ML18094A540
| ML18094A540 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/16/1989 |
| From: | Bruna S Public Service Enterprise Group |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IEB-88-003, IEB-88-3, NLR-N89121, NUDOCS 8906300020 | |
| Download: ML18094A540 (3) | |
Text
Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.. o. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 Vice President - Nuclear Operations June 16, 1989 NLR-N89121 United States Nuclear Regulatory Commission Document Control Desk Washington, DC
- 20555 Gentlemen:
RESPONSE TO NRC BULLETIN 88-03 SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 Public Service Electric and Gas Company (PSE&G) has received the subject NRC Bulletin regarding potential inadequate latch engagement in GE HFA_latching-type relays.
The information requested by.this Bulletin as it relates to Salem Unit 1 is provided in the enclosure to this letter.
Should you have any questions with regard to this transmittal, please do not hesitate to contact us.
C Mr. J. c. Stone Licensing Proj.ect Manager Ms. K. Halvey Gibson Senior Resident Inspector Sincerely, Mr. w. T. Russell, Administrator Region I Mr. K. Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality_
Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 8906300020 890616 PDR ADOCK 05000272 Q
PNU
! \\
STATE OF NEW JERSEY COUNTY OF SALEM
)
)
SS.
)
REF: RESPONSE TO NRC BULLETIN.
88-03 NLR-89121 Stanley LaBruna, being duly sworn according to law deposes and says:
I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated June 16, 1989
, concerning the Salem Generating Station, Unit No. 1, are true to the best of my knowledge, information and belief.
Subscribed and Sworn to before me
- /
/)
this
.~.
~*
day of
'*./ t~-*'"--
, 1989
- /
Notary Publ.ic of New Jersey My Commission expires on LARAINE Y. BEARD
_Notary Public of New Jersey
. My Commission Expires May 1, 1991
RESPONSE TO BULLETIN 88-03 SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 ENCLOSURE The purpose of this bulletin was to request licensees to perform inspections to ensure that all GE latching-type HFA relays installed in safety-related applications have adequate latch engagement and that those relays which fail to meet acceptance criteria be repaired or replaced.
The bulletin requested a letter of confirmation that the inspection had been completed and a summary of the number of relays inspected and any corrective actions taken.
This information is presented below as it relates to_ Salem Unit 1.
RESPONSE
The NRC Bulletin 88-03 GE HFA latching-type relay inspection for Salem Unit 1 was performed in May 1989 during the Eighth Refueling Outage.
Documentation reviews and field examination revealed twent:y-one (21) HFA latching-type relays, seven in each of the three emergency diesel generator control cabinets.
The relays all have the Model No. 12HFA54H187H.
All of these relays were checked in accordance with a special test procedure (T-246) written to address those criteria noted in the Actions Requested portion of the NRC Bulletin 88-03.
The results of the examinations of all the relays were found to be satisfactory.
The Procedure T-246 data sheets are available onsite for inspection, if requested.
Until alternatively designed relays are made available which remedy the problem noted in NRC Bulletin 88-03, spare GE HFA latching-type relays of the model noted above have been ordered for replacement-in-kind applications, if replacement should be necessary in the future.
These spare relays will be inspected in accordance with the criteria of NRC Bulletin 88-03 upon receipt.