS 1&2 R

A-226 AU(ILIARY OLOG PIPE TUNNEL K

OGFEB81 OGFEB8f CONSTR REV 10FEB7G FLOOR PLAN EL. 358-2, 374-6 & 376-0 UNITS 1&2 N

A-227 AUXILIARY BLOG PIPE TUNNEL C

10FEB78 10FEB78 CONSTR REV 070CT75 FLOOR PLAN EL. 379-6 AREA 5 & 7 UNITS 1&2 R

A-228 AUXILIARY BLOG UPPER BASEMENT N

12 MAR 80 12 MAR 80 CONSTR REJ 070CT75 FLOOR PLAN EL.383-0 AREA 1 UNIT 1 R

A-229 AUXILIARY BLOG UPPER BASEMENT AA 25 MAR 81 25 MAR 81 CON",TR REV 154UN76 FLOOR PLAN EL 383-0 AREA 2 UNIT 1 R

  • A-230 AUXILIARY BLDG UPPER BASEMENT AD O2 DUN 81 02 DUN 81 CONSTR REV 15 dun 7G FLOOR PLAN EL 383-0 AREA 3 UNIT 2 R

A-231 AUXILIARY BLOG UPPER BASEMENT d

02MAYBO O2MAY80 CONG1R PEV 070CT75 FLOOR PLAN EL. 383-0 AREA 4 UNIT 2 R

A-232 AUXILIARY BLOG UPPER BASEMENT S

27FEB81 27FEB81 CONSTR REV 15 DUN 76 FLOOR PLAN EL 383-0 AREA G UNITS 1&2 R

A-233 AUXILIARY BLDG FLOOR PLAN N

30DFC80 3ODEC80 CONSTR REV 30AUG7G El. 391-6 AREA 9 UNIT 1 R + A-234 AUXILIARY Bt Di. p!'1C F LOOR PLAN S

O2 DON 81 02 DUN 91 CONSIR REV 161UN7G EL. 375-6. n% G, 394-0, 394-6 UNITS 1 &2 R

A-237 AUXILIARY BsCG GROUND T

OGFEB81 OGFEB81 CONSTR REV 05AUG7G FLOOR PLAN AREA 1 UNIT 1 R

A-233 AUXILIARY BLOG GROUND AA OGFEB81 06FEB81 CONSTR REV 05AUG76 FLOOR PLAN AREA 2 UNIT 1 R

A-239 AUXILIARY BLOG GROUND T

18NOV80 18NOV80 CONSTR REV 05AUG7G FLOOR PLAN AREA 3 UNIT 2 R

A-240 AUXILIARY BLOG GROUND R

170CT80 170CT80 CONS 1R REV 05AUG76 FLOOR PLAN AREA 4 UNIT 2 R

A-241 AUXILIARY Bl.DG GROUNO M

OGrEC81 OGFEC81 CONSTR REV 05AUG7G FLOOR PLAN AREA 5 UNIT 1 R

A-242 AUXILIARY BLDG GROUND P

08MAY81 08 HAY 81 t'ONSTR REV OSAUG76 FLOOR PLAN AREA 6 UNITS 1 &2 R

A-243 AUXILIARY BLOG GROUND L

18NOV80 18NOVCO CONSIR REV O'it.UG 7 G FLOOR PLAN AREA 7 UNIT 2 N

A-244 AUXILIARY BLCG GROUND E

26HOV80 2GNOV80 CONSTR REV O N Y79 FLOOR PLAN AREA 5&7 SHEET 1 UNITS 1 &2 N

A-245 AUXILIARY BLDG GROUND D

170CT79 170CT79 CONSTR REV 7 3dUf J7 8 FLOOR PLAN AREA 5&7 SHEET 2 UNITS 1&2 o

O R

A-246 AUKILIARY BLDG D

25 MAR 81 25 MAR 81 CONSTR REV 17dul78 S

FLOOR PLAN EL 409-6 AREA 6 UNITS 1&2 SARGENTII. UNDY i r FIf IF 'f E P'

i 96 M

Q O k A *:I NG '. ! S T STRUCTURAL DEPARTMENT DATE 063091 PAGE n3 ARCHITECTURAL SECTION COMMONWEALTH EDISOfJ BYRON /BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4312/4GR3-4G84 SAFETY OR A W i tJG TITLE REV REV DATE STATUS SPEC.

