mg
^
_
pg
+
'
m y,.
n
c
,
'I
,;g
49
y 1
LDEC'1l9.1989L
U
-i
,
"
'
}
'
-DockitNos.50-348,50-364?
x
E
Alabama, Power Company:
J
' ATTN:, Mr. W. G. Hairston, III:
1
'
Senior-Vice President;
,
Nuclear Operations
40ilnverness Center Parkway
'
J
',
P. O._ Box 1295
.
i
'
.,
+t
Birmingham, AL 35201
Gentlemen: -
-
>
t
,
SUBJECT:
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE
.
-(NRC INSPECTION REPORT NO. 50-348/89-15,50-364/89-15)
'
This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)
<
.
Report for your Farley facility which was sent to- you on.0ctober 5,1989; our
,
"
meeting' of October --30
1989, at which we discussed this report; and your
j
written comments in a. letter dated- November 27, 1989, relative to the report.-
The'. Farley 'SALP - Board Lreconvened on December 12, 1989, to consider your
. comments in , developing the final SALP report.
Following. is the Board's
' disposition of the two issues that you raised:
~
.
1.
Page17(SectionIV.E.~1).
The Board determined that the issue on the qualification of security auditors
~
- was discussed between the inspector and mid-level management but was not of-
such significance to be raised at- the exit meeting or. in the details of the
-report. Therefore, the Board recommended deletion of this paragraph.
'
2._ : Page 21 (Section ~ IV.G.1)
The Board determined that you were correct in your statement that the NRC made
nc! formal request' for the submission of the Westinghouse analysis related to
the cracked 6-inch safety injection pipe.
Although it was the NRC staff's
' understanding that the final report would be forthcoming for use in the
generic resolution of the issue; there was no written commitment by Alabama-
Power.~ Therefore, the Board recommended deletion of references to resolution
1
of Bulletin 88-08.
I concur with the Board's disposition of your comments. The enclosures consist
of.a meeting summary; an errata sheet to the Interim Report, which constitutes
the final report; October 30, 1989 SALP slides, as revised; and your letter
dated November 27, 1989.
,
9001050045 891219
ADOCK0500g8
DR
.1
_
-
-
N" j
-
n
~
n/3L li t
'
!
m
.-
.
- .
>-.
Alabama Power _-Company
2-
g{g 1 g jggg
m
The performance.at the Farley facil'ity' has been excellent and our' SALP report
identifies that ~your efforts have been directed toward -the safe operation of
the: facility. . Your continued commitment _to_ improve overall plant operations
should lead-to continued excellent perfomance.
4
No reply to this letter is required; however, should you have any questions
concerning these-matters, I will be pleased to discuss them with'you.
Sincerely,
!
,
Stewart D. Ebneter
Regienal Administrator
Enclosures:
1.
October 30, 1989 Meeting Summary
'
- 2.
Errata Sheets
3.
October 30, 1989 SALP Slides
l
<
'
4.
APCo comments on SALP Report
(Letter dated November 27,1989)-
cc w/encls:
(Seepage 3)
,
I
E
I
A
.
. .- 5
.
.
-
-
,
"
[
. , '
a
!
,
c :$
,
.
Alabama Power Company
3:
DEC 191989
cc w/encls:
bec w/encls:
B.. L . Moore '
K. M. Carr. Chairman
Manager. Licensing
T. M. Roberts. Commissioner
' Alabama Power Company
F. J. Remick, Comissioner
P. 0. Box 1295
K. C. Rogers. Commissioner
.
Birmingham. AL 35201
J. R. Curtiss.. Commissioner
J. M. Taylor. ED0
R. P. Mcdonald
H. L. Thompson. Jr., EDO
Executive Vice President
R. W. Borchardt. Regional
- Alabama Power Company-
Coordinator. E00
P. 0. Box:1295
T. E. Murley. NRR
Rirmingham.'AL 35201
S. Varga. NRR
E. Adensam. NRR
J.-D. Woodard
E. Reeves. NRR
,
Vice President
R. Nease, SALP Coordinator. NRR
!
Nuclear Farley Project-
Regional Administrators. RI. RIII
Alabama Power Company
RIV, and RV
-P. O. Box 1295
K. Clark. RII
PAO-
Birmingham. AL 35201
D. Verrelli. DRP. RII
-F. Cantrell. DRP. RII
D. N. Morey
P. Balmain. DRP. RII
General Manager
K. Landis Chief. TSS
i
.Farley Nuclear Plant
NRC Resident Inspector
Drawer 470
DRS and DRSS Branch Chiefs.
<
Ashford. AL 36312
and Section Chiefs
INP0'
Louis.B.:Long ' General Manager
IMPELL
.
,
Southern Company Services. Inc.
Document Control Desk
>
P. O. Box 2625
Birmingham AL 35202
Claude Earl Fox
M.D.
State Health Officer
State Department of Public Health
' State Office Building
Montgomery. AL 36130-
Chairman
Houston County Commission
^
Dothan AL 36301
.
State of Alabama
l
'
RII.:DRP
RII: RP
RII:DRP
R.II:D
RII:0 A
B
in
Cantrell
DVt elli
'1
e
ey .
Ji
12/G/89 12/3/89
12/6/89
12/
89
12//f/89
12/j6
r
-
.
o
--4,.
'
,_(
v'
3
- c
.
ENCLOSURE 1
!
I.
Meeting Summary
A.
A meeting was held at 10:00 a.m.
on October 30, 1989, at the
J. M. Farley Nuclear Plant, near Dothan, Alabama, to discuss.the SALP
Board Report for the Farley facility.
B.
Licensee Attendees
R. P. Mcdonald, Executive Vice President, Alabama Power Company (APCo)
W.'G. Hairston, Senior Vice President-Nuclear Operations, APCo
4). P. Woodard, Vice President-Nuclear, APCo
D. N. Morey, General Manager, Farley Nuclear Plant
'
The list of licensee attendees above does not include the large
number of Alabama Power Company employees that were present at the
SALP presentation.
The personnel were supervisors, plant operators,
maintenance personnel, and various plant staff.
This large turnout
was beneficial to the SALP process and is highly recommended for
future presentations.
C.
NRC Attendees
S. D. Ebneter, Regional Administrator, Region II-(RII)
'G. C. Lainas, Assistant Director for Region II Reactors, Division
of Reactor Projects - I/II, Office of Nuclear Reactor Regulation
C. W. Hehl, Deputy Director, Division of Reactor Projects (DRP), RII
F.'S, Cantrell, Chief,. Reactor Projects Section 1B, DRP, RII
G. F. Maxwell, Senior Resident Inspector - Farley, DRP, RII
W. H. Miller, Jr. , Resident Inspector - Farley, DRP, RII
!
!