- ML19259A718 + (ML19259A718)
- ML19259A720 + (ML19259A720)
- 05000348/LER-1978-089, Forwards LER 78-089/03L-0 & 78-090/03L-0 + (ML19259A721)
- ML19259A722 + (ML19259A722)
- 05000348/LER-1978-089-03, /03L-0 on 781206:while Performing FNP-1-STP-28.2, Diesel Generator 1B Operability Test,Loss of Sys Pressure Sequencer Failed to Pick Up Step 6 (Battery Charger 1B). Exact Cause Was Not Determined + (ML19259A723)
- 05000348/LER-1978-090-03, /03L-0 on 781206:while Reviewing FNP-1STP-1.0, Discovered Tech Spec 4.5.2.a.b Requirements Were Not Being met.V8132A&B Were Open as Required But Breakers to Valid Operators Were Not Locked Open,Due to Personnel Error + (ML19259A724)
- ML19259A725 + (ML19259A725)
- ML19259A726 + (ML19259A726)
- ML19259A727 + (ML19259A727)
- ML19259A728 + (ML19259A728)
- ML19259A729 + (ML19259A729)
- ML19259A730 + (ML19259A730)
- ML19259A731 + (ML19259A731)
- ML19259A732 + (ML19259A732)
- 05000277/LER-1978-048-03, /03L-0 on 781204:surveillance Test Revealed Failure of a Channel Main Steam Line High Flow Circuitry in Primary Containment Isolation Signal Logic Used to Provide Group 1 Isolation,Due to Failure of 5A-K30A Relay + (ML19259A733)
- ML19259A734 + (ML19259A734)
- ML19259A735 + (ML19259A735)
- 05000321/LER-1978-097, Forwards LER 78-097/03L-0 + (ML19259A736)
- ML19259A738 + (ML19259A738)
- 05000321/LER-1978-097-03, /03L-0 on 781214:during Surveillance Testing HNP-1-3202,core Spray Discharge Line Level Switch E21-N010B Failed to Operate.Caused by Actuating Screw Drifting from Setpoint + (ML19259A739)
- ML19259A741 + (ML19259A741)
- ML19259A742 + (ML19259A742)
- 05000318/LER-1978-042, Forwards LER 78-042/03L-0 + (ML19259A744)
- ML19259A745 + (ML19259A745)
- ML19259A746 + (ML19259A746)
- ML19259A747 + (ML19259A747)
- 05000318/LER-1978-042-03, /03L-0 on 781212:number of Operable Charging Pumps Reduced to One Less than Number Required by Tech Specs. Caused by Packings of 2 Charging Pumps Reaching Their Natural End of Life Simultaneously + (ML19259A748)
- ML19259A749 + (ML19259A749)
- ML19259A750 + (ML19259A750)
- 05000366/LER-1978-084, Forwards LER 78-084/03L-0 + (ML19259A751)
- ML19259A752 + (ML19259A752)
- ML19259A753 + (ML19259A753)
- 05000317/LER-1978-058, Forwards LER 78-058/03L-0 + (ML19259A754)
- ML19259A755 + (ML19259A755)
- ML19259A756 + (ML19259A756)
- 05000366/LER-1978-084-03, /03L-0 on 781213:during Visual Insp of Standby Gas Treatment Sys snubbers,R69 Snubber Found to Be Low on Fluid. Caused by Fluid Leaking Past Refill Plug + (ML19259A757)
- 05000317/LER-1978-058-03, /03L-0 on 781218:during Surveillance Testing on No 11 Diesel Generator,Generator Room Ventilation Fan Failed to Start.A B Phase Overload Had Tripped & Was Reset.Tests on Fan Showed Normal Current & No Mechanical Damage + (ML19259A758)
- ML19259A759 + (ML19259A759)
- ML19259A760 + (ML19259A760)
- ML19259A762 + (ML19259A762)
- ML19259A763 + (ML19259A763)
- ML19259A764 + (ML19259A764)
- 05000285/LER-1978-045, Forwards LER 78-045/01T-0 + (ML19259A767)
- ML19259A768 + (ML19259A768)
- ML19259A769 + (ML19259A769)
- 05000285/LER-1978-045-01, /01T-0 on 781220:during Plant heatup,1 Pressure Channel for Power Operated Relief Valve (PORV) Sys Was Responding.Operator Pulled Recorder Fuses Causing PORV Valves to Open,Then Closed Them to Terminate Transient + (ML19259A771)