DATE CLASS.

NO.

DATE ISSUED NO.

APPROVED R

A-247 AUXILIARY BLOG TUNNEL K

18NOV80 18HOV80 CONSTR REV 03DEC7G FLOOR EL.415-O AREA 1 & 4 UNITS 1&2 R

A-248 AUXILIARY BLOG.

R 08MAY81 08MAV81 CONSTR RFV O2DEC76 FLOOR PLAN EL.414-0 ARCA 5 UNIT 1 R

A-249 AUXILIARY ULDG.

P OGFEB81 OGFEBR1 CONSTR RTV OJOEC76 FLOOR PLAN EL.414-0 AREA 7 UNIT 2 N

A-250 AUXILIARY BLDG E

290CT80 290CT80 CorJS I R REV 01DEC76 FLOOR PLAN EL 414-0 & 415-0 AREA 5 & 7 UNITS 1 &2 R

A-251 AUX BLDG. FLOOR PLAN EL.414-0 5

OGFEB81 OGFEB81 CONSTR REV 03DEC78 AREA 3 UNIT 2 R

A-252 AUXILIARY BLOG MEZZAf41NE K

08MAV81 08 MAYO 1 CONSTR REV 27 DAN 77 FLOOR PL AfJ ARE A 1 UNIT 1 R

A-253 AUXILIARY GLDG MEZZANINE AC OGFEB81 OGFEBut CONSTR REV 27dAtJ77 FLOOR PLAN AREA 2 UNIT 1 R

A-254 AUXILIARY BLDG MEZZANINE AD OSMAYH1 ORMAYG1 CONSTR REV 2 7d AtJ7 7 FLOOR PLAN AREA 3 UNIT 2 R

A-255 AUXILIARY BLDG MEZZANINE P

27 DUN 80 27JUtJ80 00tJST R REV 27 DAN 77 FLOOR PLAN AREA 4 UNIT 2 R

A-25G AUXILIARY BLOG MEZZANINE N

ORMAY81 08MAY81 CONSTR REV 2 7dAf J7 7 FLOOR PLAN AREA 5 UNIT 1 R

A-257 AUXILIARY BLDG MEZZANINE Y

170CT80 170CT80 CONSTR REV 27dAf177 FLLOR PLAN AREA 6 UNITS 132 R

A-258 AUXILIARY BLOG MEZZANINE K

04SEP80 04SEP80 CONSTR REV 27lAN77 FLOOR PLAN AREA 7 UNIT 2 R

A-259 AUXILIARY BLOG MEZZANINE F

09dUL79 09dul79 CONSTR REV 27 DAN 77 FLOOR PLAN AREA 5 & 7 UNITS 1 f 2 R

A-260 AUX. BLOG. FLOOR PLAN T

08MAY81 08MAY81 C0fJS1R REV O'NOV77 EL.439-0 AREA 6 UNITS 1 &2 R

A-261 AUXILIARY BLOG CABLE ROOM S

04NOV80 04NOVRO CONSTR RFV 11 MAR 77 FLOOR PLAN AREA 1 UNIT 1 R

A-262 AUXILIARY BLDG CABLE ROOM W

08MAY81 08MAY81 CONSTR REV 11 MAR 77 FLOOR PLAN AREA 2 UNIT 1 R

A-2G'I AUXILIARY BLOG CABLE ROOM Y

04NOV80 04NOV80 CONSTR REV 05APR77 FLOOR PLAfJ ARE A 3 UNIT 2 R

A-2G4 AUXILIARY BLDG CABLE ROOM L

04SEP80 04SEP80 CONSIR REV 05APR77 FLOOR PLAN AREA 4 UNIT 2 R

A-2G6 AUXILIARY BLDG MAIN FLOOR P

300EC80 3ODEC80 CONSTR REV 24 MAR 78 PLAN AREA 1 UNIT 1 R

