Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000423/LER-1989-032, :on 891203,both Channels of Source Range Hi Flux at Shutdown Alarm Found Blocked.Caused by Personnel Error.Channel Unblocked,Dilution Accident Verified Not in Progress & Operator Involved Counseled + (ML20005E272)
- LD-89-138, Application for Amend to License SNM-1067,authorizing Listed Organizational Changes.Fee Paid + (ML20005E273)
- 05000373/LER-1989-028, :on 891204,RHR Shutdown Cooling Suction Header Outboard Isolation Valve Automatically Isolated.Caused by Miscommunication Between Technician & Station Operator.Task Force Developed to Review Event + (ML20005E274)
- ML20005E275 + (ML20005E275)
- ML20005E277 + (ML20005E277)
- ML20005E280 + (ML20005E280)
- ML20005E282 + (ML20005E282)
- ML20005E283 + (ML20005E283)
- ML20005E285 + (ML20005E285)
- ML20005E286 + (ML20005E286)
- ML20005E288 + (ML20005E288)
- ML20005E289 + (ML20005E289)
- ML20005E291 + (ML20005E291)
- ML20005E293 + (ML20005E293)
- ML20005E294 + (ML20005E294)
- ML20005E296 + (ML20005E296)
- AECM-89-0229, Advises That Annual Emergency Preparedness Exercise for Facility Scheduled for Wk of 900827.States of Ms & La & Local Agency Participation Will Be Limited + (ML20005E298)
- ML20005E299 + (ML20005E299)
- ML20005E301 + (ML20005E301)
- ML20005E302 + (ML20005E302)
- ML20005E303 + (ML20005E303)
- ML20005E304 + (ML20005E304)
- ML20005E307 + (ML20005E307)
- PNO-II-89-082, on 891222,alert Declared Due to Loss of Audible Annunciators.Electrical Jumper,Required for Mods in Progress,Installed + (ML20005E310)
- ML20005E311 + (ML20005E311)
- ML20005E314 + (ML20005E314)
- ML20005E315 + (ML20005E315)
- ML20005E317 + (ML20005E317)
- ML20005E318 + (ML20005E318)
- BVY-89-117, Responds to Violations Noted in Insp Rept 50-271/89-17 on 890906-1016.Corrective Actions:Plant Procedures Revised & Addl Meetings Between Plant Manager,Dept Supervisors & Personnel to Take Place + (ML20005E319)
- ML20005E320 + (ML20005E320)
- ML20005E322 + (ML20005E322)
- ML20005E324 + (ML20005E324)
- ML20005E325 + (ML20005E325)
- ML20005E326 + (ML20005E326)
- ML20005E327 + (ML20005E327)
- ML20005E328 + (ML20005E328)
- 05000353/LER-1989-014-02, :on 891202,unexpected Actuation of Primary Containment & Reactor Vessel Isolation Control Sys Occurred. Caused by Insufficient Guidance in General Plant Procedure. Appropriate Procedures Reviewed & Revised + (ML20005E330)
- ML20005E331 + (ML20005E331)
- ML20005E332 + (ML20005E332)
- 05000298/LER-1989-026, :on 891125,reactor Scram Occurred Due to Closure of Outboard Msivs.Caused by post-filter Media Ignition by Hot Air or Particles from Dryer.Air Dryer B Disassembled & Inspected + (ML20005E333)
- ML20005E336 + (ML20005E336)
- ML20005E337 + (ML20005E337)
- ML20005E338 + (ML20005E338)
- ML20005E341 + (ML20005E341)
- ML20005E343 + (ML20005E343)
- LIC-89-1196, Forwards Evaluation of Fort Calhoun Nuclear Station Radiation Protection Enhancement Program. Evaluation Assesses General Attitude of Radiation Protection Dept & Determines Effectiveness of Program + (ML20005E344)
- ML20005E345 + (ML20005E345)
- 05000325/LER-1989-024, :on 891127,17 Primary Containment Isolation Valves Not Tested Per Tech Spec Surveillance Requirement 4.6.1.1.a.Caused by Failure to Recognize Applicability of Testing.Test Rev Completed + (ML20005E346)
- ML20005E348 + (ML20005E348)
- ML20005E349 + (ML20005E349)