Summary of 940707 Meeting W/Util in Rockville,Md to Discuss Future Submittals Planned by Utils Responses to Generic Communications & NRC Concerns.Meeting Attendees Listed in Encl 1
ML18011A506
Person / Time
Site: Harris 
Issue date: 07/19/1994
From: Le N
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9407220171
Download: ML18011A506 (39)


Text

Docket No.

50-400 July 19,1994 LICENSEE:

Carolina Power

& Light Company FACILITY:

Shearon Harris Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF MEETING HELD ON JULY 7,

1994, WITH CAROLINA POWER

& LIGHT COMPANY A meeting was held with Carolina Power

& Light Company (CPSL),

on July 7,

1994, in Rockville, Maryland.

The purpose of the meeting was to discuss future submit'tais planned by CP&L, the status of the NRC's review of previous submittals, responses to generic communications, NRC concerns, and other general coordination of licensing activities.

Enclosure 1 is a list of meeting attendees.

Enclosure 2 contains the hand-out material (18-month Regulatory Schedule),

which describes current and planned activities that were discussed at the meeting.

Enclosure:

1.

List of Attendees 2.

Meeting Handout Material cc w/enclosures:

See next page DISTRIBUTION:

See attached page Original Signed by:

Ngoc B. Le, Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation OFC NAME DATE LA:P PAnde j/ /g 94 PM PDII-1 NLe rst PD P

I~1 DMa thews 94 OFFICIAL RECORD COPY DOCUMENT NAME:

G:iHARRISiHA940707.MTS r

9407220171 940719 D

PDR ADOCK 05000400 P

PDR i

\\

DISTRIBUTION LIST FOR HEETING SUNMARY OF 7 7 94:

1 W. Russell/F. Hiraglia R. Zimmerman S. Varga G. Lainas D. Hatthews P. Anderson OGC E. Jordan ACRS (10) w Enclosures 1

& 2 Docket File NRC

& Local PDRs PDII-1 R/F N.

Le E. Herschoff, Region 11

I

0 Docket No.

50-400 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 t

July 19, 1994 LICENSEE:

Carolina Power 8 Light Company FACILITY:

Shearon Harris Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF MEETING HELD ON JULY 7,

1994, WITH CAROLINA POWER 8I LIGHT COMPANY A meeting was held with Carolina*Power 8 Light Company (CP8L),

on July 7, 1994, in Rockville, Maryland.

The purpose of the meeting was to discuss future submittals planned by CP8L, the status of the NRC's review of previous submittals, responses to generic communications, NRC concerns, and other general coordination of licensing activities.

Enclosure 1 is a list of meeting attendees.

Enclosure 2 is the hand-out material (18-month Regulatory Schedule),

which describes current and planned activities that were discussed at the meeting.

Enclosures:

1.

List of Attendees 2.

Meeting Handout Material cc w/enclosures:

See next page Ngoc B. Le, Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

0

'I IP g'1 (, i/g~W g q'>>

CC:

Shearon Harris Nuclear Power Plant, Unit 1

Mr. H. Ray Starling Manager Legal Department Carolina Power

& Light Company Post Office Box 1551

Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Karen E.

Long Assistant Attorney General State of North Carolina Post Office Box 629

Raleigh, North Carolina 27602 Public Service Commission State of South Carolina Post Office Drawer 11649
Columbia, South Carolina 29211 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta St.,

N.W. Suite 2900 Atlanta, Georgia 30323 Mr.

W.

R. Robinson Vice President -'arris Plant Carolina Power

& Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, MC: Zone 1

New Hill, North Carolina 27562-0165 Mr. Dayne H. Brown, Director Division of Radiation Protection N.C. Department of Environmental Commerce

& Natural Resources Post Office Box 27687

Raleigh, North Carolina 27611-7687 Mr. H.

W. Habermeyer, Jr.

Vice President Nuclear Services Department Carolina Power

& Light Company Post Office Box 1551

Raleigh, North Carolina 27602 Admiral Kinnaird R.

McKee 214 South Morris Street Oxford, Maryland 21654 Mr. Robert D. Martin 3382 Sean Way Lawrenceville, Georgia 30244 Mr. J.

W. Donahue Plant Manager - Harris Plant Carolina Power

& Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, MC:

Zone 1

New Hill, North Carolina 27562-0165

Enclosure I Jul 7

1994 Pectin with Carolina Power 8 Li ht Com an List of Attendees N.

Le R. Prunty L. Rowell NRC/NRR/PD II-I CP&L CP8(L

Enclosure 2

File:

H-X-0452. 1 To:

Mr. W. R. Robinson From:

Date:

Subject:

D. C. McCarthy July 5, 1994 SHNPP 18-Month Regulatory Agenda Attached is the June revision of the SHNPP 18-Month Regulatory Agenda for the period May 1, 1994 through October 31, 1995.

This is used as a tool by the Licensing and Regulatory Programs Unit and the NRC Project Manager in managing work items requiring interaction with NRR.

Items defined as Cost Beneficial Licensing Actions are identified by the notation "CBLA."

Ifyou should have questions about a particular item, please contact me.