A-2G7 AUXILIARY BLOG MAIN FLOOR AC 08MAY81 08MAY81 C0flS1R REV 28ArR77 PLAN AREA 2 UNIT 1 R

A-2G8 AUXILIARY BLDG MAIN FLOOR AA 27FEB81 27FEB81 CONSTR REV 28APR77 PLAN EL. 451-0 AREA 3 U' LIT 2 R

A-269 AUXILIARY GLDG MAIN FLOC 2 P

3000C00 3ODEC80 CONSTR REV 24 MAR 78 PLAN AREA 4 UNIT 2 R

A-270 AUX BLDG MAIN FLOOR PLAN EL.451-0 M

11FEB80 11FEB80 CONSTR REV 28APR77 AREA 5 UNIT 1 R

A-271 AUXILIARY CLDG MAIN FLOOR V

27FEB81 27FEB01 CONSTR REV 18FEH77 PLAN AREA S UNITS 1&2 m

Q R

A-272 AUXILIARY BLOG MAIN FLOUR H

22MAY80 22MAY80 CONSTR REV 27APR17 m

PLAN EL.451-0 UNIT 2 SMGErlTMUNDY

_... _ _, n wn,-

v C7 2

g e

j a

e o

IIRAWING LIST S1RUCTURAL DEPARIMLNT D A T L s m3:ut t PAta ni ARCHITECTURAL SECTION COMMONWEALTH EDISON BfRON/BRAIDWOOD UNITS 1 & 2 PROJECT NOS 4391-4392/4683-4684 SAFETY DRAWING TITLE REV REV DATE STATUS SPFC.

DATE DATE ISSUED NO.

APPROVED CLASS.

NO.

N A-273 AUXILIARY BLDG ROOF PLAN H

31JAN79 31JAN79 CONSTRUCTION 28APR77 EL. 451-0 AREA 5 & 7 UNITS 1 & 2 R

A-274 AUXILIARY BLOG VENTILATING ROOM H

3ODCC80 3ODECSO CONSTR REV 07JUL77 FLOOR PLAN EL. 459-0 AREA 5 UNIT 1 R

A-275 AUXILIARY BLDG VENTILATING ROOM S

08MAV81 OSMAYB1 CONS 1R REV 18FfB77 FLOOR PLAN EL 459-2 AREA G UNITS 1&2 R'

A-276 AUXILIARY BLDG VENIILATING ROOM J

3ODEC80 GODEC80 CONSTR REV 07JUL77 FLOOR PLAN EL. 459-0 AREA 7 UNIT 2 R

A-277 AUXILIARY BLDG VENTILATING ROOM K

27JUN80 27JUN80 CONSTR REV 07JUL77 FLOOR PLAN EL.467-0 AREA 5 UNIT 1 R

A-278 AUXILIARY BLOG VENTILATING ROOM N

05SEP80 05SEP80 CONSTR REV 18FEC77 FLO9R PLAN EL 467-4 AREA 6 UNITS 1 & 2 R

A-279 AUXILIARY BLDG VENTILATING ROOM J

11FEB80 11FEBSO CONSTR REV 07JUL77 FLOOR PLAN EL,.467-0 AREA 7 UNIT 2 R

A-280 AUXILIARY BLDG VENTILATING ROOM M

05SEP80 05SEP30 CONSTR REV 18FEB77 FLOOR PLAN El 475-6 AREA G UNITS 1&2 R

A-281 PARTIAL AUXILIARY BLOG ROOF PLAN M

25APR79 25APR79 CONSTR REV 17 DAN 77 L.P.EL.477-0 AREA 1 UNIT 1 R

A-282 AUXILIARY BLOG ROOF PLAN (L.P.)

