Summary of 891220 Meeting W/Util in Rockville,Md Re Tech Spec Interpretations Being Utilized at Plant.List of Attendees & Meeting Agenda Encl
ML20005E328
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/29/1989
From: Tourigny E
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9001050073
Download: ML20005E328 (4)


Text

^

m s ;;

r

'. Docket'Nos.-50-325 December 29,:1989 and 50-324

/

LICENSEE:

Carolina Power and Light Company FACILITY:

Brunswick Steam Electric Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF DECEMBER 20, 1989 TECHNICAL MEETING WITH CAROLINA POWER AND LIGHT C0t1PANY General NRC staff met with C6rulina Power & Light Company ((CP&L)

- On December 20, 1989, representatives.to discuss the Technical Specifications Interpretations TSI) that'are being utilized at the Brunswick Steam Electric Plant, Units 1 and 2 l

(Brunswick). The meeting was held in Rockville, Maryland; a list of attendees 1

.is included in Enclosure 1. contains the meeting agenda.

Discu ssion -

)

CF&L writes a TSI at Brunswick when the existing Technical Specifications-l (1) are r.ot consistent with the physical or intended design of the plant; (2) do not adequately demonstrate operability or are not sufficiently conservative;

.(3) contain typographical or administrative errars that represent operability 1

or_ surveillance concerns; or-(4) are otherwise uetermined as necessary by the 1

Plant: Nuclear Safety Committee.

The TSI becomes a conpanion document to the e

Technical Specifications.

The TSI is usually cancelled once the associated i

Technical Specifications changes.have been approved by NRC.

The~ staff reviewed all Brunswick TSI's in preparation for the meeting and each i

one was addressed during the meeting.

I The staff is preparing a special report on this subject, and this meeting will add to the content of the report.

o I

Original Signed By:

i E. G. Tourigny, Project Manager i

Project Directorate 11 1 i

Division of Raactor Projects - I/II Office of Nuclear Reactor Regulation s

Enclosures:

1. Attendance list i
2. Agenda ec: w/ enclosures.

9001050073 891229 E'

See next page PDR ADOCK 05000324 P

PDC o

^

0F C :PDI!-l

PD

-1

.... :._.. _ _ _ _ _ _ :.D.ISE *JIPJL. _ :._ _ _ _...... : _ _ _ _ _ _ _ _ _... : --.. _ _ _..... :.........

r' gny-

EA sam NAME :............ :............ :.BEiEtdi.na. _. :........... : _ _ _ _ _ _...... :....

.DATE :12/dy/89

12/f89
12/29/89 OFFICIAL RECORD COPY OFoI Document Name: MTG SLt@!ARY/ BRUNSWICK

, p i

c yq

.;;l\\

r, w

..8

~

1, \\

tsc I;L"";a-.*1

.8

,. ~.

' ~

, o 1

f.. o

.NRC/CP&L MEETING'

. BRUNSWICK TECHNICAL SPECIFICATION iflTERPRETATIONS t

a December 20,-1989

.i

.i NRC.

CDSL~

E.. Tour igny.

R. Oates R. Giardina-

' B. - Poul k 6

R. Emch B. Levis is' t

h I

i I

i l r I:

t l'

l t.

f:t..

i:

l;>

a.

w

% 1osure..

m' Tentative Agenda z,..

. #2 CP&L/NRC Meeting Brunswick-TechnicalSpecificationInterpretations(TSI)

December 20, 1989; Room 8-B-11; OWFN 10:00 AM - 5:00 PM o

0 Relationship Between TSI's and TS Change Process (RCI-02.1,RCI-02.2,andRCI-02.3) 0 TSI Procedure (RCI 02.3, Rev. 2) o-Overview Schedule goal for submitting a TS change o-Rational for implementing a TSI (which requires a TS o

change) before a license amendment is issued 0

Individu61 TSI's-Current List (Including rev. number, effective date o

whether the related TS change is under NRC review), and Ground rules staff used in conducting evaluations.

o

.o Limited Discussion TSI's FireProtectionInstruments/ Zone 4ofA0GBldg.(85-10) o P/T Limits for-Rx Vessel (84-10)(Rev. 6) o E

o RSCS Operability (84-20)

RWCU Response Time

{

- PCIS (85-01)(Rev.1(85-12) o o

)

Service Water System Operability (84-06)(Rev. 5) o RPS - Turbine Control Valve Fast Closure (84-19) (Unit.2 Only) o OffsitetoOnsitePowerDistribution(87-01)(Rev.1) o Core Spray Time Dela Drywell Deinerting (y (84-08)(Rev.1) o Core Alterations (89-01) )

o 87-03 o

j o

Full Discussion TSI's l

o CBEFS Operability (85-13)

Secondary Containment Requirement in Condition 5 (86-02) o NeutronMonitoringSurveillanceRequirements(88-01) o-o RHR Room Coolers (87-02)

Control Rod Scram Accumulators (86-01) o o

SLC Operability /RWCU Isolation (85-04) 0 Summary Ce

  • Staff a proposes 1nitiate individual TSI discussions and present concerns, 3

if any, followed by licensee additional information, if any.

Limited discussion TSI's should be less than 15 minutes for discussion; full discussion TSI's should be less than 30 minutes for discussion (on a per TSI basis).

u T

?

4;M -

..n-

y
;

c,.

s,c

~ DISTRIBUTION FOR MEETING

ISUMMARY

DATED:' December 29. 1989 b-Facility:. Brunswick Opelm4W~4 A-NRC PDR ~~

Local PDR T. Murley - G-18

- J. Sniezek G-18 E. Adensam.

14-B-20 P. Anderson 14-B-20 E. Tourigny -

14-D - OGC '

~

15-B-18 E. Jordan-HNBB-3302 B. Grimes 9-A-2' R.:Giardina D

R. Emch' B. Levis ACRS(10):

F-?l5 B. Borchardt' 17-G i i

N_.__.___.~.._____._-._-_'..-_.-_____

.