ML18011A484
| ML18011A484 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/03/1994 |
| From: | Christensen H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robinson W CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18011A485 | List: |
| References | |
| NUDOCS 9406270237 | |
| Download: ML18011A484 (4) | |
See also: IR 05000400/1994010
Text
FORD I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:9406270237
DOC.DATE: 94/06/03
NOTARIZED:
NO
I ACIL:50-400 Shearon Harris Nuclear
Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATION
CHRISTENSEN,H.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
ROBINSON,W.R.
Carolina
Power'
Light Co.
DOCKET
05000400
SUBJECT:
Forwards
insp rept 50-400/94-10
on 940403-0506
& notice of
violation.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR g
ENCL g
SIZE: 91 2F
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
RECIPIENT
ID CODE/NAME
PD2-1
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
LE,N
NOTES:Application for permit renewal filed.
COPIES
LTTR ENCL
1
1
05000400
5/
F
INTERNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS2
RES/HFB
EXTERNAL: EG&G/BRYCEEJ.H.
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/PMAS/IRCB-E
D
G FILE
02
RGN2
FILE
01
NRC
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
JUN -3
J994
Docket No.:
50-400
License No.:
Carolina
Power
and Light Company
ATTN: Mr.
W.
R. Robinson
Vice President
- Harris Plant
Carolina
Power
and Light Company
Shearon
Harris Nuclear
Power Plant
P. 0.
Box 165
Mail Code:
Zone
1
New Hill, NC 27562-0165
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NO. 50-400/94-10)
. This refers to the inspection
conducted
by J.
Tedrow of this office on
April 3 - May 6,
1994.
The inspection
included
a review of activities
authorized for your Harris facility.
At the conclusion of the inspection,
the
findings were discussed
with those
members of your staff identified in the
enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
In addition, the enclosed
Inspection
Report identifies
activities that violate
NRC requirements
that will not be subject to
enforcement
action because
the licensee's
efforts in identifying and/or
correcting the violation meet the criteria specified in Section VII.B of the
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should
document the specific actions taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790, of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub.
L. No. 96.511.
9406270237
940603
ADOCK 05000400
Q
PDR,
'i
JUN -8 Ig94
Carolina
Power
and Light Company
2
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Original signed
by:
Floyd S. Cantrell/for
Harold 0. Christensen,
Acting Chief
Reactor Projects
Branch
1
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
Nr.
W. S. Orser
Executive Vice President
Carolina
Power
and Light Company
Shearon Harris Nuclear
Power Plant
P.
O.
Box 1551
- Hail Code
CPB
12
Raleigh,
NC
27602-1551
H.
W. Habermeyer,
Jr.
Vice President
Nuclear Services
Department
Carolina
Power
& Light Company
P. 0.
Box 1551
- Hail
OHS7
Raleigh,
NC
27602
J.
Donohue
Plant General
Manager
Shearon
Harris Nuclear
Power Plant
P. 0.
Box 165 - Hail Code:
Zone
1
New Hill, NC
27562-0165
David HcCarthy,
Manager
Regulatory Affairs
Harris Nuclear Project
P. 0.
Box 165
New Hill, NC
27562
H.
Ray Starling
Nanager
- Legal Department
Carolina
Power
and Light Co.
P. 0.
Box 1551
Raleigh,
NC
27602
(cc w/encls cont'd - See
page 3)
Carolina
Power
and Light Company
(cc w/encls cont'd)
Dayne
H. Brown, Director
Division of Radiation Protection
N. C. Department of Environmental
Commerce
5 Natural
Resources
P. 0.
Box 27687
Raleigh,
NC
27611-7687
Karen
E.
Long
Assistant Attorney General
State of North Carolina
P. 0.
Box 629
Raleigh,
NC
27602
Public Service
Commission
State of South Carolina
P. 0.
Box 11649
Columbia,
SC
29211
Admiral Kinnaird R.
McKee
214 South Morris Street
Oxford,
21654
Robert
D. Martin
3382
Sean
Way
Lawrenceville,
GA
30244
bcc w/encls:
H. Christensen,
RII
N. Le,
Document Control
Desk
Jug -3 Ss4
NRC Resident
Inspector
U. S. Nuclear Regulatory
Commission
5421 Shearon
Harris
Road
New Hill, NC
27562-9998
SEND
OFC
RI I:DRP
TO
NAHE
JStarefos:t
/94
T
DATE
No
COPY?
OFFICIAL RECORD
COPY
No
/
/94
/
/94
Yes
Yes
No
DOCuMENT NAME:
P:%HA
-
.RPT
Ho
/
/94
Yes
Ho
/
/94
Yes
No