DCM/Imr :

Process Description :

Bar Chart :

FACTS, Report pc:

Mr. W. H. Bateman (NRC)

Mr. R. T. Biggerstaff Mr. J. M. Collins Mr. J. W. Donahue Mr. M. R. Hamby Mr. E. M. Harris Mr. N. B. Le (NRC)

Mr. J. F. Nevill Mr. R. W. Prunty Mr. R. E. Rogan Mr. G. A. Rolfson Mr. G. A. Sinders (hnpi8moUrnr)

A%I'ACHMENT 1 18-MONTH REGULATORY AGENDA PR D

RIPTI N Items are divided into five categories (Z1, Z2, Z3, Z4, and Z5).

Categories Z1 and Z2 require some type of "NRC action" to support the plant (i.e., issue Technical Specification changes, approve relief requests, etc.).

Category Z3 items glen< require "NRC action" to support the plant (i.e., CP&L responses to Generic Letters and Bulletins, FSAR amendment submittal, etc.).

Category Z4 items (not attached) are those items already submitted to the NRC for which CP&L needs no response.

Closeout is tracked as an indication of additional NRC workload competing for resources with Z1 and Z2.

Category Z5 items are potential Technical Specification changes or submittals which are presently unscheduled.

Items which are of greatest importance to plant operations generally are grouped in Category Zl.

Items within a category are prioritized by letter designation with "A," representing the highest priority.

Priorities are established through discussions with the Manager - Regulatory Compliance.

r The "target" schedules are established through discussions with the NRC PM, recognizing plant "need dates" as well as the need to levelize demand on NRC resources.

"RD" denotes a required date to which some specific plant action is tied.

(hnp18mo)

SHNPP 18-MONTH REGULATORY SCHEDULE ATTACHMENT 2 JUNE 1994 PAGE 1

CAT PRI ISSUE 1994 1995 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT 1A/4 RCS FLOW RATE TSC CP&L SUBMITTAL

- ISSUE TSC sa 5/ll

~ aasr

~ s ~ asasa

~ a ~ aa barras 1]/))

1B/4 EDG REDUCED ACCELERATED TESTING)

SLOW START TESTING & EDG START TIME SUPPLEMENTAL SUBMITTAL ISSUE TSC aasassaa 7/8 aasaaassa 9/8 lc/4 ESFAS TRIP SETPOINTS - REVISE TO INCORPORATE UPDATED CALCS CP&L SUBMITTAL ISSUE TSC

~ rssss 7/15 ssssssraaasssaarassaassa 1/15 1D/4 EDG START TIME TSC CP&L SUBMITTAL ISSUE TSC

~ssssrss 10/1

~ sssssssasassrsasssssssa 4/1 Dates prior to 6/30/94 are actualsg Dates after 6/30/94 are forecast; RD ~ REQUIRED DATEg

~ SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE JUNE 1994 PAGE 2

CAT PRI ISSUE 1994 1995 MAY JUN JUL AUG SEP OCT NOV DEC JAN EB MAR A R MAY JUN JUL AUG SEP OCT 2A/4 CONTAINMENT VACUUM RELIEF ACTION STATEMENT (TSC 93-011)

ISSUE TSC sssassssssssa 8/4 2B/4 TSC CLARIFY CIRCUITRY REQUIRED FOR THERMAL OVERLOAD BYPASS ISSUE TSC ssssasssssassssassas 10/1 2C/4 RETS REMOVAL OF TABLES FROM TS CP&L SUBMITTAL (RESUBMIT TSC)

ISSUE TSC

~ sssssasss 7/13

~ a ~ $ $ ~ $ ~ $ $ ~ s ~ $ $ ~ $ $ $ $ ~ $ ~ s 1/13 2D/4 APPROVAL OF QA PROGRAM CHANGES CP&L REV. SUBMITTAL NRC APPROVAL amass 7/15 asaassas 9/15 2D/4 NAD FUNCTIONAL CHANGES (TSC 91-04)

CP&L REV. SUBMITTAL ISSUE TSC amass 7/15

~ sssssss 9/15 2E/4 TSC HASTE GAS DECAY TANK CURIE LIMITS CP&L SUBMITTAL NRC APPROVAL

~ ass 8/1

~ sasssssssssssssssssssss 2/1 Dates prior to 6/30/94 are actualsg Dates after 6/30/94 are forecasts RD = REQUIRED DATEg

= SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE JUNE 1994 PAGE 3

CAT PRI ISSUE 1994 1995 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR AP MAY JUN JUL AUG SEP OCT 2F/4 AREA TEMPERATURE MONITORING (TSC 92-03)

- CP&L SUBMITTAL ISSUE TSC bassa 8/1

~ ssasrssaasasassaaasssas 2/1 2G/4 TURBINE OVERSPEED PROTECTION CP&L SUBMITTAL ISSUE TSC asssss 8/1

~ Istic ~ aa ~ a ~ s ~ a ~ s ~ a ~ s ~ a ~ a 2/1 2H/4 10CFR73 EXEMPTION USE OF HAND-GEOMETRY IN LIEU OF CURRENT BADGING SYSTEM

- CP&L SUBMITTAL NRC APPROVAL

~ asasa 8/15

      • CBLA***

~ saaaa

~ ~ a ~ s ~ aaas ~ s ~ a ~ a 1/31 2I/4 OPERATION AT REDUCED POWER LEVELS WITH INOPERABLE MSSVS CP&L SUBMITTAL ISSUE TSC sasasass 8/15

~ as ~ s ~ a ~ a ~ s ~ as ~ s ~ s ~ sa ~ s ~ 2/15 2J/4

~ ssssssas

~ 9/7

      • CBLA***

~ assssassasssssaaassssrs 3/7 REACTOR TRIP SYSTEM INSTRUMENTATION (TS 3/4.3.1)