V 08MAY81 08MSY81 CONSTR REV 17 DAN 77 EL.477-0 AREA 2 UNIT 1 R

A-283 AUXILIARY BLDG ROOF PLAN S

18HOV80 18NOV80 CONSTR REV 17 DAN 77 EL.477-0 AREA 3 UNIT 2 R

A-284 PARTIA5 AUXILIARY BLOG ROOF PLAN J

25APR79 25APR79 CONSTR REV 17JAN77 EL.477-0 AREA 4 UNIT 2 N

A-285 AUXILIARY BLOG ROOF PLAN E

09 DAN 79 09JAN79 CONSTR REV ObMAV77 EL.477-0 AREA 5 UNIT 1 N

A-280 AUXILIARY BLDG ROOF PLAN F

170CT80 170CTRO CONSTR REV 2GMAY77 EL.477-0 AREA 7 UNIT 2 N

A-287 AUXILIARY BLDG ROOF PLAN F

23 DAN 79 23 DAN 79 CONSTR REV 07JAN77 EL 485-0 AREA 2 8 3 UNITS 182 N

A-288 AUXILIARY BLDG ROOF PLAN D

11FEB80 11FEC80 CONSTR REV 14JUL77 EL 485-0 AREA 6 UNITS 1 &2 N

A-289 AUXILIARY BLOG SAFETY VALVE PENTHOUSE H

23 DAN 79 23JAN79 CONSTRUCTION 17JAN77 ROOF PLANS & ELEVATIONS UNITS 1&2 N

A-290 AUXILIARY BLDG ROOF PLAN F

04MAY79 04MAY79 CONSTR REV

  • 'JAN77 EL.490-0 & 500-0 AREA 1 UNIT 1 N

A-291 AUXILIARY CLDG ROOF PLAN G

04MAY79 04MAY79 CONSTR REV 17JAN77 EL.490-0 & 500-0 AREA 4 UNIT 2 R

A-292 AUXILIAR( BLDG REFLECTED N

04NOV80 04NOV80 CONSTR REV 28APR77 CEILING PLAN SHEET 1 UNIT 1 R

A-293 AUXILIARY BLDG REFLECTED

[

27FEB81 ?tFEB81 LONSTR REV 28APR77 CEILING PLAN SHEET 2 UNIT 2 R

A-294 AUXILIARY BLDG R

2SNOV80 2GNOV80 CONS 1R REV 2ft APR77 CEILING PLAN SHEET 3 UNITS 1 & 2 R

A-295 AUXILIARY BLDG SECTIONS L

170CT80 170CT80 CONSTR REV 05JUN78

& DETAILS SHEET 1 UNIT 1 0

A-296 AUXILIARY BLDG SECTIONS J

O2SEP80 02SEPBO CONSTR REV 05JUN78

& DETAILS SHEET 2 UNIT 1 mg R.

A-297 AUXILIARY BLDG SECTIONS J

O2SEP80 02SEP80 CONSTR REV 05JUN78

& DETAILS SHEET 3 UNIT 1 t9 SMiGENTaLUNDY m, _ m.

h h

d an a

U o

o ORAWING LIST STRUCTURAL DEPAR1 MINT DAT1 (d 3091 l' A r.t E

ARClil T EC TUR A L SECTION COMMONWEALTH EDISON BYRON /BRAIDWOOU UNITS 1 & 2 PROJECT NOS 4391-4392/4683 4G84 SAFETY DRAWING TITLE REV REV DATE STATUS SPEC.

DATE CLASS.

No.

DATE ISSUED f 40.

