Similar Documents at Salem |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML18107A5421999-09-22022 September 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML20209B6751999-06-29029 June 1999 Ack Receipt of from Dr Powell in Response to NRC Re Fitness for Duty.Attachment 2 of Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4091999-06-22022 June 1999 Forwards Discharge Monitoring Rept for May 1999,containing Info as Required by Permit NJ0005622.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3371999-05-21021 May 1999 Forwards NPDES Discharge Monitoring for Salem Generating Station for Apr 1999, Containing Info as Required by Permit NJ0005622 ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2411999-04-22022 April 1999 Forwards Draft Revised Pages 4.1 & 4.2 of Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Changes Are Noted in Italics ML18107A1841999-04-14014 April 1999 Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl ML18107A1981999-04-12012 April 1999 Responds to 990312 RAI Re Request for Change to TSs Permissible Enrichment Values for New Fuel Storage,Which Was Submitted on 990202 ML18107A1691999-04-12012 April 1999 Forwards Proprietary & non-proprietary Epips,Including Rev 17 to EPIP 807,rev 1 to NC.EP-EP.ZZ-0801(Q) & Rev 2 to NC.EP-EP.ZZ-0806(Q) & Revised EPIPs Table of Contents. Proprietary Info Withheld ML20205K4541999-04-0808 April 1999 Forwards Revised Info Re 990330 NRC Nuclear Power Reactor Licensee Financial Qualifications & Decommissioning Funding Assurance Status Rept ML18106B1491999-04-0505 April 1999 Forwards Drafts of Proposed Changes to Pages 4.1 & 4.2 of Emergency Plan,Which Are Contained on Page 4.2 & Noted in Italics & Underlined ML20205F8981999-03-31031 March 1999 Provides Info Re Status of Decommissioning Funding for LGS, Units 1 & 2,PBAPS,Units 1,2 & 3 & Sgs,Units 1 & 2,per Requirements of 10CFR50.75(f)(1) ML18106B1431999-03-31031 March 1999 Forwards Pse&G Rept on Financial Min Assurance for Period Ending 981231 for Hope Creek,Salem,Units 1 & 2 & Pbaps,Units 2 & 3,IAW 10CFR50.75 ML18107A2201999-03-30030 March 1999 Forwards Final Exercise Rept for 980303,full-participation Plume Exposure Pathway Exercise & 980505-07, full-participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response for Salem & Hope Creek 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML18095A4881990-09-17017 September 1990 Requests Regional Waiver of Compliance from Tech Spec 3.6.2.3, Containment Cooling Sys. Waiver Requested in Order to Allow Replacement of Containment Fan Cooler Unit Motor #22 W/O Requiring Plant Shutdown ML18095A4901990-09-13013 September 1990 Provides Supplemental Info Applicable to Clarification of 10CFR50,App R Exemption Request Re Fire Suppression Sys for Panel 335,per NRC Request ML20059E6821990-09-0404 September 1990 Forwards Info Re Temporary Mod to Security Plan Concerning Protected Area.Info Withheld ML18095A4641990-08-31031 August 1990 Forwards Revised Response to NRC Bulletin 88-004 Re Potential pump-to-pump Interaction.Util Pursuing Permanent Solution to Issue & Will Implement Appropriate Permanent Field Change by End of Unit 1 10th Refueling Outage ML18095A4621990-08-31031 August 1990 Provides Revised Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Only HXs Exhibiting Unsatisfactory Test Results Will Be Inspected & Possibly Cleaned ML18095A4431990-08-30030 August 1990 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Rev 6 to Odcm. ML18095A4531990-08-30030 August 1990 Forwards RERR-28, Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Revised Odcm.W/O Revised ODCM ML18095A4391990-08-29029 August 1990 Forwards Semiannual Rept Re fitness-for-duty Performance Data for 6-month Period Ending 900630,per 10CFR26.71(d).Rept