Text
^
m s ;;
r
- '. Docket'Nos.-50-325 December 29,:1989 and 50-324
/
LICENSEE:
Carolina Power and Light Company FACILITY:
Brunswick Steam Electric Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF DECEMBER 20, 1989 TECHNICAL MEETING WITH CAROLINA POWER AND LIGHT C0t1PANY General NRC staff met with C6rulina Power & Light Company ((CP&L)
- On December 20, 1989, representatives.to discuss the Technical Specifications Interpretations TSI) that'are being utilized at the Brunswick Steam Electric Plant, Units 1 and 2 l
(Brunswick). The meeting was held in Rockville, Maryland; a list of attendees 1
.is included in Enclosure 1. contains the meeting agenda.
Discu ssion -
)
CF&L writes a TSI at Brunswick when the existing Technical Specifications-l (1) are r.ot consistent with the physical or intended design of the plant; (2) do not adequately demonstrate operability or are not sufficiently conservative;
.(3) contain typographical or administrative errars that represent operability 1
or_ surveillance concerns; or-(4) are otherwise uetermined as necessary by the 1
Plant: Nuclear Safety Committee.
The TSI becomes a conpanion document to the e
Technical Specifications.
The TSI is usually cancelled once the associated i
Technical Specifications changes.have been approved by NRC.
The~ staff reviewed all Brunswick TSI's in preparation for the meeting and each i
one was addressed during the meeting.
I The staff is preparing a special report on this subject, and this meeting will add to the content of the report.
o I
Original Signed By:
i E. G. Tourigny, Project Manager i
Project Directorate 11 1 i
Division of Raactor Projects - I/II Office of Nuclear Reactor Regulation s
Enclosures:
- 1. Attendance list i
- 2. Agenda ec: w/ enclosures.
9001050073 891229 E'
See next page PDR ADOCK 05000324 P
PDC o
^
0F C :PDI!-l
- PD
-1
.... :._.. _ _ _ _ _ _ :.D.ISE *JIPJL. _ :._ _ _ _...... : _ _ _ _ _ _ _ _ _... : --.. _ _ _..... :.........
r' gny-
- EA sam NAME :............ :............ :.BEiEtdi.na. _. :........... : _ _ _ _ _ _...... :....
.DATE :12/dy/89
- 12/f89
- 12/29/89 OFFICIAL RECORD COPY OFoI Document Name: MTG SLt@!ARY/ BRUNSWICK
, p i
c yq
.;;l\\
r, w
..8
- ~
1, \\
tsc I;L"";a-.*1
.8
,. ~.
' ~
, o 1
- f.. o
.NRC/CP&L MEETING'
. BRUNSWICK TECHNICAL SPECIFICATION iflTERPRETATIONS t
a December 20,-1989
.i
.i NRC.
CDSL~
E.. Tour igny.
R. Oates R. Giardina-
' B. - Poul k 6
- R. Emch B. Levis is' t
h I
i I
i l r I:
t l'
l t.
f:t..
i:
l;>
a.
w
% 1osure..
m' Tentative Agenda z,..
. #2 CP&L/NRC Meeting Brunswick-TechnicalSpecificationInterpretations(TSI)
December 20, 1989; Room 8-B-11; OWFN 10:00 AM - 5:00 PM o
0 Relationship Between TSI's and TS Change Process (RCI-02.1,RCI-02.2,andRCI-02.3) 0 TSI Procedure (RCI 02.3, Rev. 2) o-Overview Schedule goal for submitting a TS change o-Rational for implementing a TSI (which requires a TS o
change) before a license amendment is issued 0
Individu61 TSI's-Current List (Including rev. number, effective date o
whether the related TS change is under NRC review), and Ground rules staff used in conducting evaluations.
o
.o Limited Discussion TSI's FireProtectionInstruments/ Zone 4ofA0GBldg.(85-10) o P/T Limits for-Rx Vessel (84-10)(Rev. 6) o E
o RSCS Operability (84-20)
RWCU Response Time
{
- PCIS (85-01)(Rev.1(85-12) o o
)
Service Water System Operability (84-06)(Rev. 5) o RPS - Turbine Control Valve Fast Closure (84-19) (Unit.2 Only) o OffsitetoOnsitePowerDistribution(87-01)(Rev.1) o Core Spray Time Dela Drywell Deinerting (y (84-08)(Rev.1) o Core Alterations (89-01) )
o 87-03 o
j o
Full Discussion TSI's l
o CBEFS Operability (85-13)
Secondary Containment Requirement in Condition 5 (86-02) o NeutronMonitoringSurveillanceRequirements(88-01) o-o RHR Room Coolers (87-02)
Control Rod Scram Accumulators (86-01) o o
SLC Operability /RWCU Isolation (85-04) 0 Summary Ce
- Staff a proposes 1nitiate individual TSI discussions and present concerns, 3
if any, followed by licensee additional information, if any.
Limited discussion TSI's should be less than 15 minutes for discussion; full discussion TSI's should be less than 30 minutes for discussion (on a per TSI basis).
- u T
?
- 4;M -
..n-
- y
- ;
c,.
s,c
~ DISTRIBUTION FOR MEETING
ISUMMARY
DATED:' December 29. 1989 b-Facility:. Brunswick Opelm4W~4 A-NRC PDR ~~
Local PDR T. Murley - G-18
- J. Sniezek G-18 E. Adensam.
14-B-20 P. Anderson 14-B-20 E. Tourigny -
14-D - OGC '
~
15-B-18 E. Jordan-HNBB-3302 B. Grimes 9-A-2' R.:Giardina D
R. Emch' B. Levis ACRS(10):
F-?l5 B. Borchardt' 17-G i i
N_.__.___.~.._____._-._-_'..-_.-_____
.