ML18101B015

From kanterella
Jump to navigation Jump to search
Discusses 950919 Telcon Between P Bissett & J Ellis Re Arrangements of Reactor & Senior Reactor Initial Exams Scheduled for Wk of 960122
ML18101B015
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/20/1995
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
References
NUDOCS 9509260114
Download: ML18101B015 (3)


Text

September 20, 1995 Mr. Leon R. Eliason Chief Nuclear Officer & President Nuclear Business Unit Public Service Electric and Gas Company P. 0. Box 236 Hancocks Bridge, New Jersey 08038

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -

SALEM UNITS 1 AND 2

Dear Mr. Eliason:

In a telephone conversation on September 19, 1995, between Mr. Paul Bissett and Mr. James Ellis, arrangements were made for the administration of licensing examinations at the Salem Nuclear Generating Station.

The written examinations and operating tests are scheduled for the week of January 22, 1996.

Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7, Supplement 1, of NUREG-1021, "Operator Licensing Examiner Standards," ES-201,, during the week of January 8, 1996.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.

In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above.

The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.

In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above.

Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

Your staff should submit preliminary reactor and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers.

If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

9509260114 950920 PDR ADOCK 05000272 V

PDR

I:

Mr. Leon R. Eliason 2

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31, 1995.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gathering, xeroxing, and mailing the required material. Send comments about this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6, F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.

Thank you for your consideration in this matter.

Mr. Ellis has been advised of the NRC guidelines and policies addressed in this letter. If you have any questions on the evaluation process, please contact me at 610-337-5211 or E-mail address, GWM@NRC.GOV.

Docket Nos. 50-272; 50-311 Sincerely, Glenn W. Meyer, Chief BWR & PWR Sections Division of Reactor Safety cc:

L. Storz, Senior Vice President - Nuclear Operations E. Simpson, Senior Vice President - Nuclear Engineering J. Hagan, Vice President - Business Support C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

R. Burricelli, Director - External Affairs C. Warren, General Manager - Salem Operations J. Benjamin, Director - Quality Assurance & Nuclear Safety Review F. Thomson, Manager, Licensing and Regulation A. Orticelle, Manager, Nuclear Training G. Mecchi, Principal Training Supervisor J. Ellis, Training Department R. Kankus, Joint Owner Affairs A. Tapert, Program Administrator R. Fryling, Jr., Esquire M. Wetterhahn, Esquire P. MacFarland Goelz, Manager, Joint Generation Atlantic Electric Consumer Advocate, Office of Consumer Advocate William Conklin, Public Safety Consultant, Lower Alloways Creek Township Public Service Commission of Maryland State of New Jersey State of Delaware

Mr. Leon R. Eliason 3

Distribution:

Region I Docket Room (with concurrences)

L. Olshan, NRR W. Dean, OEDO J. Stolz, PDI-2, NRR M. Callahan, OCA Inspection Program Branch, NRR (!PAS)

P. Bissett, Chief Examiner, DRS V. Curley, DRS Nuclear Safety Information Center (NSIC)

NRC Resident Inspector PUBLIC DRS Files (2)

DOCUMENT NAME:

A:SA12296.120 To receive a copy of this document, indicale in the box: "C' = Copy without attachment/enclosure "E' = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS

/11..-. RI/DRS I

I I

I I

NAME PBi ssett/dmcf /~

GMeyer f

DATE 09/20/95 09/7~ /95

,,-~ 09/

/95 09/

/95 09/

/95 OF ICIAL RECORD COPY