Forwards LER 78-089/03L-0 & 78-090/03L-0
Date released: 09/30/2019 Download: ML19259A722


LER 78-090/03L-0 on 781206:while Reviewing FNP-1STP-1.0, Discovered Tech Spec 4.5.2.a.b Requirements Were Not Being met.V8132A&B Were Open as Required But Breakers to Valid Operators Were Not Locked Open,Due to Personnel Error
ML19259A724
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/05/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259A724 (1)
LER 78-089/03L-0 on 781206:while Performing FNP-1-STP-28.2, Diesel Generator 1B Operability Test,Loss of Sys Pressure Sequencer Failed to Pick Up Step 6 (Battery Charger 1B). Exact Cause Was Not Determined
ML19259A723
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/05/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259A723 (1)
Forwards LER 78-089/03L-0 & 78-090/03L-0
ML19259A721
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/05/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259A721 (1)