Includes Testing Results,Random Testing Program Results & Confirmed Positive Tests for Specific Substances ML18095A4421990-08-28028 August 1990 Clarifies 900710 Request for Amends to Licenses DPR-70 & DPR-75,changing Sections I & M.Under Proposed Change,Section I Should Be Changed to Read Section 2.J for License DPR-70 & Section M Changed to Read Section 2.N for License DPR-75 ML20059B6611990-08-22022 August 1990 Confirms That 10 Anchor/Darling Model S350W Swing Check Valves Installed at Plant,Per NRC Bulletin 89-002.All 18 Valves Inspected & Retaining Block Studs Replaced W/Upgraded Matl.No Crack Noted on Any Studs Which Were Replaced ML20059C2861990-08-21021 August 1990 Provides Correction to 900810 Response to Request for Addl Info Re Util Request for Restatement of OL Expiration Dates ML18095A4151990-08-10010 August 1990 Forwards Response to Request for Addl Info Re Reinstatement of OL Expiration Dates Based on Original Issuance of Ols. Advises That Correct Expiration Date for OL Proposed to Be 200418 ML18095A4091990-08-0909 August 1990 Forwards Responses to NRC Comments Re Plant Simulator Certification for 10CFR55.45(b)(2),per 891228 Ltr ML18095A4061990-08-0808 August 1990 Forwards Corrected marked-up Pages for Tech Spec Table 3.3-11 Re Subcooling Margin Monitor & Reactor Vessel Level Instrumentation Sys,Per 900223 Ltr.Administrative Changes Made as Indicated ML18095A3861990-07-30030 July 1990 Forwards Listing of Station Blackout Major Audit Items Resolution Scope,Per Station Blackout Schedule Commitment ML18095A3661990-07-26026 July 1990 Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations ML18095A3761990-07-26026 July 1990 Forwards Decommissioning Repts & Certification of Financial Assurance for Plants ML18095A3721990-07-24024 July 1990 Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75 ML18095A3751990-07-18018 July 1990 Provides Status of Commitments Made to NRC by Util in 900109 Ltr Re NUREG-0737,Item II.D.1,per 900628 Telcon ML18095A3741990-07-18018 July 1990 Provides Supplemental Info Re Facility sub-cooling Margin Monitor ML18095A3611990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML18095A3621990-07-18018 July 1990 Forwards Corrected Tech Spec Page 3/4 3-5 for License Change Request 89-12 Submitted on 891227 & 900521 ML18095A3591990-07-13013 July 1990 Corrects Typo in 900702 Response to Generic Ltr 90-04 Re Schedule for Completion of Remaining Open Items ML18095A3471990-07-11011 July 1990 Responds to NRC 900611 Ltr Re Violations Noted in Insp Repts 50-272/90-14 & 50-311/90-14.Corrective Actions:Directive from Radiation Protection Mgt to All Radiation Protection Personnel Issued Re Control of Compliance Agreement Sheets ML18095A3451990-07-10010 July 1990 Forwards Addl Info Re License Change Request 89-03 Re Reactor Trip Sys Instrumentation ML18095A3461990-07-10010 July 1990 Responds to NRC 900608 Ltr Re Violations Noted in Insp Repts 50-272/90-12 & 50-311/90-12.Corrective Actions:Assessment of ECCS & Component Performance Undertaken & ECCS Flow Testing Procedure Upgraded to Address Human Factors ML18095A3491990-07-10010 July 1990 Forwards Jn Steinmetz of Westinghouse 900614 Ltr Re Reassessment of Util Response to Bulletin 88-002 ML18095A3481990-07-10010 July 1990 Submits Supplemental Rept Identifying Root Cause of Missed Commitment & Corrective Actions to Assure Future Compliance Re Implementation of Mods to Facility PASS ML18095A3441990-07-0909 July 1990 Provides Written Notification Re Change in Calculated Peak Clad Temp,Per 900606 Verbal Notification ML18095A3281990-07-0202 July 1990 Responds to NRC 900530 Ltr Re Violations Noted in Insp Repts 50-272/90-09 & 50-311/90-09.Corrective Actions:Util Intends to Use Nuclear Shift Supervisor as Procedure Reader & EOP, Rev 2 Under Development ML18095A3301990-07-0202 July 1990 Responds to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues.Table Describing Status of Generic Safety Issue Implementation Encl ML18095A3391990-06-29029 June 1990 Forwards Correction to 890913 License Change Request 88-09, Consisting of Tech Spec Page 3/4 4-13 ML18095A3221990-06-28028 June 1990 Provides Supplemental Info Re 900223 Proposed Revs to Tech Specs for Reactor Vessel Level Instrumentation Sys.Tables 3.3-11a & 3.3-11b Should Be Combined Into Single Table ML18095A3231990-06-28028 June 1990 Responds to NRC 900518 Ltr Re Violations Noted in Insp Repts 50-272/90-10,50-311/90-10 & 50-354/90-07.Two Noncited Violations Disputed.Util fitness-for-duty Program Exceeds Part 26 Requirements for Positive Blood Alcohol Limits ML18095A3241990-06-28028 June 1990 Forwards Retyped Pages to 871224 License Change Request 87-15 & Modified,Per 900620 Ltr ML18095A3211990-06-26026 June 1990 Requests 30-day Extension Until 900730 to Provide Completion Schedule to Resolve Audit Findings Re Station Blackout ML18095A3161990-06-25025 June 1990 Forwards Supplemental Info Re Response to Generic Ltr 88-14. All Committed Actions Complete as of 900613 ML18095A3141990-06-25025 June 1990 Provides Schedule Change for Implementation of Control Room Mods.Schedule Modified to Address Overhead Annunciator Human Engineering Discrepancies During Phase III ML18095A3201990-06-25025 June 1990 Responds to NRC 900524 Ltr Re Violations Noted in Insp Repts 50-272/90-11 & 50-311/90-11.Corrective Actions:All Overdue Operations & Maint Procedure Files Reviewed for Outstanding Rev Requests & Procedure Upgrade Program Initiated ML18095A3001990-06-20020 June 1990 Provides Addl Info Re Application for Amend to Licenses DPR-70 & DPR-75 Concerning Turbine Valve Surveillance Interval,Per 900320 Request.Util Adding Direction to Personnel If Unnacceptable Flaws Found ML20043H6221990-06-20020 June 1990 Provides Supplemental Info Re NRC Bulletin 88-008 for Fifth Refueling Outage.Detailed Test Rept Being Prepared to Document Results of Each Individual Insp Re Insulation, Hangers & High Energy Break Areas ML18095A2991990-06-20020 June 1990 Forwards Westinghouse Affidavit Supporting 900412 Request for Withholding Proprietary Info from Public Disclosure Per 10CFR2.790 ML18095A2721990-06-0808 June 1990 Responds to NRC 900329 Ltr Re Weaknesses Noted in Insp Repts 50-272/90-80 & 50-311/90-80.Corrective Actions:Fire Doors Placed on Blanket Preventive Maint Work Order & Damaged Fire Doors Will Be Repaired Immediately ML18095A2711990-06-0606 June 1990 Submits Info in Support of 900522 Verbal Request for Relief from Requirements of ASME Section XI ML18095A2611990-06-0101 June 1990 Forwards Corrected Operating Data Rept, Page for Apr 1990 Monthly Operating Rept ML18095A2521990-06-0101 June 1990 Forwards Application in Support of Request for Renewal of NJPDES Permit NJ0005622,per Requirements of Subsection 3.2 of Plant Environ Protection Plan,Nonradiological ML18095A2591990-06-0101 June 1990 Forwards Corrected Unit Shutdown & Power Reductions, Page for Apr 1990 Monthly Operating Rept ML18095A2411990-05-30030 May 1990 Submits Special Rept 90-4 Addressing Steam Generator Tube Plugged During Fifth Refueling Outage.Plugging Completed on 900516.Cause of Tube Degradation Attributed to Normal Wear Due to Erosion/Corrosion Factors ML18095A2431990-05-30030 May 1990 Informs of Util Plans Re Facility Cycle 6 Reload Core, Expected to Achieve Burnup of 16600 Mwd/Mtu.All Postulated Events within Allowable Limits Based on Review of Basis of Cycle 6 Reload Analysis & Westinghouse SER ML18095A2531990-05-29029 May 1990 Provides Addl Info Re End of Life Moderator Temp Coefficient.Feedback Used in Steam Line Break Has No Relationship to Full Power Moderator Density Coefficient 1990-09-04