ELIMINATIONOF PRESSURE SENSOR

RESPONSE

TIME TESTING

- CP&L SUBMITTAL NRC APPROVAL 2K/4 DC ELECTRICAL POWER SYSTEM CP&L SUBMITTAL ISSUE TSC

~ssssasssasr 10/14

~ sassasssssssaasssssasss 4/14 Dates prior to 6/30/94 are actualsg Dates after 6/30/94 are forecasts RD ~ REQUIRED DATEg

= SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE JUNE 1994 PAGE 4

CAT PRI ISSUE 1994 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR 1995 R MAY JUN JUL AUG SEP OCT 2L/4 S/G TUBE SLEEVING (AWAITING GENERIC RESOLUTION BETWEEN B&W AND NRC)

SUPPIEMENTAL SUBMITTAL (RESP TO RAI)

ISSUE TSC 2/4 SUBMITTAL OF TSC PACKAGES - RFO k6

- CP&L SUBMITTAL

- NRC APPROVAL

~ aaassaasaaa 3/1

~ a ~ a ~ sasasaa

~ aa ~ assassins 9/1 Dates prior to 6/30/94 are actuals; Dates after 6/30/94 are forecasts RD ~ REQUIRED DATEg

= SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE JUNE 1994 PAGE 5

CAT PRI ISSUE 1994 1995 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT 3/4 MONTHLY OPERATIONS REPORT

- CP&L SUBMITTAL

~ s 7/15 3A/4

RESPONSE

TO NOV (50-400/94-10)

- CP&L SUBMITTAL ass 7/5 3B/4 ELIMINATIONOF MILD ENVIRONMENT EQ PROGRAM CP&L SUBMITTAI

~ ggg 7/]5 ***CBLA***

3C/4 GL 89-10:

IMPLEMENTATION OF MOV PROGRAM CP&L SUBMITTAL

~ sss 7/15 3D/4 NRC GL 89-10:

REDUCE SCOPE OF FUTURE MOV TESTING BASED ON APPLICATION OF PRA CP&L SUBMITTAL

/gag 7/15

      • CBLA***

3E/4

RESPONSE

TO NOV (50-400/94-12)

- CP&L SUBMITTAL

~ as 7/18 3F/4 EMERGENCY PLAN IMPLEMENTING PROCEDURES (PEP)

REVISIONS CP&L SUBMITTAL

~ ss ~ 7/22 Dates prior to 6/30/94 are actualsg Dates after 6/30/94 are forecast)

RD = REQUIRED DATE(

~ SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE JUNE 1994 PAGE 6

CAT PRI ISSUE 1994 1995 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT 3G/4 SUBMIT SCENARIO

& CONT-INFO (1994 EMERG EXERCISE)

CP&L SUBMITTAL

~ ass 7/29 3H/4 GL 93-04:

ROD CONTROL SYSTEM PROVIDE NOTIFICATION OF MODXFXCATXbN SCHEDULE CP&L SUBMITTAL burrs 8/I 3I/4 REQUAL.

PROGRAM INSPECTION (50-400/94-14)

(PROVIDE NRC REQUESTED MATERIALS)

- CP&L SUBMITTAL burrs 8/15 3J/4 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM DATA CP&L SUBMITTAL

~rssssss 8/29 3K/4 SUBMIT SEMI-ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT (1/1/94 - 6/30/94)

CP&L SUBMITTAL

~sssrsss 8/30 3L/4 SPECIAL NUCLEAR MATERIALS LICENSE (SEMI-ANNUAL MATERIALS STATUS REPORT)

CP&L SUBMITTAL burrs 10/28 3M/4 FSAR AMENDMENT f'45 (6 MOS POST-OUTAGE)

CP&L SUBMITTAL ssssssrsssssssssssssss ll/11 Dates prior to 6/30/94 are actualsg Dates after 6/30/94 are forecasts RD = REQUIRED DATEg

~ SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE JUNE 1994 PAGE 7

CAT PRI ISSUE 1994 1995 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR AP MAY JUN JUL AUG SEP OCT s*****a 3N/4 SUBMIT 50.59 REPORT (6 MOS.

POST-OUTAGE)

- CP&L SUBMITTAL

~ sssssaass 11/11 30/4 SUBMIT GOALS & OBJECTIVES (1995 EMERG EXERCISE)

CP&L SUBMITTAL sass 2/1 3P/4 SUBMIT ANNUAL OPERATING REPORT (1994)

CP&L SUBMITTAL sass 2/28 3Q/4 STEAM GENERATOR TUBE ISI RESULTS SPECIAL REPORT

- CP&L SUBMITTAL

~ sasss 3/15 3R/4 SUBMIT ON-SITE PROPERTY INSURANCE COVERAGE CP&L SUBMITTAL

~ ass 4/1 3S/4 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT (1994)

CP&L SUBMITTAL

~ ass 4/28 3S/4 ANNUAL ENVIRONMENTAL (NON-RADIOLOGICAL)

OPERATING REPORT (1994)

CP&L SUBMITTAL

~ ass 4/28 3T/4 PERSONNEL EXPOSURE REPORT CP&L SUBMITTAL

~ s ~ s ~ a ~ s 4/30 Dates prior to 6/30/94 are actuals; Dates after 6/30/94 are forecast; RD = REQUIRED-DATEg

