| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/15/1994 |
| From: | Robinson W CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-89-10, NLS-94-055, NLS-94-55, NUDOCS 9407210134 | |
| Download: ML18011A502 (6) | |
Text
REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)
ACCESSXON NBR:9407210134 DOC.DATE: 94/07/15 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILXATION ROBINSON,W.R.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)
DOCKET 05000400.
P
SUBJECT:
Responds to NRC GL 89-10,completion of motor test program implementation.
DISTRIBUTXON CODE:
A064D COPIES RECEIVED LTR ENCL TITLE: Response to Generic Ltr 89-10, "Safety-R lated NOTES:Application for permit renewal filed.
operated valve I
SIZE:
MOV Testing
& Surveill 0
05000400 R
RECIPXENT ID CODE/NAME PD2-1 PD, XNTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB NRR/PD111-3 RES/DSIR EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT XD CODE/NAME LE,N AEOD/DSP/ROAB NRR/DE/EMEB NRR/DRPW/OGCB gREG 01 RES DSIR/EIB/B NSIC COPIES LTTR ENCL 1
1 1
1 1
D 0
U N
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUivIENTCONTROL DESK, ROOIiI P 1-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL ~C
~
~
8 ~
1 r
~
I J
1
Carolina Power & Light Company PO Box 165 New Hill NC 27562
.JUL 1
5 1994 SERIAL: NLS-94-055 William R. Robinson Vice President Harris Nuclear Plant United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/License NO. NPF-63 RESPONSE TO NRC GENERIC LETTER 89-10: COMPLETION OF MOTOR OPERATED VALVETEST PROGRAM IMPLEMENTATION Gentlemen:
On June 28, 1989, the NRC issued Generic Letter No. 89-10, "Safety-Related Motor-Operated Valve (MOV) Testing and Surveillance Program."
The Generic Letter recommended that licensees'rograms with respect to MOVs should provide for testing, inspection and maintenance of MOVs so as to provide the necessary assurance that they will function as required when subjected to the design basis conditions that are considered during both normal operation and abnormal events within the design basis of the plant.
The purpose of this letter is to notify the NRC that the Shearon Harris Nuclear Power Plant has completed implementing an MOVprogram (items a through h in the Generic Letter) in accordance with the commitments provided in Carolina Power &Light Company response letters dated December 27, 1990 and June 6, 1991, CP&L will continue to ensure proper MOV performance and design configuration control at SHNPP utilizing NRC guidance, data obtained from completed MOV testing, and additional MOV-related industry operating experience.
Ifyou have any questions concerning this issue, please contact Mr. D.C. McCarthy at (919) 362-2100.
Sincerely, MV W. R. Robinson
, 9407210134 940715 PDR ADDCK 05000400 P
PDR State Road 1'l34 New Hill NC Tel 919362-2502 Fax 919362-6950
4 J'
~
Document Control Desk
~ Page 2 / NLS-94-055 W. R. Robinson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best ofhis information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power
&Light Company.
M>> cornmissi".n e.".pi"es:
R-5=9~
c: Mr. S. D. Ebnetter Mr. N. B. Le Mr. J. E. Tedrow f
Notary (Seal ao 4~7 NOTARY PUOLIC