[Table view] |
Text
Public Service Electric and Gas Company Pu::ir:::.- Serv12e !:'ec'.;,c a~::! Gas Cc:npan1* P.O. Be): 23E. Hancocks Sricgs. NJ 08038 609-339-4199 May 31, 1989 NLR-N89116 United States Nuclear Regulatory Commission Document Control Desk Washington DC 20555 Gentlemen:
RESPONSE TO NOTICE OF VIOLATION NRC COMBINED INSPECTION REPORT NO. 50-272/89-01 AND 50-311/89-01 SALEM GENERATING STATION UNITS NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311
- Public Service Electric and Gas Company (PSE&G) has received the subject inspection report dated March 31, 1989, which included a Notice of Violation concerning failure to i.mplement procedures and concerning inadequate corrective actions for recurrent nonconformances relating to material classification and mixed storage. Pursuant to the requirements of 10 CFR 2.201, our response to this Notice of Violation is provided in the attachment to this letter.
Should you have any questions in regards to this transmittal, do not hesitate to call.
sincerely, Attachment
Document Control Desk 2 5/31/89 NLR-N89116
- C Mr. J. c. Stone Licensing Project Manager Ms. K. Halvey Gibson Senior Resident Inspector Mr. w. T. Russell, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625
--~--
ATTACHMEN'r NLR-N89116 PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM GENERATING* STATION UNITS NOS. 1 AND 2 RESPONSE- TO NOTICE OF VIOLATION Public Service Electric and Gas Company (PSE&G) has reviewed the Inspection Report dated March 31, 1989, containing the Notice of Violation. The subject violations and PSE&G's respective responses are provided below.
VIOLATION A Technical Specification 6.8.l requires that procedures be established implemented and maintained-for surveillance and test activities of safety-related equipment.
Contrary to the above, surveillance procedures were not properly implemented as follows:
- 1. On February 6, 1989, a licensed reactor operator failed to switch steam generator water level- control to the alternate protection channel as required by procedure SP(0)2.6.060, "No 14 Steam Generator Pressure Channel Functional Test"; which subsequently resulted in a reactor trip from full power for Unit 1.
- 2. On February 7, 1989, a licensed reactor operator failed to defeat the second level undervoltage protective relay for the C vital bus as required by procedure SP(0)4.3.1.1.1, "Reactor Coolant Pump Breaker Status Indication"; which resulted in an emergency diesel generator start and sequencing of blackout loads on the c vital bus.
- 3. On February 18, 1989, an instrument and controls technician failed to verify the proper status of reactor protection system panel lights for turbine stop valves and turbine low oil pressure as required by procedure lIC-2.6.025 "lPT-506 First Stage Turbine Impulse Pressure"; which resulted in a reactor trip at low power for Unit 1.
RESPONSE
PSE&G DOES NOT CONTEST THE VIOLATION PSE&G fully understands the seriousness and significance of these events. PSE&G recognizes it's responsibility in assuring that human errors are maintained at a minimum and does not contest the violation.
PSE&G considers procedure compliance and attention to detail as high priority items. In practice, PSE&G considers minimizing and reducing human error essential in it's efforts to attain improved operating performance. To date PSE&G has taken significant actions to prevent and deter human errors. These actions include:
Labeling and color coding the specific components and areas of the plant to visually enhance which unit personnel are working in.
Color coding the procedures and tagging paperwork to ensure use and application to the proper unit.
