- 05000272/LER-1988-016-02, :on 880909,twenty-nine Air Balance Model 119 Dampers in Units 1 & 2 Fire Areas Not Surveilled as Required by Tech Spec.Caused by Inadequate Administrative Controls. Engineers Counseled & Requirements Reviewed + (ML18093B197)
- ML18093B198 + (ML18093B198)
- ML18093B199 + (ML18093B199)
- ML18093B200 + (ML18093B200)
- ML18093B201 + (ML18093B201)
- ML18093B202 + (ML18093B202)
- ML18093B204 + (ML18093B204)
- ML18093B205 + (ML18093B205)
- ML18093B206 + (ML18093B206)
- ML18093B207 + (ML18093B207)
- ML18093B208 + (ML18093B208)
- ML18093B209 + (ML18093B209)
- ML18093B210 + (ML18093B210)
- ML18093B212 + (ML18093B212)
- ML18093B213 + (ML18093B213)
- PNO-I-88-105, on 881011,contractor Employee Fell from Refueling Floor of Reactor Containment Into Partially Drained Reactor Cavity.Contamination Found on Employee. Individual Sent to Hosp & Decontaminated + (ML18093B215)
- ML18093B216 + (ML18093B216)
- ML18093B218 + (ML18093B218)
- 05000311/LER-1988-018-01, :on 880914,discovered That Plant Vent Tritium Grab Samples Not Taken Between 880913-15.Refueling Canal Flooded on 880913 in Support of Refueling Efforts.Caused by Inadequate Administrative Controls + (ML18093B219)
- 05000272/LER-1987-012-01, :on 870930,Tech Spec 3.3.1.1 Action 6 Entered When Preventive Maint Performed on Group 1G Bus Reactor Coolant Pump Undervoltage Trip Relay.Caused by Inadequate Procedures.Relay Dept Manual Revised + (ML18093B220)
- ML18093B221 + (ML18093B221)
- ML18093B222 + (ML18093B222)
- ML18093B223 + (ML18093B223)
- ML18093B225 + (ML18093B225)
- IR 05000272/1988017 + (ML18093B227)
- ML18093B228 + (ML18093B228)
- ML18093B230 + (ML18093B230)
- PNO-I-88-108, on 881018,hot Particle Identified on Worker Leg Above Ankle.Working Wearing Bubble Suit.Particle Was Fuel Fragment W/Total Activity Between 10 & 80 Rems to Skin. Steam Generator Tube Plugging Work Completed + (ML18093B231)
- 05000311/LER-1988-019-01, :on 881005,several Tubes Found Degraded in Steam Generator Tubes 22 & 24.Caused by Steam Generator Design.Emergency License Amend Issued to Modify Steam Generator Tube Sampling Method + (ML18093B232)
- 05000272/LER-1988-017-02, :on 880919,Steam Flow Channels I & II for 12 & 14 Steam Generators Declared Inoperable.Channels Were Reading -5% Low.Investigation of Root Cause Continuing.Steam Flow Channels Recalibr + (ML18093B233)
- ML18093B234 + (ML18093B234)
- PMNS20180374, April 2018, Reactor Oversight Process, Monthly Public Meeting + (ML18093B235)
- ML18093B236 + (ML18093B236)
- ML18093B238 + (ML18093B238)
- ML18093B239 + (ML18093B239)
- ML18093B240 + (ML18093B240)
- ML18093B241 + (ML18093B241)
- ML18093B243 + (ML18093B243)
- ML18093B245 + (ML18093B245)
- ML18093B247 + (ML18093B247)
- ML18093B248 + (ML18093B248)
- IR 05000272/1988021 + (ML18093B250)
- ML18093B251 + (ML18093B251)
- ML18093B252 + (ML18093B252)
- ML18093B253 + (ML18093B253)
- ML18093B256 + (ML18093B256)
- ML18093B257 + (ML18093B257)