ML18045A455

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-255/80-08 on 800505-09,12-16 & 19-30 & Notice of Violation
ML18045A455
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/01/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18045A456 List:
References
NUDOCS 8008070537
Download: ML18045A455 (2)


See also: IR 05000255/1980008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

Docket No. 50-255

Consumers Power Company

ATTN:

Mr. R. B. DeWitt

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, Mi

49201

Gentlemen:

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

  • JUL

1 1980

CENTRAL FILES

This refers to the inspection conducted by Messrs. B .. L. Jorgensen and

J~ K. Heller of this office during May,

1~80; of activities at the Pali-

sades Nuclear Generating Plant authorized by NRC Provisional Operating

License No. DPR-20 and to the discussion of our findings with

Mr.J. G. Lewis and others of your staff at the conclusion of the inspec-

tion.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted of a

selective examination.of procedures and representative records, observa-

tion*s, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix

A.

While the item of noncompliance associated with "operating with suffi-

cient instrumentation" did not have serious direct s*afety implications,

the fact that members of your staff, for a sustained period of time,

overlooked the technical specifications pertaining to this matter, is of

great concern to this office.

We will be most interested in the correc-

tive actions taken to strengthen your plant review function to preclude a

repeat of this type of oversight.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office within 20

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance: (1) corrective action

taken and the results achieved; (2) corrective action to be taken to

avoid further noncompliance; and (3) the date when full compliance will

be achieved.

~

/ v

' *

Consumers Power Company

-2-

1 1980

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

Public Document Room, except as follows.

If the enclosures contain

information that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The

application must include a full statement of the reasons for which the

information is considered proprietary, and should be prepared so that

proprietary information identified in the application is contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Enclosure:

IE Inspection

Report No. 50-255/80-08

cc w/encl:

Mr. D. P. Hoffman, Nuclear

Licensing Administrator

Mr. J. G. Lewis, Manager

Central Files

Reproduction Units NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan

Public Service Commission

Myron M. Cherry, Chicago

RII\\

Jorg~~en/ cs

6/19/80

R~j

HeiJW'r

Sincerely,

James G. Keppler

Director

  • }!;}£

~lius

J