PLANT SYSTEMS 3/4.7.9 SNUBBERS LIM IT ING CONDIT ION FOR OPERATION 3.7.9 All snubbers shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3 and 4.

(MOCES 5 and 6 for snubbers located on systems required OPERABLE in those MODES).

ACTION:

With one or more snubbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9c on the supported component or declare the supported system inoperable and follow appropriate ACTION statement for that system.

SURVEILLANCE REQUIREMENTS 4.7.9 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the requirements of Specification 4.0.5.

a.

Visual Inspection An. inservice visual inspection of all snubbers shall be performed in accordance with the following schedule for each type.

As used in this specification, type of snubber shall mean snubber of the same design and manufacturer, irrespective of capacity.

No. Inoperable Snubbers of Each Type per Inspection Period 0

1 2

3' 4 5' 6' 7 8 or more Subsequent Inspection Period*#

18 months + 25%

12 months + 25%

6 months + 25%

124 days + 25%

62 days + 25%

31 days +/- 25%

Snubbers are categorized as accessible and inaccessible during reactor operation.

Each group (accessible and inaccessible) may be inspected independently in accordance ~ith the above schedule.

  • The inspection interval shall not be lengthened more than one step at a time.
  1. The provisions of Specification 4.0.2 are not applicable.

SALEM - UNIT 1 3/4 7-28 8810120287 881005 PDR ADOCK 05000272 P

PDC

ADMINISTRATIVE C.ROLS

~

  • 6:10.2 The following records shall be retained for tne duration of the Unit Operating License:
a.

Records and drawing changes reflecting unit design modifications made to systems and equipment described in the Final Safety Analysis Report.

b.

Records of new and irradiated fuel inventory, fuel transfers and assembly burnup histories.

c.

Records of radiation exposure for all individuals entering radiation control areas.

d.

Records of gaseous and liquid radioactive material released to the environs.

e.

Records of transient or operational cycles for those facility components identified in Table 5.7-1.

f.

Records of reactor tests and experiments.

g.

Records of training and qualification for current members of the plant staff.

h.

Records of in-service inspections performed pursuant to these Technical Specifications.

i.

Records of Quality Assurance activities require by the QA Manual.

j.

Records of reviews performed for changes made to procedures or equipment or reviews of tests and experiments pursuant to 10 CFR 50.59.

k.

Records of meetings of the SORC and the NRB.

1.

Records for Environmental Qualification which are covered under the provisions of Paragraph 2.C(7) and 2.C(8) of Facility Operating License DPR-75.

m.

Records of the service lives of all hydraulic and mechanical snubbers including the date at which the service life commences and associated installation and maintenance records.

n.

Records of secondary water sampling and water quality.

o.

Records of analyses required by the radiological environmental monitoring program which would permit evaluation of the accuracy of the analysis at a later date. This should include procedures effective at specified times and QA records showing that these procedures were followed.

SALEM - UNIT 1 6-22

I I

I_

PLANT SYSTEMS BASES 3/4.7.9 SNUBBERS All snubbers are required OPERABLE to ensure that the structural integrity of the reactor coolant system and all other safety related systems is maintained during and following a seismic or other event initiating dynamic loads.

Snubbers excluded from this inspection program are those installed on nonsafety related systems and then only if their failure or failure of the system on which they were installed, would have no adverse effect on any safety related system.

A list "of individual snubbers required to be operable per the technical specifications with detailed information of snubber location and size and of system affected shall be available at the plant in accordance with Section 50.71(c) of 10 CFR Part 50.

The accessibility of each snubber shall be determined and approved by the Station Operations Review Committee.

The determination shall be based on the existing radiation levels and the expected time to perform a visual inspection in each snubber location as well as other factors associated with accessibility during plant operations (e.g.,

temperature, atmosphere, location, etc.) and the recommendations of Regulatory Guide 8.8 and 8.10.

The addition or deletion of any snubber shall be made in accordance with Section 50.59 of 10 CFR Part 50.

The visual inspection frequency is based upon maintaining a constant level of snubber protection to systems.

Therefore, the required inspection interval varies inversely with the observed snubber failures and is determined by the number of inoperable snubbers found during an inspection.

Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection.

However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25%) may not be used to lengthen the required inspection interval.

Any inspection whose results require a shorter inspection interval will override the previous schedule.

When the cause of the rejection of a snubber is clearly established and remedied for that snubber and for any other snubbers that may be generically susceptible, and verified by inservice functional testing, that snubber may be exempted from being counted as inoperable.

Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber by visual inspection or are similarly located or exposed to the same environmental conditions, such as temperature, radiation, and vibration..

When a snubber is found inoperable, an engineering evaluation is performed, in addition to the determination of the snubber mode of failure, in order to determine if any safety-related component or system has been adversely affected by the inoperability of the snubber.

The engineering evaluation shall determine whether or not the snubber mode of failure has imparted a significant effect or degradation on the supported component or system.