Computerizing the-Operations tagging system (TRIS) to significantly reduce the tagging workload on the control room operators and thereby reducing distractions. TRIS also provides for standard tagging which eliminates human errors made in generating tagging requests for repetitive work.
Use of letters from the General Manager - Salem Operations to station personnel for specific operational concerns.
Recent examples include attention to detail and mid-loop operations concerns.
Detailed operator training, including the use of the simulator and/or the use of video equipment, in areas such as: Team training, conduct of operations, job performance and attention to detail training.
Use of the simulator for training on specific plant changes and for start-up training prior to restart after shutdowns.
Transferring most of the station procedures to the Technical Department to allow for better technical review and support.
Performance of HPES evaluations on selected incidents.
Developing Job Performance Measures (JPMs) to allow for better training of personnel in the areas they need to know on the job.
Revising OD-15, Use of Operations Department Procedures, to provide greater detail on the use and application of procedures.
Controlling access to the Control Room Area to minimize distractions to the operators. This includes setting up the Work Control Center to interface on component and system tagging to reduce the distraction and work load on the operators.
Use of second verifications, signature sign-offs, supervisory reviews and verification reviews, to* minimize the chance of errors going undetected.
PSE&G's actions to minimize and reduce human error are still ongoing with the Control Room Design Review modifications, being made over the present and next two refueling outages, leading the way.
ROOT CAUSE The root cause of these events has been attributed to personnel error of separate individuals in each occurrence.
PSE&G has conducted an investigation to determine if other factors contributed to the events. Interviews with the individuals and subsequent root cause determination investigations have not revealed any pertinent conditions that could have contributed to the event. Overtime was determined not to be a factor in any of the events nor did any of the individuals feel that they were distracted by other activities.
Therefore, the only pertinent outside contributor to the events was the actual surveillances, which cause the personnel to operate components in higher risk situations than normal operations. PSE&G is developing a License Change Request to reduce the frequency of Reactor Trip Protection and Engineered Safeguards Features Actuations system surveillances, based on generic Westinghouse methodology. This along with other "Trip Reduction" type Amendments should help reduce operation in higher risk situations.
CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED In regards to the specific items of concern stated in the Notice of Violation, PSE&G has taking the following corrective actions:
Management has ensured that each individual has been held accountable for their actions in these events.
The Operations Department Management has reviewed the events of February 6th and 7th with the appropriate Operations Department personnel.
The Unit 1 procedures associated with the turbine impulse pressure transmitter channel have been revised to indicate that a reactor trip will occur if the respective procedure is performed with the turbine unlatched.
CORRECTIVE STEPS TAKEN TO PREVENT RECURRENCE The event of February 18, 1989 will be reviewed with all Maintenance Department personnel to stress procedure compliance by May 30, 1989.
The Technical Department Procedure Upgrade Project has been tasked with addressing high-risk procedures/steps. The project will identify the high-risk procedures/steps to alert technicians and operators of a potential for plant trips during the performance of the appropriate procedures.
Installation of DCR lEC-2193 will replace the Reactor Trip/Turbine Trip with the P-9 function. This DCR will eliminate the possibility of tripping the reactor from repeating this occurrence. This DCR will be completed during the current Unit 1, 8th Refueling Outage and is scheduled for completion by May 30, 1989. The Technical Specification Amendment (a "Trip Reduction" Amendment) had been approved prior to the event; however, the design change could only be performed during an outage. The design change was installed in Unit 2 during the last Refueling Outage.
PSE&G is continuing to investigate appropriate "Trip Reduction" Technical Specification Amendment and/or Design Modification changes.
PSE&G is developing a detailed training video to educate all
- personnel in proper attention to detail practices.
PSE&G management is continuing in its efforts to improve job performance work standards and procedure usage.
VIOLATION B The Code of Federal Regulations 10 CFR 50 Appendix b,Section XVI, requires, in part, that measures shall be established to assure that the causes of significant conditions adverse to quality (nonconformances) be determined and that corrective action be taken to preclude repetition.