= SCHEDULED OUTAGE

SHNPP 18-MONTH REGULATORY SCHEDULE JUNE 1994 PAGE 8

CAT PRI ISSUE 1994 1995 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT 3U/4 ANNUAL ECCS EVALUATION MODEL CHG REPORT (10CFR 50.46)

- CP&L SUBMITTAL

~ ases 6/9 3V/4 SUBMIT IPEEE ANALYSIS TO NRC

- CP&L SUBMITTAL

~ ass 6/15 3W/4 SUBMIT CORE OPERATING LIMITS REPORT (COLR)

CP&L SUBMITTAL 3X/4 STEAM GENERATOR TUBE PLUG 15-DAY SPECIAL REPORT (EVALUATE APPLICABILITYOF SUBMITTAL FOR RFO g6)

CP&L SUBMITTAL 3Y/4 GL 92-08:

THERMO LAG 330-1 FIRE BARRIERS CP&L SUBMITTAL

    • ISSUE RESOLUTION PENDING INDUSTRY RESOLUTION**

3Z/4'AI - BULL 92-01 SUPP 1

(INFORM NRC WHEN FIRE BARRIERS ARE ACCEPTABLE)

CP&L SUBMITTAL

    • ISSUE RESOLUTION PENDING INDUSTRY RESOLUTION**

Dates prior to 6/30/94 are actualsg Dates after 6/30/94 are forecasts RD = REQUIRED DATEg

= SCHEDULED OUTAGE

0

07/81/94 CAROLIHA POMER 6 LIGHT COMPANY S

H H P P 18 KONTH REGULATORY AGENDA - ATT ;3 FACTS 4 SITE PRI SOURCE DOCUKEHT AGEHCY UHIT HUC PRI/SCH IHD ISSUE ACTIOH 94G0124 2

SHHPP 1

NRR SITE REQUEST 04/27/94 Zih 4

SHNPP-RCS FLOM RATE TSC (REVISE SUBMITTED 5/11/94.

AMAITIHG HRC REVIEM TS 3/4;2.3 TO PROVIDE FOR CORRELATIOH OF AHD APPROVAL.

FLOM RATE TO THERNAL POMER)

(TSC 94"04) 93G0272 2

SHHPP HRR SITE REQUEST 05/04/93 Z(B 4

SHHPP TSC EDG REDUCED ACCELERATED TESTING (REF:

IKPROYED M STS)

SLUM START TESTIHG (TS 3.8.(.()

(TSC 93-07)

SUBHITTED 9/28/93.

AMAITIHG HRC REVIEM AND APPROVAL; PREHOTICED 10/27/93.

SUPPLEMENTAL INFORMATION SUBHITTED 4/5/94.

ADDITIONAL IHFORKATIOH TO BE SUBMITTED.

SUBNITTAL IH PREPARATION.

93G0219 2

SHHPP HRR NED REQUEST 03/22/93 Z1C SHHPP TSC-REVISE TS TABLE 3.3.4, ESFAS IHPUT REC'D.

TSC IH PREPARATIOH.

TRIP SETPOIHTS TO IHCORPORATE UPDATED CALCS (BASED OH MESTIHGHOUSE GUIDANCE)

(S/G MATER LEVEL TSC)

(TSC 94-85) 93G0214 2

SHHPP NRR SITE REQUEST 64/13/93 Z(D SHHPP EDG START TIKE TSC (CNAHGE START AMAITIHG HFS IHPUT.

TINE FROM 10 TO 12 SECOHDS BASED ON HEM ANALYSES) 93G0498 2

TSCR '93-011 SHNPP HRR 11/16/93 Z2A SHHPP-COHTAIHNEHT VACUUM RELIEF ACTIOH TIKE (CHANGE 4 HOUR ACTIOH TO 72 HOUR ACTIOH)

(TS 3.6.5)

SUBMITTED 2/4/94; AMAITIHG NRC REVIEM AHD APPROVAL

67/61/94 CAROLIHA POKER 6 LIGHT COMPANY S

H M P P 18 HOHTH REGULATORY AGEHDA - ATT '3 FACTS 0 SITE PRI SOURCE DOCUNEHT AGEHCY UHIT WC PRI/SCH IHD ISSUE ACTIOH 94G6667 2

ACFR 93-373 (CORR.

ACT '1)

SHNPP HRR 62/15/94 Z2B 4

SHNPP-REVISE

'(S 3.8.4.2 TO CLARIFY SUBHITTED TO HRC 3/29/94, AMAITIHG HRC CIRCUITRY REQUIRED FOR THERHAL OVERLOAD REVIEK AND APPROVAL.

BYPASS (II(IS CIRCUITRY IS HOT INTEGRAL TO THE ROTOR S(ARTER) 89G65$ 5 1

SHNPP NRR SITE REQUEST; GL 89-6$

1/3$ /89 SHHPP - RADIATIOH EFFLUEHT/EHVIROHNENTAL SUBHITTED 7/21/92; SUBHITTED REVISED TS (HRC-89-682)

HOHITORIHG (RE)(OVAL OF TABLES FRON TS)

PAGES 9/3/92.

(SEVERAL TS PGS REVISED

$ 6/29/89 Z2C TSC 87-64 (ORIG HLS-88-634 DTD 2/$ 6/88)

BY TS AHENDNEHT HO. 46).

TSC TO BE TS 3.3.3.16/3.$

$.1.1 RESUBHITTED PER MTG IIITH HRC OH 2/23/94; COHPLETE RESUBNITTAL IH ROUTIHG.

