Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19209A499 + (ML19209A499)
- ML19209A500 + (ML19209A500)
- ML19209A501 + (ML19209A501)
- ML19209A502 + (ML19209A502)
- ML19209A503 + (ML19209A503)
- 05000321/LER-1979-079, Forwards LER 79-079/03L-0 + (ML19209A504)
- ML19209A505 + (ML19209A505)
- ML19209A507 + (ML19209A507)
- ML19209A508 + (ML19209A508)
- 05000219/LER-1979-030, Revised Attachment to LER 79-030/03L-0:on 790812,control Rod Drive Pump a Removed from Svc for Repair of Pump Vent Piping.Piping Cracked at Bushing at Entry to Pump Casing. Caused by Operator Carelessness.Bushing Replaced + (ML19209A510)
- ML19209A511 + (ML19209A511)
- ML19209A512 + (ML19209A512)
- ML19209A513 + (ML19209A513)
- ML19209A514 + (ML19209A514)
- ML19209A515 + (ML19209A515)
- ML19209A516 + (ML19209A516)
- ML19209A517 + (ML19209A517)
- ML19209A518 + (ML19209A518)
- ML19209A519 + (ML19209A519)
- ML19209A520 + (ML19209A520)
- ML19209A522 + (ML19209A522)
- ML19209A523 + (ML19209A523)
- ML19209A525 + (ML19209A525)
- ML19209A526 + (ML19209A526)
- ML19209A527 + (ML19209A527)
- ML19209A528 + (ML19209A528)
- 05000321/LER-1979-079-03, /03L-0:on 790909,reactor Water Level Surveillance Test Grace Period Had Been Exceeded.Caused by Personnel Error.Test Was Performed Satisfactorily.Personnel Counseled on Timely Completion of Tests + (ML19209A529)
- ML19209A530 + (ML19209A530)
- 05000277/LER-1979-043, Forwards LER 79-043/01T-0 + (ML19209A531)
- ML19209A532 + (ML19209A532)
- ML19209A533 + (ML19209A533)
- ML19209A534 + (ML19209A534)
- ML19209A535 + (ML19209A535)
- ML19209A536 + (ML19209A536)
- 05000277/LER-1979-043-01, /01T-0:on 790906,two of Four Bolts on Hanger 32-GE-S41 Failed During Insp Program.Caused by Improper Installation of Bolt Anchor Shells.Defective Bolts Have Been Removed & Replaced by Wedge Type Anchor Bolts + (ML19209A537)
- ML19209A538 + (ML19209A538)
- ML19209A539 + (ML19209A539)
- ML19209A540 + (ML19209A540)
- ML19209A541 + (ML19209A541)
- ML19209A544 + (ML19209A544)
- ML19209A545 + (ML19209A545)
- ML19209A546 + (ML19209A546)
- 05000366/LER-1979-102, Forwards LER 79-102/03L-0 + (ML19209A547)
- ML19209A548 + (ML19209A548)
- ML19209A549 + (ML19209A549)
- ML19209A551 + (ML19209A551)
- ML19209A552 + (ML19209A552)
- 05000366/LER-1979-102-03, /03L-0:on 790918,while Performing SP-HNP-2-3106, Instrument Setpoints Were Found to Exceed Tech Spec Limit. Caused by Setpoint Drift.Instruments Were Recalibr & Returned to Svc + (ML19209A553)
- ML19209A554 + (ML19209A554)
- 05000317/LER-1979-045, Forwards LER 79-045/03L-0 + (ML19209A555)
- ML19209A556 + (ML19209A556)