Contrary to the above, licensee corrective actions for recurrent nonconformances relating to material classification and mixed storage discrepancies have not effectively precluded repetition of previous nonconf ormances as evidenced by the following findings:
- 1. On or about April 1, 1987, a Corrective Action Request, MC-87-COOl was issued for nonconformances in the area of material control; '
- 2. On or about June 6, 1988 a Quality Action Request, SP-88-QOOl was issued for failure to correct material identification and control deficiencies identified in February 1988;
- 3. - On or about July 7, 1988 and again on or about November 3.0, 1988 material in the Salem Warehouse was found to be incorrectly identified;
- 4. On or about August 1988 a Management Action Request, MA-88-MOOl was issued in part for continuing nonconformances in the areas of material identification and control; and
- 5. on or about October 31, 1988 a Quality Action Request, MR-88-Q005 was issued for continuing nonconformances in the areas of material identification and control.
RESPONSE
PSE&G DOES NOT CONTEST THE VIOLATION DISCUSSION The subject violation is apparently based on the failure .of PSE&G to correct or prevent recurrence of self-identifiedvmaterial control nonconformances over a 3 year period. The majority of the problem reports of concern stem from two major areas: shelf life and inconsistent classification of materials in the same bin. As a result of the Self Identified discrepancies, stated in the Violation, the NRC has concluded that management decisions have been made not to attempt to identify similar occurrences of the identified problems, not to physically segregate material, and not to establish any compensatory formal controls to prevent questionable material issuance.
Presently approximately 1400 Problem Reports, identifying possible deficiencies, have been identified. To date these problem reports have not been dispositioned in an expeditious manner. Until this backlog is eliminated, the identified material discrepancies shall exist.
BACKGROUND Inconsistent Classification of Material In the Same Bin Approximately 3 years ago, PSE&G revised its procedures for performing material classification reviews to incorporate the upgraded regulatory and industry procurement standards. As the material that was presently in storage was purchased under the required standards in effect at that time, PSE&G believed these material classifications to be satisfactory. Since the revised procedure was an enhancement of the existing material classification process (which was in compliance), it was believed that the prior material would not impact safety or quality and that no formal review of previous procured material was necessary. Consequently, a management decision was made to perform the revised classification reviews by the material reorder method.
.. As an enhancement to the material control process, it was intended to use the Problem Report process to identify and ensure prompt disposition of material in which 'the previous procurement classification differed from the current procurement classification. Thus all material in stock was assigned a unique code to identify that it had been procured prior to implementation of the revised classification review procedures.
When the classification of material procured under the new procedures differs from the classification of the uniquely coded in stock material, a Problem Report is initiated and the previous classified material tagged to prevent issuance. The Problem Report material was maintained in the same bin as the material that was allowed to be issued. However, Procurement and Material Control Procedures instruct the material handling personnel not to issue Problem Report material.
To date, approximately 400 Problem Reports associated with inconsistent classifications have been identified as a result of implementing the aforementioned program.
Shelf Life Program Discrepancies In 1988 the Shelf Life Program was modified. This resulted in new shelf life limited material, as well as removing some materials from their shelf life limitations. Certain other materials had shelf lives that had changed under the new (modified) program. To ensure that all shelf life discrepancies were identified, various walkdowns of the existing stock mater~als were performed. The Problem Report process was used as the appropriate mechanism for identifying and resolving these discrepancies. This effort has resulted in approximately 1000 Problem Reports. *
- As stated previously the Problem Report material is allowed to remain in the bin; however, the material handling personnel are prohibited from issuing the material until the Problem Report is dispositioned. Additionally, Procurement ~nd Material Control Procedure Mll-P-301 requires that material be reviewed prior to issuance to insure that it has not exceeded its assigned shelf life. Furthermore, if material has exceeded its assigned shelf life it cannot be issued and must be tagged and controlled in accordance with Procedure Mll-P-300.