94G6225 2

SHNPP HRR Z2D SHNPP:

HUCLEAR ASSESSNEHT DEPARTHEHT IH PREPARATIOH QA PROGRAM CHANGE (REF:

92G6463)

(REF:

93G6297) 94G622S 2

SHNPP NRR Z2D SHNPP:

HUCLEAR ASSESSHENT DEPARTHEHT IH PREPARATIOH TECH. SPEC.

CHANGE (REF:

96G6318)

(REF:

93G6366) 94G6665 2

ACR 92-662 (CORR. ACT. ;2)

SHHPP HRR 62/69/94 Z2E SHNPP-KASTE GAS DECAY TANK CURIE LIHITS PURSUING RELOCATIOH OF TS PER HUREG-1431 TECH SPEC CHG (3.$ $.2.6)

07/01/14 CAROLIHA POKER 6 LIGH)'OMPANY S N N P P 18 MOHTH REGULATORY AGENDA ATT v3 FACTS 4 SITE PRI SOURCE DOCUMENT AGENCY UHIT HUC PRI/SCH IHD ISSUE ACTIOH 92G0408 2

SITE REQUEST SNNPP-AREA TEMPERATURE MOHITORIHG TSC PURSUIHG RELOCATIOH OF TS TO PLANT SNHPP 1

(INCREASE TEMP LIMIT IH STEAM TUHKEL AHD PROCEDURES PER KUREG-1431.

NRR 08/26/92 Z2F ADD AREAS OF PLAHT CURREHTLY HOT IH TS) 4 (TS 3.7.12)

(TSC 92-03) 94G6620 2

SNKPP REG BURDEH REDUCTIOH SHHPP TURBIHE OVERSPEED PROTECTIOH SNHPP 1

MASTER LIST (TS 3/4.3.4):

INCREASE SURVEILLAHCE HRR 03/15/94 22G TEST IHTERVAL FRON MOHTHLY TO QUARTERLY BASED ON NEM MESTIKGNOUSE ANALYSIS PURSUIHG RELOCATIOH OF TS TO FSAR PER KUREG-(431.

94G6127 2

SNKPP REG.

BURDEH MASTER LIST SHKPP - EXEMPTIOH TO 10CFR PART 73.55 SUPPLY NHP PHYSICAL SECURITY PLAH SNHPP TO INCORPORATE THE USE OF NAHD GEOMETRY CHANGE SUPPORTIKG EXEMPTIOH REQUEST HRR 03/15/94 Z2N IH LIEU OF CURREHT BADGIHG SYSTEM aaaCBLAxva, 94G0125 2

TS IHTERPRETATION '94-002 SNNPP OPERATIOH AT REDUCED POMER LEVELS TSI 94-02 APPROVED BY PHSC OH 5/6/94.

SNKPP 1

KITH IHOPERABLE MSSVS.

REVISE TS 3.7.1.1 AVAITIHG IHPUT FROM TECH SUPPORT.

