CO-SI Offlc*: 212 w-Michigan Avenue, Jeck1an, Mlchlgen 48201
- 1517) 788-01550 July 23, 1980
\\-
Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief Operating Reactors Branch No 5 US Nuclear Regulatory Commission Washington, DC 20555 DOCKETS 50-155 AND 50-255 - LICENSES DPR-6 AND DPR BIG ROCK POINT AND.PALISADES PLANTS*. - RESPONSE TO EVACUATION TIME ESTIMATES - SITE EMERGENCY PLAN
):
Consumers Power Company was requested, by, NRC letter dated November 29, 1979,
- to give information regarding estimates for evacuation of various areas around our Palisades and BigRock Point Nuclear Plants.
Five copies of the Palisades and Big Rock Point evacuation time estimates, F!repared by HMM Associates, have been sent to the NRC staff.
The results for the Palisades Plant show that evacuation clear time for the 0-10 mile area is approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for both summer and winter conditions.
At our Big Rock Point Plant, the evacuation clear t.ime for the 0-5 mi_le area is approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> in the summer and approximately 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in the winter.
(Reference Consumers Power April 24, 1980 and NRC June 13, 1980 letters for basis of 5-mile Emergency Planning Zone.)
David P Hoffman Nuclear Licensing Administrator CC JGKeppler, USNRC NRC Resident Inspector-Palisades NRC Resident Inspector-Big Rock Point soo7dos?D *
~