ML18094A514

From kanterella
Jump to navigation Jump to search
Forwards Revised Tech Spec Pages 3/4 4-35 & 3/4 4-34 for Incorporation Into Util 880912 License Change Request 88-02 to Add 72 H Action Statement in Event That All Reactor Vessel Head Vent Pathways Inoperable,Per Generic Ltr 83-37
ML18094A514
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/08/1989
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18094A515 List:
References
GL-83-37, NLR-N89103, NUDOCS 8906140043
Download: ML18094A514 (2)


Text

. .-

Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4199 Vice President and Chief Nuclear Officer June 8, 1989 NLR-N89103 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

REVISED REQUEST FOR AMENDMENT REACTOR HEAD VENTS LICENSE DPR-70 AND DPR-75 SALEM GENERATING STATION DOCKET NOS. 50-272 AND 50-311 Attached are revised Technical Specification pages 3/4 4-35 (Unit

1) and 3/4 4-34 (Unit 2) for incorporation into License Change Request (LCR) 88-02, which was submitted via PSE&G letter NLR-N88136 dated September 12, 1988. The revised pages are being submitted pursuant to a request by Mr. J. Stone, NRC Licensing Project Manager.

The revised pages add a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement in the event all Reactor Vessel Head Vent pathways become inoperable. The revised pages also clarify the number of Reactor Head Vent pathways that exist in each unit. These proposed revisions are being submitted to more closely resemble the Technical Specifications recommended by Generic Letter 83-37. The variation from the Generic Letter is that Salem's PORVs and head vents are addressed in separate specifications versus in the same specification as in Generic Letter 83-37.

PSE&G has reviewed the revised LCR against the original submittal and has determined that the original Significant Hazards Consideration remains valid and that the proposed changes do not constitute a Significant Hazards Consideration.

Should you have any questions, please feel free to contact us.

Sincerely, Attachment

Document Control Desk 2 06-08-89 NLR-N89103 c Mr. J. c. Stone Licensing Project Manager Ms. K. Halvey Gibson Senior Resident Inspector Mr. W. T. Russell, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625