Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18045A376 + (ML18045A376)
- ML18045A378 + (ML18045A378)
- ND-18-0094, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.03.01 (Index Number 68) + (ML18045A380)
- ML18045A381 + (ML18045A381)
- ML18045A382 + (ML18045A382)
- ML18045A383 + (ML18045A383)
- ML18045A384 + (ML18045A384)
- ML18045A385 + (ML18045A385)
- ML18045A386 + (ML18045A386)
- ML18045A387 + (ML18045A387)
- ML18045A388 + (ML18045A388)
- ML18045A391 + (ML18045A391)
- ML18045A392 + (ML18045A392)
- ML18045A393 + (ML18045A393)
- ML18045A394 + (ML18045A394)
- ML18045A395 + (ML18045A395)
- ML18045A396 + (ML18045A396)
- ML18045A397 + (ML18045A397)
- ML18045A401 + (ML18045A401)
- ML18045A403 + (ML18045A403)
- ML18045A404 + (ML18045A404)
- ML18045A410 + (ML18045A410)
- ML18045A412 + (ML18045A412)
- ML18045A413 + (ML18045A413)
- ML18045A414 + (ML18045A414)
- ML18045A415 + (ML18045A415)
- ML18045A416 + (ML18045A416)
- 05000255/LER-1980-020, Forwards LER 80-020/01T-0 + (ML18045A417)
- ML18045A420 + (ML18045A420)
- 05000255/LER-1980-020-01, /01T-0:on 800711,control Rod Drive Mechanism Failed to Operate Properly,Resulting in Rod Being Misaligned for Approx Five Minutes.Caused by Dirty Control Relay Armatures & Contractor Interlock Which Resulted in Sticking + (ML18045A421)
- ML18045A422 + (ML18045A422)
- ML18045A443 + (ML18045A443)
- ML18045A445 + (ML18045A445)
- ML18045A446 + (ML18045A446)
- ML18045A447 + (ML18045A447)
- ML18045A448 + (ML18045A448)
- ML18045A450 + (ML18045A450)
- ML18045A451 + (ML18045A451)
- ML18045A452 + (ML18045A452)
- ML18045A453 + (ML18045A453)
- ML18045A455 + (ML18045A455)
- ML18045A457 + (ML18045A457)
- ML18045A458 + (ML18045A458)
- ML18045A464 + (ML18045A464)
- ML18045A466 + (ML18045A466)
- ML18045A468 + (ML18045A468)
- 05000255/LER-1980-022, Forwards LER 80-022/03L-0 + (ML18045A470)
- ML18045A471 + (ML18045A471)
- 05000255/LER-1980-022-03, /03L-0:on 800710,2-h After Reactor Criticality, Channel NI-03 Not Declared Operable Prior to Reactor Startup.Caused by Failure of Shift Supervisor to Check Control Mechanism + (ML18045A472)
- ML18045A474 + (ML18045A474)
- ML18045A477 + (ML18045A477)