ML18094A472

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 890501-05.Violation Noted: Licensee Rents NRC Approved Type a Package from Nupac But Has Not Evaluated Nupac Since Initial pre-awards Review in Mar 1987
ML18094A472
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/22/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18094A471 List:
References
50-272-89-10, 50-311-89-09, 50-311-89-9, NUDOCS 8906020260
Download: ML18094A472 (1)


Text

APPENDIX A NOTICE OF VIOIATION Public service Electric and Gas Co.

Salem Nuclear Generating station Docket Nos. 50-272; 50-311 License Nos. DPR-70; DPR-75

'As a result of the inspection conducted at the Salem Nuclear Generating station on May 1-5, 1989, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following violation was identified:

10 CFR 71.101 states in part that "Each licensee shall establish, maintain, and execute a quality assurance program... satisfying any specific provisions which are applicable to the licensee's activities including procurement of packaging".

'!he licensee's Quality assurance program procedure Q.AP 6-1, paragraph 5.1. 2. 2 states in part that "Major contractors who provide services at the station shall be evaluated annually".

Q.AP 6-1, Attachment 4, item 6.h.

lists "Packa9ing an:l Transport of Radioactive Material per 10 CFR 71", as one of the activities to be audited and evaluated in accordance with the procedure.

Contrary to the above, the licensee rents an NRC approved Type A package from.

NUPAC, but has not evaluated NUPAC since the initial pre-awards review in March 1987.

'Ibis violation has been categorized as a Severity Level IV problem (SUpplement VII).

Pursuant to the provisions of 10 CFR 2.201, Public S&vice Electric and Gas Company is hereby required to submit to this off ice within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; an:l (3) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to ext:erDing the response time

  • 8906020260 890522 PDR ADOCK 05000272 Q

PDC

-*-------~

---.-..~---

  • -..,_ ________ _