Forwards SER Accepting Util 830722 & 851016 Responses to Generic Ltr 83-28,Item 4.5.3, Reactor Trip Reliability On-Line Functional Testing of Reactor Trip Sys. Contractor Rept EGG-NTA-8341 Also Encl
ML18094A479
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/26/1989
From: Stone J
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Enterprise Group
References
GL-83-28, TAC-54021, TAC-54022, NUDOCS 8906020373
Download: ML18094A479 (3)


Text

..

,. *Docket Nos. 50-272/311 May 26, 1989 ~

DISTRIBUTION: w/encls.

Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

Docket File NRC PDR/LPDR PDI-2 Rdng SVarga/BBoger M0 1Brien JStone/MThadani OGC BMozafari EJordan BGrimes ACRS (10)

SUBJECT:

SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR TRIP RELIABILITY - ON-LINE FUNCTIONAL TESTING OF THE REACTOR TRIP SYSTEM (TAC NOS.54021/54022)

RE:

SALEM GENERATING STATION, UNIT NOS. 1 AND 2 Generic Letter 83-28, Item 4.5.3, required confirmation from all licensees and applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.

By letters dated July 22, 1983 and October 16, 1985, you submitted responses to Generic Letter 83-28, Item 4.5.3. Therein you indicated your endorsement of the Westinghouse Owners Group's Report WCAP-10271, as being applicable to Salem, Units 1 and 2.

The NRC staff, with the assistance of our contractor, Idaho National Engineering Laboratory, has reviewed your responses and the Westinghouse Owners Group's report.

We conclude that the existing intervals for on-line functional testing at Salem, Units 1 and 2 are consistent with achieving high reactor trip system availability.

The enclosed safety evaluation and contractor's report (EGG-NTA-8341) provide the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28, Item 4.5.3 to be complete.

This completes all staff activities related to TAC Nos. 54021/54022.

Enclosures:

1. Safety Evaluation Report
2.

Technical Evaluation Report cc w/enclosures:

See next page

[MIL LETTER]

PDI-2/PM JStone:tr 5 ~fo/89 PDl-2/D \\ ~*

~/Butler ~~

s

~(J_/89


;;;---~--------.

-~~;-,-...-y.7*-* q*'>IQ""i**/*,

r 8906U~A}t'(.

1 12 1,-*

13 ~~n~5~72 I

PDR

. -.. PDC F'

Sincerely, Isl James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

UNITED STATES e NUCLEAR REGULATORY COMMl~N WASHINGTON, 0. C. 20555 Docket Nos. 50-272/311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

May 26, 1989

SUBJECT:

SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR TRIP RELIABILITY - ON-LINE FUNCTIONAL TESTING OF THE REACTOR TRIP SYSTEM (TAC NOS.54021/54022)

RE:

SALEM GENERATING STATION, UNIT NOS. 1 AND 2 Generic Letter 83-28, Item 4.5.3, required confirmation from all licensees and app 1 i cants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.

By letters dated July 22, 1983 and October 16, 1985, you submitted responses to Generic Letter 83-28, Item 4.5.3. Therein you indicated your endorsement of the Westinghouse Owners Group's Report WCAP-10271, as being applicable to Salem, Units 1 and 2.

The NRC staff, with the assistance of our contractor, Idaho National Engineering Laboratory, has reviewed your responses and the Westinghouse Owners Group's report.

We conclude that the existing intervals for on-line functional testing at Salem, Units 1 and 2 are consistent with achieving high reactor trip system availability.

The enclosed safety evaluation and contractor's report (EGG-NTA-8341) provide the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28, Item 4.5.3 to be complete.

This completes all staff activities related to TAC Nos. 54021/54022.

Enclosures:

1. Safety Evaluation Report
2. Technical Evaluatton Report cc w/enclosures:

See next page Sincerely,

~C-~

James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:

Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, DC 20006 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Robert Traee, Mayor Lower Alloways Creek Township Municipal Ha 11 Hancocks Bridge, NJ 08038 Kathy Halvey Gibson, Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Co11111ission Drawer I Hancocks Bridge, NJ 08038 Richard F. Engel Deputy Attorney General Department of Law and Public Safety CN-112 State House Annex Trenton, NJ 08625 Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering State of New Jersey CN 415 Trenton, NJ 08625 Salem Nuclear Generating Station Richard B. McGlynn, Commission Department of Public Utilities State of New Jersey 101 Co11111erce Street Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Conrnission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk.

Municipal Building, P.O. Bo~ 157 Hancocks Bridge, NJ 08038 Mr. Bruce Ae Preston, Manager Licensing and Regulation Nuclear Department P.O~ Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Scott B. Ungerer MGR. - Joint Generation Projects Atlantic Electric P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Delmarva Power & Light Company c/o Jack Urban General Manager, Fuel Supply 800 King Street P.O. Box 231 Wilmington, DE 19899