KRR 04/27/94 Z2I TO CORRELATE X RATED POKER KITH NUMBER 4

OF IHOPERABLE MSSVS 94G0618 2

SNHPP NRR SNNPP REG BURDEH REDUCTIOH MASTER LIST 03/15/94 Z2J SNHPP REACTOR TRIP SYSTEM IHSTRUMEH-TATIOH (TS 3/4.3.1) - ELIMIHATIOHOF PRESSURE SEHSOR RESPOHSE TIME TEST FOR SELECTED SEHSORS (MCAP 13632)

~~~ CBLA ~~a AMAITIHG IKPUT PER AP-009.

SUBMITTAL KILL FOLLOM HOG LEAD PLAH SUBMITTAL.

07/e(/94 CAROLIKA POMER 6 LIGHT COHPAHY S

N H P P 18 HOHTK REGULATORY ACEKDA - ATT 03 FACTS 4 SITE PRI SOURCE DOCUMENT AGENCY UNIT HUC PRI/SCN IHD ISSUE ACTION 93C0555 2

SKHPP I

HRR SITE REQUEST 11/30/'93 22K SHHPP-TSC - DC ELECTRICAL POMER SYSTEN AMAITIHG IHPUT FROH CAP/OE.

(PROVIDES ACTIOH STATE)IEHT TO ALLOM KAVIHG BATTEAY CKARGEA OUT-OF-SERVICE) 93C0270 SKHPP I

HRR SITE REQUEST 05/04/93 Z2L 4

SKHPP TSCS/G TUBE SLEEVIHG (ALLOM TUBE SLEEVIHC AS AH ALTERHATIVE TO S/G TUBE PLUGGIHC)

(TSC 93-05)

SUBNITTED 8/20/93; PREHOTICED 9/15/93; NRCS COHCERHS " SLEEVE LEAK AT HCGUIAE.

AMAITIHG GEHERTC AESOLUTIOK BETMEEN BLI AHD HRC.

94G0(9b 2

TS 6.9.(.5 SHHPP HRR 01/12/87 Z3 SHHPP-NOHTKLY OPERATIOHS REPORT REPORT DUE FROH TECH SUPPORT-(PERFOAHAHCE EHGIHEERIHC) 94COI95 1

KRG LETTER (NRA-94-(75)

SHHPP I

HRR 06/03/94 Z3A 4

SKHPP RESPOHSE TO HOV (IR 50-400/94-10)

RESPOHSE IK ROUTIHC 94G0019 2

SKHPP REC BURDEH REDUCTION SKHPPELIllIKATIOHOF NILD ENVIROlNEHT INPUT RECEIVED.

CORRESPOHDEHCE IN SHHPP I

RASTER LIST EQUIPHEKT QUALIFICATIOH PROGRAll ROUTIHC.

HRR 03/15/94 Z3B sax CBI.A aalu

07/01/94

~

CAROl.INA POKER G LIGHT COMPANY S H H P P 18 MOHTH REGULATORY AGEHDA ATT v3 FACTS v SITE PRI SOURCE DOCUMENT AGEHCY UNIT WC PRI/SCH IHD ISSUE ACTION 93G0493 2

NLS-8'9-324 SHHPP HRR 12/27/89 Z3C 4

SHHPP-10CFR50.54(F)

COMMITMEHT IH

RESPONSE

TO GL 89 SAFETY RELATED MOTOR-OPERATED VALVE TESTIHG AHD SURVEILLANCE SEE ALSO 90G0028,90G0041,90G0025)

IMPLEMEHT MOV PROGRAM.

COMPLETE APPRO-PRIATE DESIGH BASIS REVIEMS, ANALYSES, VERIFICATIOHS, TESTS, AHD IHSPECTIOHS REQUIRED BY THE GL NITHIN 5 YEARS OR 3 REFUELIHG OUTAGES, MHICHEVER IS LATE IHPUT REC'D.

CORRESPOHDENCE IH PREP.

94G0114 2

SHNPP HRR SNHPP REG BURDEH REDUCTION MASTER LIST 63/15/94 Z3D 4

SHKPP HRC GEHERIC LETTER 89-18-'EDUCE SCOPE OF FUTURE MOTOR-OPERATED VALVE TESTIHG BASED OH APPLICATIOH OF PRA.

wax CBLA xxa IKPUT REC'D.

CORRESPONDEHCE IN PREPARATIOH.

94G0199 1

HRA-94-(85 (HRC LETTER)

SNNPP 1

HRR 06/(7/94 Z3E 4

SHNPP-RESPOND TO KOV (NRC IKSPECTIOH ANAITIHG IHPUT FROM TS, EMERG. PREP.

REPORT 50-08/94-12) - 2 VIOLATIOHS-SEVERITY LEVEL IV) 94G0201 2

EP IHPUT; CHANGES 6/23/94 SMNPP 1

NRR 06/29/94 Z3F 4

SHHPP TRANSMIT RECENT CHAHGES TO EMERGENCY PLAH IMPLEKEHTIHG PROCEDURES (PEP'S)

TO HRC MITHIH 30 DAYS OF APPROVAL TRANSMITTAL LTR. IN PREPARATIOH.

93G0307 2

10CFR50, APPEHDIX E, PART F SHNPP SUBMIT SCENARIO G CONTROLLER IHFO SUBMITTAL REQ'D 45 DAYS PRIOR TO EXERC SHNPP 1

FOR 1994 FULL SCALE EXERCISE TO HRC (EXERCISE SCHEDULED 9/13/94).

HRR 06/(4/93 Z3G 4

07/01/94 CAROLINA POMER 6 LIGHT COMPAHY S

H H P P 18 MOHTH REGULATORY AGENDA ATT v3 FACTS v SITE PRI SOURCE DOCUMENT AGENCY UHIT NIC PRI/SCH ll(D ISSUE ACTIOH 94G8197 2

HRA 94.182 CN T8-94.05.()1)

NHPP-PROVIDE SCHEDULE TO HRR OF SNNPP 1

tHHP-93-846, 90 DAY CL SP)

MODIFICATION OF ROD CONTROL SYSTEM KRR 06/(3/94 Z3H CURREHT ORDER TItlING (GL 93-84) 4 A'MAITIHG IHPUT FOR RESPOHSE TO HRC'S GL 93-84 (ROD CONTROL SYSTEM TIHIHG CHAHGE IHFO) - BASED OH REVIEH OF MESTINGHOUSE TECHNICAL BULLETIH (5/6/94) 94Ge2ee 2

HRA-94-(84 (NRC LETTER)

SHNPP 1

HRR 86/08/94 Z3I 4

SHNPPREQUALIFICATIOH PROGRAM INSPECTION (50-400/94-14)

- NRC REQUEST FOR MATERIALS A(tAITIHG IHPUT FROM TRAlttlHG.

94G0091 2

18 cFR 26.71(D)

SHNPP 1

HRR Z3J SHNPP:

SEMI-ANNUAL FITHESS FOR DUTY REPORT SUBMIT TO HRC 94G80(2 2

TS 6.9.1.4 SHHPP t(RR 03/02/94 23K 4

SHNPP SUBMIT SEMI-ANNUAL RADIOACTIVE AMAITING IHPUT FROM E6RC.

EFFLUENT RELEASE REPORT (FOR THE PERIOD 1/1/94 - 6/30/94) 94G0283 2

10 CFR 74.13 SNNPP 1

HRR 86/30/94 Z3L 4

SHHPP-SPECIAL NUCLEAR HATERIALS LICEHSE AMAITIHG COMPLETIOH OF NEXT MATERIALS (SEMIANNUAL MATERIALS STATUS REPORT)

IHVEHTORY (TS).

07/01/94 CAROLINA P01(ER 6 LIGHT COMPANY 5 j( K P P

18 MONTH RECULATORY AGENDA ATT v3 FACTS 4 SITE PRI SOURCE DOCUMENT AGENCY UNIT NK PAI/SCH IHD ISSUE ACTIOH 9380287 2

