ENCLOSURE 3 REVISED PAGES -
UNIT NO. 2 TECHNICAL SPECIFICATIONS
,- 881o17ot 7t aa10101 PDR ADOCK 050003 1 p
PNU
ALTERNATE INSPECTION SAMPLING PLAN FOR SALEM UNIT 2 FOURTH REFUELING OUTAGE During the Salem Unit 2 Fourth Refueling Outage, indications associated with wall degradation were detected on the tubing of the No. 22 and No. 24 Steam Generators.
The condition was established as occurring on the inside diameter of the Row 1 tubes in the tangential region of the u-bend.
The following alternate action may be taken in place of that required by Technical Specification Table 4.4-2 when the results of the initial sample requires that an additional sample or samples must be inspected and the condition for which the added inspection is required is limited to the Row 1 tubes.
When examination results fall into a C-2 or C-3 Supplemental Sample Category, pursuant to Technical Specification Table 4.4-2 as a result of Row 1 and/or Row 2 u-bend defective or degraded tubes, additional samples may be limited to Rows 1 and 2.
The results of the examination of the Row 1 and Row 2 tubes will be exempt from the additional sampling requirements of Technical Specification Table 4.4-2.
This change applies to only those steam generator eddy current inspections performed during the Salem Unit 2 Fourth Refueling Outage.
SALEM - UNIT 2 3/4-15a
_,..~.;:-
FoR~~-.:..* -'"::._. ::..* _*,_*_.~.;.* :'-.~:"~:,..;:~'-=~'-.z:..~~-1:....~:'"'f:~~'"~~~""'>'"* ~-f_;)_;~~ -.,,~_;:;,~"",i""f...,~~_;~;,""
.. ~,,.:~-_,_. _* _* ~--'-.-'-.,;,~,.,...,,..,.,._,_ __
- r'.~~:~;~i!~db0t:>:~2:~:.0:~1ii~~.;:*
- ~.~:. _:
2406*
..J