ML19209A505

From kanterella
Jump to navigation Jump to search
Forwards LER 79-079/03L-0
Date released: 08/11/2019 Download: ML19209A505


LER 79-079/03L-0:on 790909,reactor Water Level Surveillance Test Grace Period Had Been Exceeded.Caused by Personnel Error.Test Was Performed Satisfactorily.Personnel Counseled on Timely Completion of Tests
ML19209A529
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/24/1979
From:
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209A529 (1)
Forwards LER 79-079/03L-0
ML19209A504
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/25/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209A504 (1)