ACCOUNTABILITY SHNPP HRA 23M 4

SHNPP-UFSAR AMEHDMEHT HO. 45 SUBMIT 6 MOHTHS POST-OUTACE.

DUE DATE BASED OH SYHC"TO-CAID 5/12/94.

j 93G0457 2

10 CFR 58.59 SHNPP KRA 1e/ze/93 z3H SHNPP SUBMIT 50.59 REPORT SUBMIT 50.59 REPORT 6 MOHTHS POST-OUTAGE 94G8202 2

10CFR50, APPENDIX E, PART F SHHPP"-SUBMIT GOALS 6 OBJECTIVES SHNPP FOR 1995 FULL SCALE EXERCISE TO HRC HRR 06/38/94 Z30 4

SUBMITTAL AEQ'D 75 DAYS PRIOR TO EXERC.

(EXERCISE SCHEDULED 4/18/95).

94C00'l1 2

TS 6.9.1.2 SHHPP HRR 03/02/94 Z3P SHHPP SUBMIT AHHUAL OPERATING AEPORT FOR 1994 ANITIHC IHPUT FAOM EBRC OH MAH-AEM AHD REACTOR COOLAHT ACTIVITY SPIKES.

HHP LICEHSIHG TO PROVIDE INFO ON CHALLEHGES TO PRIMARY PORV AND SAFETY VALVES.

93G0458 2

TS 4.4.5.5.6 SHNPP KRR le/ze/13 Z3(j 4

SHNPP-SUBMIT SlEAM CEHERATOR TUBE ISI

'ESULTS SPECIAL REPORT ANITIKC IHPUT FRON ISI.

(DUE DATE MAY CHAHCE BASED OH DATE OF IKSPECTIOH).

87/81/94

~

CAROLIHA POHER 6 LIGHT COMPANY S

H H P P 18 MOHTH REGULATORY AGEHDA - ATT v3 FACTS v SITE PRI SOURCE DOCUMENT AGEHCY UNIT NJC PRI/SCH IHD ISSUE ACTIOH

'94G8133 2

SHHPP HRR 10CFR50.54(k)(3)

Z3R SNHPP:

OH-SITE PROPERTY IHSURAHCE COVERAGE PROVIDE STATEMEHT OF COVERAGE 94G0123 2

IS 6.9.1.3 SHHPP HRR 04/27/94 Z3S 4

SHNPP SUBMIT ANNUAL RADIOLOGICAL TRAHSMIT AHHUAL REPORT FOR 1994,(UPOH EHVIROHHEHTAL OPERATIHG REPORT (1994)

RECEIPT FROM E6RC).

94G8187 2

EPP 5.4.1 SNHPP XRR 10/20/93 Z35 4

SHHPP-SUBMIT AHHUAL EHVIROHMEHTAL (NON-TRANSMIT UPON RECEIPT FROM E6RC.

RADIOLOGICAL) OPERATIHG REPORT (1994) 94G8218 2

18 CFR 20.2206(B)

SHNPP 2

NRR 10/28/93 Z3T 4

SHHPP-SUBMIT AHHUAL PERSONNEL MONITORIHG REPORT 94G8198 2

10 CFR 50.46(A)(3)(il)

SHNPP 1

CQL-94-286 2/8/94 NRR ee/15/94 Z3U SHHPP SUBMIT ANHUAL ECCS EVALUATIOH MODEL CHANGE REPORT (IH ACCORDAHCE kITH 10 CFR 50.46 (A) (3) (II)

SUBMIT ANNUAL ECCS EVAL MODEL CHAHGES

87/01/94 CAROLINA POMER 6 LIGHT CONPANY S H H P P 18 NOHTH REGULATORY AGEHDA - ATT :3 FACTS 4 SITE PRI SOURCE DOCUNEHT AGEHCY UNIT HUC PRI/SCH IHD ISSUE ACTIOH 93G0039 SNNPP HRR 1

HLS-92-285 1

10/15/92 Z3V SHHPP:

SUBNIT IPEEE ANALYSIS TO HRC 94G0188 2

SNNPP 1

HRR HHP COLR FOR CYCLE 7 05/04/94 Z3N 4

SHHPP-SUBNIT CORE OPERATIHG LIHITS REPORT (COLR) FOR RFOC6 SUBNIT COLA UPOH RECEIPT FROM TECH.

SUPPORT; REQUIRES IHCORPORATIOH IHIO AHD APPROVAL OF REV TO PLP-106.

94G0186 2

TS 4.4.5.5.A SHNPP HRR 04/26/94 Z3X 4

SNHPP-SUBHIT STEAN GEHERATOR TUBE PLUG EVALUATE APPLICABILITY OF SUBNITTAL FOR

'15 DAY SPECIAL REPORT (FOR RFO v6)

RFO 6

93G0268 2

HRC-'93-0360; GL 92-08 SHHPP 1

NRR 06/15/93 Z3Y SHHPP-RESPONSE TO GENERIC LETTER 92-88 THERNO LAG 330-1 FIRE BARRIERS PROVIDE AH ASSESSNENT OF WHETHER OR NOT THE LICEHSIHG BASIS IS STILL SATISFIED.

(PEHDIHG INDUSTRY RESOLUTIOH).

93G0492 1

HRC-92-704 SHHPP 1

HRC-93-013 NRR 12/04/92 Z3Z RESPOHSE TO BULLETIH 92-01, SUP 1.,

FAILURE OF TKERNO-LAG 330 FIRE BARRIER

SYSTEN, HHP IHFORH HRC kHEH FIRE BARRIERS ARE ACCEPTABLE.

1PEHDIHG IHDUSTRY RESOLUTIOH).

August 16, 1995 Distribution

"'Docket-File, PDII-1 RF Nle EDunnington MEMORANDUMTO:

'ules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration FROM:

SUBJECT:

Office of Nuclear Reactor Regulation HITHDRAWAL OF AN DIENDMENT REQUEST <<SHEARON HARRIS NUCLEAR POMER PLANT, UNIT 1 (TAC NO. 591857)

One signed original of the Federal Regisrer Notice identified below is attached for your transmittal to the Office of the Federal Register for publication.

Additional conformed copies (, 5

) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s)

~

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):

Time for submission of Views on Antitrust matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

(Call with 30-day insert date).

Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

Notice of Availabilityof NRC Draft/Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availabilityof Safety Evaluation Report.

Notice of Issuance of Construction Permit(s).

Notice of Issuance of Facility Operating License(s) or Amendment(s).

Order.

Exemption.

Notice of Granting Exemption.-

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Under 10 CFR 2.206.

Other:

NOTICE OF HITHDRAHAL OF AN AMENDMENT REQUEST DOCKET NO'0-400 Attachment(s):

As stated

