Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18094A470 + (ML18094A470)
- ML18094A472 + (ML18094A472)
- ML18094A475 + (ML18094A475)
- ML18094A479 + (ML18094A479)
- ML18094A482 + (ML18094A482)
- ML18094A483 + (ML18094A483)
- ML18094A484 + (ML18094A484)
- ML18094A485 + (ML18094A485)
- ML18094A486 + (ML18094A486)
- ML18094A487 + (ML18094A487)
- ML18094A488 + (ML18094A488)
- ML18094A489 + (ML18094A489)
- IR 05000272/1989009 + (ML18094A491)
- ML18094A492 + (ML18094A492)
- IR 05000272/1989008 + (ML18094A494)
- ML18094A495 + (ML18094A495)
- ML18094A496 + (ML18094A496)
- ML18094A497 + (ML18094A497)
- ML18094A498 + (ML18094A498)
- ML18094A499 + (ML18094A499)
- ML18094A500 + (ML18094A500)
- ML18094A503 + (ML18094A503)
- 05000272/LER-1989-017, :on 890505,discovered That Tech Spec Surveillance 4.3.3.3.1 Not Completed within Required Time Frame on 890429.Caused by Personnel Not Reviewing Overdue Surveillance Rept Thoroughly + (ML18094A509)
- ML18094A513 + (ML18094A513)
- ML18094A514 + (ML18094A514)
- ML18094A515 + (ML18094A515)
- ML18094A516 + (ML18094A516)
- ML18094A517 + (ML18094A517)
- ML18094A518 + (ML18094A518)
- ML18094A519 + (ML18094A519)
- ML18094A520 + (ML18094A520)
- ML18094A521 + (ML18094A521)
- ML18094A522 + (ML18094A522)
- ML18094A525 + (ML18094A525)
- 05000272/LER-1989-020, :on 890520,false Flow Measurement Recorded During Steam Injection Full Flow Test Procedure SP(O)4.5.2H. Caused by Inadequate Procedural Guidance for Installation of Orifice Plates.New Procedure Initiated + (ML18094A526)
- ML18094A527 + (ML18094A527)
- ML18094A530 + (ML18094A530)
- 05000272/LER-1989-021, :on 890523,discovered That High Radiation Area Not Adequately Controlled as Required by Tech Spec 6.12.2. Caused by Personnel Error.Disciplinary Action Has Been Taken + (ML18094A532)
- 05000272/LER-1989-019, Forwards Revised LER 89-019-00,correcting Dates of Original Issue & Occurrence + (ML18094A533)
- ML18094A534 + (ML18094A534)
- 05000272/LER-1989-019-01, :on 890520,both Loops of RHR Sys Were Declared Inoperable Due to Gas Binding of RHR Pumps.Caused by Personnel Error.Use of Test Procedure Discontinued Until Completion of Review.Procedure Revised + (ML18094A535)
- ML18094A536 + (ML18094A536)
- ML18094A537 + (ML18094A537)
- ML18094A538 + (ML18094A538)
- ML18094A539 + (ML18094A539)
- ML18094A540 + (ML18094A540)
- ML18094A541 + (ML18094A541)
- ML18094A543 + (ML18094A543)
- ML18094A544 + (ML18094A544)
- ML18094A545 + (ML18094A545)
- ML18094A546 + (ML18094A546)