Control of the Problem Reporting Process Problem Reports are utilized as a tool for identifying and controlling potential material discrepancies. A majority of the Problem Reports written, have been associated with material tagging differences related to mixed classifications or shelf life discrepancies. Administrative controls are in place to physically identify, tag and preclude issuance of material with potential discrepancies until proper Engineering and Quality
Assurance (QA) reviews have been completed. Procurement and Material Control Procedure Mll-P-300 provides the material handling personnel with instructions on how to identify and preclude issuance of potential problem material.
A 1986 QA audit identified programmatic problems related to material shelf life. A Corrective Action Request (CAR) was issued for resolution of the problems. Subsequently, QA follow-up activities revealed that programmatic shelf life problems continued and the CAR was escalated to a Management Action Request (MAR). This time the QA follow-up resulted in a positive finding, based on adequate control of the shelf life program and the use of the Problem Report program. Thus, the MAR was closed.
Two of the Action Requests (SA-88-C016-0 and MA-88-MOOl-O) referenced by the ~nspector were issued as a result of identification and traceability problems. Detailed responses to these items were generated, with one item closed and continuing follow-up on the other. Neither of these Action Requests were related to shelf life and mixed classification.
The remainder of the Surveillance Reports and Action Requests, presented to the Inspector, were written in conjunction with planned QA Program surveillances. The Action Requests were issued to properly document shelf life and mixed classification conditions found by the QA Engineer. In each case isolated occurrences were identified which were not considered programmatic in nature. PSE&G will continue to perform audits and surveillances of these activities to ensure effective implementation of the Problem Reporting System.
ROOT CAUSE The root cause has been attributed to inadequate management attention that resulted in untimely resolution of Problem Reports which allowed an unacceptable backlog to develop.
As stated earlier the use of the Problem Report to identify classification differences was meant as an enhancement, to further assure that all possible material discrepancies were identified. It was intended that any potential material problems identified within this process would be resolved in a timely manner. In reality the volume of problems identified could not be handled expediently within the staffing level. The addition of the. Problem Reports pertaining tci shelf life put an additional burden on the working staff. Based on the fact that administrative controls were in place to preclude issuance of potentially deficient material, and knowing that previous material classifications were performed to the regulatory requirements in effect at time of purchase, the problem was not determined to be a high priority item. Thus, a management decision was made to disposition Problem Reports consistent with the Station material needs. Consequently, the Problem Reports were not resolved in a timely manner and a backlog of Problem Reports accumulated.
IMMEDIATE CORRECTIVE ACTIONS The PSE&G Procurement Engineering Group has added additional temporary staff personnel to disposition and thus eliminate the backlog of Problem Reports. The elimination of Problem Reports relative to shelf life and mixed classification will be completed by September 1, 1989.
In conjunction with the backlog elimination effort, the Procurement and-Material Control Department will perform an initial walkdown of open Problem Reports to assure that material is properly tagged and that checks are performed to assure that tagged material is not issued. Additional walkdowns will be performed as necessary to ensure administrative controls are being followed.
The perm-anent staffing level of the Procurement Engineering Group has been significantly increased as a result of a 12 month analysis of the work load and resource allocation of the Procurement Engineering Organization. This staffing level will insure that adequate resources will be available to disposition Problem Reports in an efficient manner.
CORRECTIVE ACTIONS TO PREVENT RECURRENCE Currently, PSE&G has two projects underway which will consolidate identical inventory items and process unreviewed, open requisitions. This will significantly reduce the number of remaining inventory items requiring classification review. These projects are scheduled for completion by December, 1989. PSE&G will scope the remaining inventory (requiring classification review) and develop a project plan and schedule for comple.ting the classification review of the remaining inventory as a dedicated project in lieu of using the current reorder method.
As mentioned earlier, PSE&G has recently increased the permanent staff in the Procurement Engineering Group. This staffing level will insure that processing of Procurement Documents and Problem Reports can be maintained within targeted processing performance indicators.
Process performance indicators will be developed and reviewed by management to insure that unsatisfactory performance trends will be readily identified. Thereby insuring that remedial action can be implemented to preclude recurrence of the issues cited herein.