ML19209A507

From kanterella
Jump to navigation Jump to search
Forwards Revised Attachment to LER 79-030/03L-0 on 790812
Date released: 08/11/2019 Download: ML19209A507


Revised Attachment to LER 79-030/03L-0:on 790812,control Rod Drive Pump a Removed from Svc for Repair of Pump Vent Piping.Piping Cracked at Bushing at Entry to Pump Casing. Caused by Operator Carelessness.Bushing Replaced
ML19209A510
Person / Time
Site: Oyster Creek
Issue date: 09/24/1979
From:
JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19209A510 (2)
Forwards Revised Attachment to LER 79-030/03L-0 on 790812
ML19209A506
Person / Time
Site: Oyster Creek
Issue date: 09/24/1979
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To: GRIER R H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19209A506 (1)