SALEM - UNIT 1 B 3/4 7-6

PLANT SYSTEMS

. BASES SNUBBERS (Continued)

To provide assurance of snubber functional reliability, a representative sample of the installed snubbers will be functionally tested during plant shutdowns at 18-month intervals. Observed failures of these sample snubbers shall require functional testing of additional units.

Permanent or other exemptions from the surveillance program for individual snubbers may be granted by the Commission if a justifiable basis for exemption is presented and, if applicable, snubber life destructive testing was performed to qualify the snubbers for the applicable design conditions at either the completion of their fabrication or at a subsequent date.

Snubbers so exempted shall be listed in the list of individual snubbers indicating the extent of the exemptions.

Hydraulic snubbers and mechanical snubbers may each be treated as a different entity for the above surveillance program.

The service life of a snubber is evaluated via manufacturer input and information through consideration of the snubber service conditions and associated installation and maintenance records (newly installed snubber, seal replaced, spring replaced, in high radiation area, in high temperature area, etc... ).

The requirement to monitor the snubber service life is included to ensure that the snubbers periodically undergo a performance evaluation in view of their age and operating conditions. These records will provide statistical bases for future consideration of snubber service life. The requirements for the maintenance of records and the snubber service life review are not intended to affect plant operation.

3/4.7.10 FIRE SUPPRESSION SYSTEMS The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located.

The fire suppression system consists of the water system, spray, and/or sprinklers, C02, and fire hose stations.

The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.

In the event that portions of the fire suppression system are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service.

In the event the fire suppression water system becomes inoperable, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant.

The requirement for a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> report to the Commission provides for prompt evaluation of the acceptability of the corrective measures to provide adequate fire suppression capability for the continued protection of the nuclear plant.

SALEM - UNIT 1 B 3/4 7-7

PLANT SYSTEMS BASES 3/4.7.11 PENETRATION FIRE BARRIERS The functional integrity of the penetration fire barriers ensures that fires will be confined or adequately retarded from spreading to adjavent portions of the facility. This design feature minimizes the possibility of a single fire rapidly involving several areas of the facility prior to detection and extinguishment.

The penetration fire barriers are a passive element in the facility fire protection program and are subject to periodic inspections.

During periods of time when the barriers are not functional, a continuous fire watch is required to be maintained in the vicinity of the affected barrier until the barrier is restored to functional status.

SALEM - UNIT 1 B 3/4 7-8

PLANT SYSTEMS 3/4.7.9 SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.9 All snubbers shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3 and 4.

(MODES 5 and 6 for snubbers located on systems required OPERAS LE in those MO DES).

ACT ION:

With one or more snubbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9c on the supported component or declare the supported system inoperable and follow appropriate ACTION statement for that system.

SURVEILLANCE REQUIREMENTS 4.7.9 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the requirements of Specification 4.0.5.

a.

Visual Inspection An inservice visual inspection of all snubbers shall be performed in accordance with the following schedule for each type.

As used in this specification, type of snubber shall mean snubber of the same design and manufacturer, irrespective of capacity.

No. Inoperable Snubbers of Each Type per Inspection Period 0

1 2

3, 4 5' 6' 7 8 or more Subsequent Inspection Period*#

18 months + 25%

12 months + 25%

6 months + 25%

124 days + 25%

62 days + 25%

31 days I 25%

Snubbers are categorized as accessible and inaccessible during reactor operation~ Each group (accessible and inaccessible) may be inspected independently in accordance with the above schedule.

  • The inspection interval shall not be lengthened more than one step at a time.
  1. The provisions of Specification 4.0.2 are not applicable.

SALEM - UNIT 2 3/4 7-23

ADMINISTRATIVE C'9fOLS

-6:10.2 The following records shall be retained for the duration of the Unit Operating License:

a.

Records and drawing changes reflecting unit design modifications made to systems and equipment described in the Final Safety Analysis Report.

b.

Records of new and irradiated fuel inventory, fuel transfers and assembly burnup histories.

c.

Records of radiation exposure for all individuals entering radiation control areas.

d.

Records of gaseous and liquid radioactive material released to the environs.

e.

Records of transient or operational cycles for those facility components identified in Table 5.7-1.

f.

Records of reactor tests and experiments.

g.

Records of training and qualification for current members of the plant staff.

h.

Records of in-service inspections performed pursuant to these Technical Specifications.

i.

Records of Quality Assurance activities require by the QA Manual.

j.

Records of reviews performed for changes made to procedures or equipment or reviews of tests and experiments pursuant to 10 CFR 50.59.

k.

Records of meetings of the SORC and the NRB.

1.

Records for Environmental Qualification which are covered under the provisions of Paragraph 2.C(7) and 2.C(8) of Facility Operating License DPR-75.

m.

Records of the service lives of all hydraulic and mechanical snubbers including the date at which the service life commences and associated installation and maintenance records.

n.

Records of secondary water sampling and water quality.

o.

Records of analyses required by the radiological environmental monitoring program which would permit evaluation of the accuracy of the analysis at a later date. This should include procedures effective at specified times and QA records showing that these procedures were followed.