Contact:

Eileen Dunnington Telephone:g15 1490 DOCUMENT NAME: G: HARRIS/HAR91857. NIL To receive a copy of this document, indicate in tha box:

C' Copy without attachment/enclosure E

~ Copy with attachment/enclosure N'

No copy OFFICE NAME DATE

P 1

OFFICIALRECORD COPY

1V J

Jt N 4 n

')

g H

Distribution,

',j)ocket.Fi.le PDXl-1 RF E. Dunnington N. Le July 12, 1995 MEMORANDUMTO:

Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration FROM:

SUBJECT:

Office of Nuclear Reactor Regulation SHEARON HARRIS NU(XZAR POWER PLANT UNIT 1 One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication.

Additional conformed copies

(

5

) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):

Time for submission of Views on Antitru'st matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

(Call with 30-day insert date).

Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

Notice of Availabilityof NRC Draft/Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availabilityof Safety Evaluation Report.

Notice of issuance of Construction Permit(s).

Notice of Issuance of Facility Operating License(s) or Amendment(s).

Order.

Exemption.

Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Under 10 CFR 2.206.

g other:

Notice of cithdraeal or d lication for dmondment to Facilit 0 cretins DOCKET NO.

50-l,00 Attachment(s):

As stated

Contact:

Ee junnington Telephone:

DOCUMENT NAME:

To receive a copy of this document, indicate In the box:

C

~ Copy without attachment/enclosure E

~ Copy with attachment/enclosure 'N'e No copy OFFICE NAME DATE LA:PD Dunn on 7/

95 OFFICIALRECORD COPY

UI a

)

E

DISTRIBUTION:

PDII-1 R/F P. Anderson N. Le September 7, 1994 DOCKET NO.

MEMORANDUMTO:

FROM:

SUBJECT:

So-4OO Chief Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration Office of Nuclear Reactor Regulation SHEARON HARRIS NUCLEAR POMER PLANT (tac no. Yi84127)

One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication. Additional conformed copies

(

5

) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of'Partial Application for Construction Permit(s) and Facility License(s):

Time for submission of Views on Antitrust matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

(Call with 30-day insert date).

Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

Notice of Availabilityof NRC Draft/Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availabilityof Safety Evaluation Report.

Notice of Issuance of Construction Permit(s)

~

Notice of Issuance of Facility Operating-License(s) or Amendment(s).

Order.

Exemption.

+ Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Under 10 CFR 2.206.

Qp Other:

Noti'ce of wlthdrawal of amendment request Office of Nuclear Reactor Regulation Attachment(s):

As stated

Contact:

Telephone:

N. Le 504-1468 DOCUMENT NAME:

To receive a copy of this document, indicate In the box:

C

~ Copy without attachment/enclosure E; a Copy with anachment/enclosure N" a No copy OFFICE NAME DATE OFFICIALRECORD COPY

f i'

DOCKET NO.

50-400 MEMORANDUMTO:

Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration FROM:

SUBJECT:

Office of Nuclear Reactor Regulation Notice of Withdaawal of Application One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication. Additional conformed copies

(

5

) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):

Time for submission of Views on Antitrust matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

(Call with 30-day insert date).

Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

Notice of Availabilityof NRC Draft/Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availabilityof Safety Evaluation Report.

Notice of Issuance of Construction Permit(s).

Notice of Issuance of Facility Operating License(s) or Amendment(s).

Order.

Exemption.

Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Und'er 10 CFR 2.206.

X-,.Other:

O O

d I/a f

li t O O

d operating license III(achment(st:

As stated

Contact:

Telephone:

Office of Nuclear Reactor Regulation YP 'ocket File To receive a copy of this doc en n

I I

he box:

C ee Copy without attachment/enclosure "E

aa Copy with attachment/enclosure "N" ea No copy OFFICE NAME DATE OFFICIALRECORD COPY

C 1

41 4

4