APPROVFD R

A-298 AUXILIARY BLOG SECTIONS K

080CT79 080CT79 CONSTR REV 05JUN78

& DETAILS SHEET 4 UNIT 1 R

A-2 V AUKILIARY BLDG SEC110NS H

OGFEB81 OGFEB81 CONS 1R REV 31AUG77

& DETAILS SHEET 5 UNITS 1 & 2 R

A-3OO AUXILIARY BLOG SFCTIONS L

27FEC81 27FEB01 CorJSI R REV 31AUG77

& DETAILS SHEET G UNITS 1 &2 R

A-301 AUXILIARY BLOG SECT.9NS M

27FER81 27FEB81 CONS 1R REV 31AUG77

& DETAILS SHEET 7 UNITS 1 &2 N

A-302 AUXILIARY BLDG SECTIONS G

04MAY79 04MAY79 CONSTR REV 10FEB77

& DETAILS SHEET 8 UNITS 1 & 2 P

A-303 TYPICAL SHIELDING WALL E

OGFEB81 06FEB81 CONSTR REV O2FEB78 DETAILS UrJITS 1&2 R

A-304 AUXILIARV BLOG SECTIONS F

2OMAY80 20MAY80 CONSTR REV OSUCT7G

& DETAILS SHEET 10 UNITS 1 & 2 N

A-305 AUXILIARY BUILDING SECTIONS & DETAILS F

27FEB81 27FEB81 CONSTR REV 17 DAN 77 SHEET 11 UNITS 1 &2 R

A 30G AUAILI"oY BUILDING SECTION3 & DETAILS P

15 DAN 81 15 DAN 81 CONSTR REV 01NOV77 SHEE1 12 UNITS 1 &2 R

A-307 AUXILIARY BUILDING SECTIONS & DETAILS J

OGFEC81 OGF E B81 CONSTR REV 07 DUN 78 SHEET 13 UNITS 1 & 2 N

A-308 AUXILIARY BLDG SECTIONS & DETAILS SHEET 14 F

11FEB80 11FEB80 CONSTP REV 11 DAN 77 UtJI T S 1 & 2 R

A-309 TYPICAL TOP OF MASGNRY WALL F

27FEC81 27FEC81 COtJSTR REV 14NOV77 OFTAILS UNITS 1 &2 N

A-310 AUXILIAGY BUILDING ROOF PLAN EL.485-0 AREA 5 & 7 8

31 DAN 79 31 DAN 79 CONSTR RFV 23JUN77 UNITS 1 &2 P

A-311 FUEL HANDLING BLDG GROUND D

23 MAR 79 23 MAR 79 COf JS T R REV 070CT75 FLOOR PLAN AREA 1 UNITS 1 & 2 R

A-312 FUEL 11ANDLING BLDG GROUND T

27FEC81 27FEB81 CONSTR REV 26FEB7G FLOOR PLAN AREA 2 UNITS 1&2 5-A-313 FUEL HANDLING BLDG TRAIN SHED L

14NOV79 14NOV79 CONSTR REV 2GFEC7G FLOOR & ROOF PLANS UNIT 1 &2 N

A-314 FUEL HANDLING BLDG OPERATING H

28APR80 28APR80 CONSTR REV 31AUG76 FLOOR PLAN AREA 1 UNITS 1&2 N

A-315 FUEL HANOLING BLDG OPERATING F

29FER80 29FEURO CONSTR REV 31AUG76 FLOOR PLAN AREA 2 UNITS 1 &2 N

A-31G FUEL HANDLING BLDG ROOF E

23JAN79 T3JAN79 COH? r' V T I OtJ O'1F E G77 PLAN AREA 1 UNITS

&2 N

A-317 FUEL HANDLING BLDG ROOF C

23 DUN 77 ?JJUN77 CONSTRUCTION 09FFB77 PLAN H.P.

EL. 474-6 AREA 2 UNITS 1&2 R

A-318 AUXILIARY BLDG FLOOR PLAN EL. 463-5 N

02MAY80 L?MAY80 CONSTR REV 20MAV77 AREA 2 UNIT 1 R

A-319 AUXILIARY BLOG FLOOR PLAN EL. 463-5 I

18NOV80 18NOV80 CON'?R RFV 20MAY77 AREA 3 UNIT 2 R

4-320 AUX BLDG SECTIONS & DETAILS M

08MAY81 08MAY81 C0f JST R REV 13 MAR 73 SHEET 16 UNITS 1&2 R

A-321 TYPICAL MASONRY DETAILS FOR INTERIOR SAFETY A

150AN81 15 DAN 81 CONSTRUCTION 15 DAN 81 RELATED WALLS UNITS 1&2 e

- MC lLi' ? TfD {*QF SARGENTAlutlDY k

.J F N OINr F rin

,,