Forwards Errata to SALP Repts 50-348/89-15 & 50-364/89-15, Per 891030 Meeting & Util 891127 Comments.Performance at Facility Excellent & Rept Identifies That Effort Directed Toward Safe Operation
ML20005E311
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/19/1989
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20005E312 List:
References
NUDOCS 9001050045
Download: ML20005E311 (4)


See also: IR 05000348/1989015

Text

+

-

,

- . -

-

- .-

.

,

mg

^

_

pg

+

'

m y,.

n

c

,

'I

,;g

49

y 1

LDEC'1l9.1989L

U

-i

,

"

'

}

'

-DockitNos.50-348,50-364?

' License' Nos.; NPF-2, NPF-8

x

E

Alabama, Power Company:

J

' ATTN:, Mr. W. G. Hairston, III:

1

'

Senior-Vice President;

,

Nuclear Operations

40ilnverness Center Parkway

'

J

',

P. O._ Box 1295

.

i

'

.,

+t

Birmingham, AL 35201

Gentlemen: -

-

>

t

,

SUBJECT:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

.

-(NRC INSPECTION REPORT NO. 50-348/89-15,50-364/89-15)

'

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)

<

.

Report for your Farley facility which was sent to- you on.0ctober 5,1989; our

,

"

meeting' of October --30

1989, at which we discussed this report; and your

j

written comments in a. letter dated- November 27, 1989, relative to the report.-

The'. Farley 'SALP - Board Lreconvened on December 12, 1989, to consider your

. comments in , developing the final SALP report.

Following. is the Board's

' disposition of the two issues that you raised:

~

.

1.

Page17(SectionIV.E.~1).

The Board determined that the issue on the qualification of security auditors

~

was discussed between the inspector and mid-level management but was not of-

such significance to be raised at- the exit meeting or. in the details of the

-report. Therefore, the Board recommended deletion of this paragraph.

'

2._ : Page 21 (Section ~ IV.G.1)

The Board determined that you were correct in your statement that the NRC made

nc! formal request' for the submission of the Westinghouse analysis related to

the cracked 6-inch safety injection pipe.

Although it was the NRC staff's

' understanding that the final report would be forthcoming for use in the

generic resolution of the issue; there was no written commitment by Alabama-

Power.~ Therefore, the Board recommended deletion of references to resolution

1

of Bulletin 88-08.

I concur with the Board's disposition of your comments. The enclosures consist

of.a meeting summary; an errata sheet to the Interim Report, which constitutes

the final report; October 30, 1989 SALP slides, as revised; and your letter

dated November 27, 1989.

,

9001050045 891219

ADOCK0500g8

DR

.1

_

-

-

N" j

-

n

~

n/3L li t

'

!

m

.-

.

.

>-.

Alabama Power _-Company

2-

g{g 1 g jggg

m

The performance.at the Farley facil'ity' has been excellent and our' SALP report

identifies that ~your efforts have been directed toward -the safe operation of

the: facility. . Your continued commitment _to_ improve overall plant operations

should lead-to continued excellent perfomance.

4

No reply to this letter is required; however, should you have any questions

concerning these-matters, I will be pleased to discuss them with'you.

Sincerely,

!

,

Stewart D. Ebneter

Regienal Administrator

Enclosures:

1.

October 30, 1989 Meeting Summary

'

- 2.

Errata Sheets

3.

October 30, 1989 SALP Slides

l

<

'

4.

APCo comments on SALP Report

(Letter dated November 27,1989)-

cc w/encls:

(Seepage 3)

,

I

E

I

A

.

. .- 5

.

.

-

-

,

"

[

. , '

a

!

,

c :$

,

.

Alabama Power Company

3:

DEC 191989

cc w/encls:

bec w/encls:

B.. L . Moore '

K. M. Carr. Chairman

Manager. Licensing

T. M. Roberts. Commissioner

' Alabama Power Company

F. J. Remick, Comissioner

P. 0. Box 1295

K. C. Rogers. Commissioner

.

Birmingham. AL 35201

J. R. Curtiss.. Commissioner

J. M. Taylor. ED0

R. P. Mcdonald

H. L. Thompson. Jr., EDO

Executive Vice President

R. W. Borchardt. Regional

Alabama Power Company-

Coordinator. E00

P. 0. Box:1295

T. E. Murley. NRR

Rirmingham.'AL 35201

S. Varga. NRR

E. Adensam. NRR

J.-D. Woodard

E. Reeves. NRR

,

Vice President

R. Nease, SALP Coordinator. NRR

!

Nuclear Farley Project-

Regional Administrators. RI. RIII

Alabama Power Company

RIV, and RV

-P. O. Box 1295

K. Clark. RII

PAO-

Birmingham. AL 35201

D. Verrelli. DRP. RII

-F. Cantrell. DRP. RII

D. N. Morey

P. Balmain. DRP. RII

General Manager

K. Landis Chief. TSS

i

.Farley Nuclear Plant

NRC Resident Inspector

Drawer 470

DRS and DRSS Branch Chiefs.

<

Ashford. AL 36312

and Section Chiefs

INP0'

Louis.B.:Long ' General Manager

IMPELL

.

,

Southern Company Services. Inc.

Document Control Desk

>

P. O. Box 2625

Birmingham AL 35202

Claude Earl Fox

M.D.

State Health Officer

State Department of Public Health

' State Office Building

Montgomery. AL 36130-

Chairman

Houston County Commission

^

Dothan AL 36301

.

State of Alabama

l

'

RII.:DRP

RII: RP

RII:DRP

SS

R.II:D

RII:0 A

B

in

Cantrell

DVt elli

'1

e

ey .

Ji

12/G/89 12/3/89

12/6/89

12/

89

12//f/89

12/j6

r

-

.

o

--4,.

'

,_(

v'

3

c

.

ENCLOSURE 1

!

I.

Meeting Summary

A.

A meeting was held at 10:00 a.m.

on October 30, 1989, at the

J. M. Farley Nuclear Plant, near Dothan, Alabama, to discuss.the SALP

Board Report for the Farley facility.

B.

Licensee Attendees

R. P. Mcdonald, Executive Vice President, Alabama Power Company (APCo)

W.'G. Hairston, Senior Vice President-Nuclear Operations, APCo

4). P. Woodard, Vice President-Nuclear, APCo

D. N. Morey, General Manager, Farley Nuclear Plant

'

The list of licensee attendees above does not include the large

number of Alabama Power Company employees that were present at the

SALP presentation.

The personnel were supervisors, plant operators,

maintenance personnel, and various plant staff.

This large turnout

was beneficial to the SALP process and is highly recommended for

future presentations.

C.

NRC Attendees

S. D. Ebneter, Regional Administrator, Region II-(RII)

'G. C. Lainas, Assistant Director for Region II Reactors, Division

of Reactor Projects - I/II, Office of Nuclear Reactor Regulation

C. W. Hehl, Deputy Director, Division of Reactor Projects (DRP), RII

F.'S, Cantrell, Chief,. Reactor Projects Section 1B, DRP, RII

G. F. Maxwell, Senior Resident Inspector - Farley, DRP, RII

W. H. Miller, Jr. , Resident Inspector - Farley, DRP, RII

!

!