Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18010B051 + (ML18010B051)
- ML18010B055 + (ML18010B055)
- ML18010B056 + (ML18010B056)
- ML18010B057 + (ML18010B057)
- ML18010B058 + (ML18010B058)
- ML18010B060 + (ML18010B060)
- ML18010B061 + (ML18010B061)
- ML18010B062 + (ML18010B062)
- ML18010B063 + (ML18010B063)
- ML18010B064 + (ML18010B064)
- ML18010B065 + (ML18010B065)
- ML18010B066 + (ML18010B066)
- ML18010B067 + (ML18010B067)
- IR 05000400/1993006 + (ML18010B069)
- 05000400/LER-1993-001-03, :on 930308,discovered That Operations Surveillance Test for Onsite Power Distribution Did Not Check Position of Battery 2CB Input Breakers.Caused by Procedure Rev Oversight.Procedure Revised + (ML18010B072)
- IR 05000400/1992027 + (ML18010B073)
- ML18010B074 + (ML18010B074)
- IR 05000400/1993007 + (ML18010B076)
- ML18010B077 + (ML18010B077)
- ML18010B079 + (ML18010B079)
- 05000400/LER-1993-002-03, :on 930330,discovered Bearing Failure on Fan AH-92H Concurrent W/Inoperable Train B Essential Svc Chilled Water Chiller.Caused by Loose Bearings Shaft Locking Ring. Air Handling Unit Repaired & Returned to Svc + (ML18010B080)
- ML18010B082 + (ML18010B082)
- ML18010B083 + (ML18010B083)
- ML18010B084 + (ML18010B084)
- ML18010B085 + (ML18010B085)
- ML18010B087 + (ML18010B087)
- ML18010B088 + (ML18010B088)
- ML18010B089 + (ML18010B089)
- ML18010B090 + (ML18010B090)
- 05000400/LER-1993-004-02, :on 930413,discovered That Two CR Ventilation Dampers Not Tested within Required Surveillance Interval Due to Personnel Error.Operations Surveillance Test OST-1131 Revised & Event Reviewed by ISI Personnel + (ML18010B091)
- ML18010B092 + (ML18010B092)
- ML18010B095 + (ML18010B095)
- ML18010B097 + (ML18010B097)
- ML18010B098 + (ML18010B098)
- ML18010B099 + (ML18010B099)
- 05000400/LER-1993-005-02, :on 930428,discoverd That Error Made During Review & Evaluation of Charging/Si Pump (Csip) B Acceptance Test Results.Caused by Personnel Error.Csip B Declared Inoperable + (ML18010B100)
- ML18010B101 + (ML18010B101)
- ML18010B102 + (ML18010B102)
- ML18010B104 + (ML18010B104)
- ML18010B105 + (ML18010B105)
- ML18010B106 + (ML18010B106)
- IR 05000400/1993010 + (ML18010B108)
- ML18010B109 + (ML18010B109)
- ML18010B110 + (ML18010B110)
- ML18010B113 + (ML18010B113)
- ML18010B114 + (ML18010B114)
- ML18010B115 + (ML18010B115)
- ML18010B116 + (ML18010B116)
- ML18010B117 + (ML18010B117)
- 05000400/LER-1993-006-01, :on 930517,automatic Sampling Device Did Not Function During Release of Secondary Waste Sample Tank Due to Failure in Units Electronic Counter.Counter Replaced W/Modified Model + (ML18010B118)
- 05000400/LER-1993-007-01, :on 930523,SUT to Auxiliary Bus E Supply Breaker 121 Failed to Open Automatically Due to Misaligned Mechanism Operated Cell Switch in Breaker 122.Insp of Other 6.9 Kv Breakers Performed + (ML18010B119)