Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18011A464 + (ML18011A464)
- IR 05000400/1994007 + (ML18011A466)
- IR 05000400/1994006 + (ML18011A467)
- 05000400/LER-1994-001-03, :on 940502,discovered That Slave Relay Test for K623 Did Not Verify Actuation of RCDT Pumps Discharge Valve 1ED-121.Caused by Procedural Deficiency in OST-1044. Procedure OST-1044 Has Been Revised + (ML18011A468)
- ML18011A474 + (ML18011A474)
- HNP-94-050, Forwards Response to NRC 940513 Request for Verification of Info Contained in NRCs Reactor Vessel Integrity Database Relating to Shnpp PTS & Use Parameters,Per GL 92-01,Rev 1. Corrected Page 7-14 of Bw Rept BAW-2154,dtd Mar 1992 Encl + (ML18011A475)
- ML18011A476 + (ML18011A476)
- ML18011A477 + (ML18011A477)
- HNP-94-046, Submits Info Required Per 10CFR50.46(a)(3)(ii) for Shnpp Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models.Margin Utilization Tables for Large Break LOCA & SBLOCA Analyses Encl + (ML18011A479)
- HNP-94-049, Monthly Operating Rept for May 1994 for Shearon Harris Nuclear Power Plant + (ML18011A480)
- ML18011A482 + (ML18011A482)
- ML18011A483 + (ML18011A483)
- ML18011A484 + (ML18011A484)
- ML18011A486 + (ML18011A486)
- ML18011A489 + (ML18011A489)
- HNP-94-052, Advises That Util Scheduled Emergency Preparedness Exercise for Shnpp for 940913.Proposed 940913 Exercise Objectives Encl + (ML18011A491)
- HNP-94-053, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-10.Corrective Actions:Review of Reg Guide 1.33,App A,Paragraph 3 Made to Check for Any Other Sys That Do Not Have Fill & Vent Procedure Steps + (ML18011A492)
- ML18011A494 + (ML18011A494)
- ML18011A497 + (ML18011A497)
- HNP-94-057, Monthly Operating Rept for June 1994 for Shearon Harris Nuclear Power Plant + (ML18011A500)
- HNP-94-056, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-12.Corrective Action:Acceptance Testing Performed Was Reviewed & Was Considered to Be Adequate + (ML18011A501)
- ML18011A502 + (ML18011A502)
- ML18011A503 + (ML18011A503)
- ML18011A504 + (ML18011A504)
- HNP-94-043, Informs NRC That CP&L Intends to Revise Shnpp Approach to Environmental Qualification of safety-related Equipment Located in Mild Environments + (ML18011A505)
- ML18011A506 + (ML18011A506)
- ML18011A507 + (ML18011A507)
- ML18011A508 + (ML18011A508)
- ML18011A509 + (ML18011A509)
- ML18011A510 + (ML18011A510)
- ML18011A512 + (ML18011A512)
- PMNS20180029, Pre-Submittal Meeting with Tennessee Valley Authority on a Future License Amendment Request for Watts Bar Nuclear Plant, Unit 2 + (ML18011A513)
- ML18011A514 + (ML18011A514)
- ML18011A516 + (ML18011A516)
- ML18011A525 + (ML18011A525)
- ML18011A526 + (ML18011A526)
- ML18011A528 + (ML18011A528)
- ML18011A529 + (ML18011A529)
- ML18011A530 + (ML18011A530)
- IR 05000400/1994010 + (ML18011A531)
- ML18011A532 + (ML18011A532)
- ML18011A534 + (ML18011A534)
- ML18011A535 + (ML18011A535)
- ML18011A537 + (ML18011A537)
- ML18011A538 + (ML18011A538)
- ML18011A539 + (ML18011A539)
- 05000400/LER-1994-017, :on 940711,automatic Isolation of RHR Sys Shutdown Cooling Suction Outboard Containment Isolation Valve Occurred Due to Inadequate Work Order.Work Order Process for I&C Work Orders Will Be Reviewed + (ML18011A540)
- HNP-94-062, Cycle 6 Startup Test Rept. W/ + (ML18011A541)
- ML18011A542 + (ML18011A542)
- ML18011A543 + (ML18011A543)
- ML18011A545 + (ML18011A545)