ML18011A545

From kanterella
Jump to navigation Jump to search
Errata to Insp Rept 50-400/94-12
ML18011A545
Person / Time
Site: Harris 
Issue date: 06/28/1994
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18011A544 List:
References
50-400-94-12, NUDOCS 9408190121
Download: ML18011A545 (2)


See also: IR 05000400/1994012

Text

REPORT DETAILS

1.

Persons

Contacted

Licensee

Employees

  • D. Batton,

Manager,

Work Control

D. Braund,

Manager,

Security

B. Christiansen,

Manager,

Maintenance

J. Collins, Manager, Training

  • J. Dobbs,

Manager,

Outages

  • J. Donahue,

General

Manager,

Harris Plant

  • M. Hamby,

Manager,

Regulatory

Compliance

  • D. McCarthy, Manager,

Regulatory Affairs

  • J. Nevill, Manager,

Technical

Support

R. Prunty,

Manager,

Licensing

5 Regulatory

Programs

W. Robinson,

Vice President,

Harris Plant

  • W. Seyler,

Manager,

Project

Management

H. Smith,

Manager,

Radwaste

Operation

  • D. Tibbitts, Manager,

Operations

  • B. White, Manager,

Environmental

and Radiation Control

A. Williams, Manager, Shift Operations

H. Worth, Manager,

Onsite Engineering

Other licensee

employees

contacted

included office, operations,

engineering,

maintenance,

chemistry/radiation

and corporate

personnel.

  • Attended exit interview

2.

Acronyms

and initialisms used throughout this report are listed in the

last paragraph.

Operations

'a ~

Operational

Safety Verification (71707)

The plant began this inspection

period in the hot standby

condition

(Mode 3).

The plant was cooled

down to hot shutdown

(Mode 4)

on Hay 7 to repair steam leaks

from steam generator

manway covers.

On Hay 8 at ll:28 p.m. the plant was heated

back

up to hot standby.

On Hay 10 preparations

for reactor startup

were

commenced

and the reactor

was taken critical at 7:08 p.m.

Power operation

(Mode 1)

began

on Hay

12 at 8:32 a.m.

The plant

remained

in power operation for the duration of the inspection

period.

(1)

Shift Logs

and Facility Records

The inspector

reviewed records

and discussed

various entries

with operations

personnel

to verify compliance with the

Technical Specifications

(TS)

and the licensee's

administrative procedures.

The following records

were

reviewed:

shift supervisor's

log; control operator's

log;

9408190i21

940MB

PDR

ADOCK 05000400

9

PDR