SALEM - UN IT 2 6-22

' I

1 1

I I

PLANT SYSTEMS BASES 3/4.7.9 SNUBBERS All snubbers are required OPERABLE to ensure that the structural integrity of the reactor coolant system and all other safety related systems is maintained during and following a seismic or other event initiating dynamic loads.

Snubbers excluded from this inspection program are those installed on nonsafety related systems and then only if their failure or failure of the system on which they were installed, would have no adverse effect on any safety-related system.

A list of individual snubbers required to be operable per the technical specifications with detailed information of snubber location and size and of system affected shall be available at the plant in accordance with Section 50.7l(c) of 10 CFR Part 50.

The accessibility of each snubber shall be determined and approved by the Station Operations Review Committee.

The determination shall be based on the existing radiation levels and the expected time to perform a visual inspection in each snubber location as well as other factors associated with accessibility during plant operations (e.g.,

temperature, atmosphere, location, etc.) and the recommendations of Regulatory Guide 8.8 and 8.10.

The addition or deletion of any snubber shall be made in accordance with Section 50.59 of 10 CFR Part 50.

The visual inspection frequency is based upon maintaining a constant level of snubber protection to systems.

Therefore, the required inspection interval varies inversely with the observed snubber failures and is determined by the number of inoperable snubbers found during an inspection.

Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection.

However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25%) may not be used to lengthen the required inspection interval.

Any inspection whose results require a shorter inspection interval will override the previous schedule.

When the cause of the rejection of a snubber is clearly established and remedied for that snubber and for any other snubbers that may be generically susceptible, and verified by inservice functional testing, that snubber may be exempted from being counted as inoperable.

Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to*rejection of the snubber by visual inspection or are similarly located or exposed to the same environmental conditions, such as temperature, radiation, and vibration.

When a snubber is found inoperable, an engineering evaluation is performed, in addition to the determination of the snubber mode of failure, in order to determine if any safety-related component or system has been adversely affected by the inoperability of the snubber.

The engineering evaluation shall determine whether or not the snubber mode of failure has imparted a significant effect or degradation on the supported component or system.

SALEM - UNIT 2 B 3/4 7-6

PLANT SYSTEMS BASES SNUBBERS (Continued)

To provide assurance of snubber functional reliability, a representative sample of the installed snubbers will be functionally tested during plant shutdowns at 18-month intervals. Observed failures of these sample snubbers shall require functional testing of additional units.

Permanent or other exemptions from the surveillance program for individual snubbers may be granted by the Commission, if a justifiable basis for exemption is presented and, if applicable, snubber life destructive testing was performed to qualify the snubbers for the applicable design conditions at either the completion of their fabrication or at a subsequent date.

Snubbers so exempted shall be listed in the list of individual snubbers indicating the extent of the exemptions.

Hydraulic snubbers and mechanical snubbers may each be treated as a different entity for the above surveillance program.

The service life of a snubber is evaluated via manufacturer input and information through consideration of the snubber service conditions and associated installation and maintenance records (newly installed snubber, seal replaced, spring replaced, in high radiation area, in high temperature area, etc... ).

The requirement to monitor the snubber service life is included to ensure that the snubbers periodically undergo a performance evaluation in view of their age and operating conditions. These records will provide statistical bases for future consideration of snubber service life. The requirements for the maintenance of records and the snubber service life review are not intended to affect plant operation.

3/4.7.10 FIRE SUPPRESSION SYSTEMS The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located.

The fire suppression system consists of the water system, spray and/or sprinklers, C02, and fire hose stations.

The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.

In the event that portions of the fire suppression system are inoperable, alternate backup fire-fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service.

When the inoperable fire-fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression.

SALEM - UNIT 2 B 3/4 7-7

PLANT SYSTEMS B'ASES 3/4.7.10 FIRE SUPPRESSION SYSTEMS (Continued)

In the event the fire suppression water system becomes inoperable, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant.

The requirement for a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> report to the Commission provides for prompt evaluation of the acceptability of the corrective measures to provide adequate fire suppression capability for the continued protection of the nuclear plant.

3/4.7.11 PENETRATION FIRE BARRIERS The OPERABILITY of the penetration fire barriers ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility.

This design feature minimizes the possibility of a single fire rapidly involving several areas of the facility prior to detection and extinguishment.

The penetration fire barriers are a passive element in the facility fire protection program and are subject to periodic inspections.

Fire barrier penetrations, including cable penetration barriers, fire doors and dampers are considered OPERABLE when the visually observed condition is the same as the as-designed condition.

For those fire barrier penetrations that are not in the as-designed condition, an evaluation shall be performed to show that the modification has not degraded the fire rating of the fire barrier penetration.

During periods of time when a barrier is inoperable, either 1) a continuous fire watch is required to be maintained in the vicinity of the affected barrier, or 2) the fire detectors on at least one side of the affected barrier must be verified OPERABLE and an hourly fire watch patrol established, until the barrier is restored to OPERABLE status.

SALEM - UN IT 2 B 3/4 7-8