- ML18101B015 + (ML18101B015)
- ML18101B018 + (ML18101B018)
- ML18101B019 + (ML18101B019)
- ML18101B020 + (ML18101B020)
- IR 05000272/1995008 + (ML18101B021)
- ML18101B021 + (ML18101B021)
- ML18101B022 + (ML18101B022)
- ML18101B023 + (ML18101B023)
- ML18101B024 + (ML18101B024)
- ML18101B025 + (ML18101B025)
- ML18101B026 + (ML18101B026)
- ML18101B027 + (ML18101B027)
- ML18101B028 + (ML18101B028)
- ML18101B029 + (ML18101B029)
- ML18101B030 + (ML18101B030)
- ML18101B031 + (ML18101B031)
- ML18101B035 + (ML18101B035)
- ML18101B036 + (ML18101B036)
- ML18101B037 + (ML18101B037)
- PNO-I-95-043, on 951004,temporary Loss of CR Annunciators Occurred.Licensee Continuing to Troubleshoot Sys + (ML18101B038)
- ML18101B041 + (ML18101B041)
- 05000272/LER-1995-024, :on 950911,determined Fuel Handling Bldg Low Differential Pressure Surveillance Testing Did Not Ensure Compliance W/Ts Requirements.Caused by Inadequate Design Basis Info.Fuel Handling Bldg Changed + (ML18101B042)
- ML18101B043 + (ML18101B043)
- IR 05000272/1994032 + (ML18101B046)
- ML18101B048 + (ML18101B048)
- ML18101B049 + (ML18101B049)
- ML18101B050 + (ML18101B050)
- 05000272/LER-1995-020, Forwards LER 95-020-00 Re Inoperable Volt Motor Control Ctrs Due to Failed Bus Bar Bolting.Attachment a Contains Commitments Currently Outstanding Related to Issue + (ML18101B052)
- ML18101B053 + (ML18101B053)
- 05000272/LER-1995-020-01, :on 950914,vital 230 Volt MCCs Declared Inoperable Due to Failed Bus Bar Bolting.Caused by Stress Corrosion Cracking.Design Change Package DCP-1ER-0098 Implemented to Replace Bus Bolts W/Carbon Steel Bolts + (ML18101B054)
- ML18101B056 + (ML18101B056)
- 05000272/LER-1995-022, :on 950916,ABV Sys Exceeded Allowable Bypass Leakage Due to Tear in Expansion Joint Fabric.Caused by Equipment Failure.Expansion Joint Fabric Replaced + (ML18101B057)
- 05000272/LER-1995-021-01, :on 930403,both Reactor Vessel Level Indication Sys Trains Inoperable Due to Inadvertent CO2 Actuation Due to Water Intrusion.Completed RVLIS & Cabinet Sealing Repaired + (ML18101B058)
- ML18101B060 + (ML18101B060)
- ML18101B062 + (ML18101B062)
- ML18101B071 + (ML18101B071)
- IR 05000272/1995018 + (ML18101B073)
- ML18101B074 + (ML18101B074)
- ML18101B076 + (ML18101B076)
- ML18101B078 + (ML18101B078)
- ML18101B079 + (ML18101B079)
- ML18101B080 + (ML18101B080)
- 05000272/LER-1995-019, :on 950726,operability Functional Test Was Not Performed Prior to Mode Entry.Caused by Lack of Managerial Oversight & Organizational Breakdowns.Entered Tracking as for 1VC1 & 1VC2 for Mode 6 + (ML18101B081)
- 05000272/LER-1995-005, :on 950508,eight Occurrences Revealed Lift Settings of Pressurizer Code Safety Valves on Both Units Out of Required Tolerance.Caused by Testing Intrument Error. Counseled Personnel Involved + (ML18101B082)
- 05000272/LER-1995-010, :on 950615,both Units RHR Pumps Inoperable for long-term Flow Requirements Due to RHR Flow Instrument Uncertainties.Further Evaluated New EOP Setpoint for RHR Pump Operation + (ML18101B083)
- ML18101B084 + (ML18101B084)
- ML18101B086 + (ML18101B086)
- ML18101B087 + (ML18101B087)
- ML18101B088 + (ML18101B088)
- 05000311/LER-1995-004, :on 950607,EFS Actuation Occurred During Unit 2 Controlled Shutdown Per TS 3.0.3.Caused by Inadequate Mgt Oversight of Operability Determination Process.Trained All Licensed Operators + (ML18101B089)
- ML18101B090 + (ML18101B090)