Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17342B177 + (ML17342B177)
- ML17342B178 + (ML17342B178)
- ML17342B179 + (ML17342B179)
- ML17342B180 + (ML17342B180)
- ML17342B181 + (ML17342B181)
- ML17342B182 + (ML17342B182)
- ML17342B183 + (ML17342B183)
- ML17342B184 + (ML17342B184)
- ML17342B185 + (ML17342B185)
- ML17342B186 + (ML17342B186)
- ML17342B188 + (ML17342B188)
- ML17342B190 + (ML17342B190)
- ML17342B191 + (ML17342B191)
- ML17342B193 + (ML17342B193)
- ML17342B194 + (ML17342B194)
- 05000250/LER-1988-002, :on 880115,RCS Pressure Decreased to 625 Psig & Accumulators Started to Inject.Caused by Defective Controller for Valve PCV-3-455B.Controller Replaced + (ML17342B196)
- 05000251/LER-1986-015, :on 860821,auxiliary Feedwater Sys Train Declared out-of-svc Due to Failed Valves.Caused by Wire Bundle Pressed Against Contact Switch,Keeping Contact Open. Wire Bundle Relocated + (ML17342B197)
- ML17342B198 + (ML17342B198)
- ML17342B199 + (ML17342B199)
- 05000251/LER-1988-001-01, :on 880129,operability Requirements of Tech Spec 3.5.1 for Steam Generator lo-lo Level Reactor Could Not Be Met.Caused by Procedural Error.Setpoints of Affected Channels Rechecked,Calibr & Procedure Revised + (ML17342B200)
- ML17342B201 + (ML17342B201)
- L-88-102, Requests That Author Be Sent NRC Correspondence Re Plants at Listed Address + (ML17342B202)
- L-88-101, Semiannual Radioactive Effluent Release Rept,Jul-Dec 1987 + (ML17342B204)
- 05000251/LER-1988-002-01, :on 880202,containment & Control Room Ventilation Isolation Occurred.Caused by Personnel Error While Performing Mod to Remove Remote Alarm Function.Planner & Technician Involved Counselled + (ML17342B205)
- L-88-108, Special Rept:On 880125,underground Fire Mains Ruptured During Excavation to Install Storm Drains & Catch Basins. Caused by Improper Work Controls & Fire Main Not Accurately Located Prior to Excavation.Initial Break Repaired + (ML17342B206)
- ML17342B207 + (ML17342B207)
- ML17342B209 + (ML17342B209)
- L-88-119, Responds to NRC Re Violations Noted in Insp Repts 50-250/87-08 & 50-251/87-08.Corrective Actions:Insp & Enhancement Program for Equipment Qualification Splices Initiated & Procedure Gmi 102.2 Revised + (ML17342B210)
- 05000251/LER-1988-003-01, :on 880207,shutdown of Unit from 100% Power Commenced Due to Exceeding Requirements of Tech Spec for Having Battery Charger 4S Out of Svc.Caused by Failure of Snubber Capacitor.Capacitor Replaced + (ML17342B211)
- L-88-115, Special Rept:Fire Barrier Penetration Breached for Longer than 7 Days & Other Fire Protection Impairment Noted.Caused by Number of Impairments Being Performed.Plant Continues to Implement Compensatory Measures + (ML17342B213)
- ML17342B214 + (ML17342B214)
- ML17342B215 + (ML17342B215)
- ML17342B217 + (ML17342B217)
- ML17342B218 + (ML17342B218)
- IR 05000250/1987052 + (ML17342B220)
- IR 05000250/1987048 + (ML17342B221)
- ML17342B222 + (ML17342B222)
- L-88-111, Withdraws 880115 Request for Relief from Offsite Organization Tech Specs to Implement Changes in Organization of Nuclear Energy Dept Because Util Decided to Maintain Tech Spec Organization & Submit License Amends + (ML17342B223)
- L-88-122, Forwards Summary of mgt-on-shift Weekly Rept for Wk Starting 880229,per NRC 871019 Order + (ML17342B226)
- L-88-145, Discusses Nuclear Property Insurance Programs for Onsite Property Damage + (ML17342B228)
- L-88-131, Comment on Proposed Rule 10CFR50,App J Re Primary Reactor Containment Leakage Testing for water-cooled Power Reactors. Util Endorses Addition of Mass Point Methodology to Acceptable Leakage Rate Calculational Methods + (ML17342B231)
- ML17342B232 + (ML17342B232)
- L-88-139, Confirms Agreement from 880315 Meeting That Operability of Intake Cooling Water/Component Cooling Water HXs Will Be Verified by Determining That Every Combination of HXs Capable of Removing Design Basis Heat Loads + (ML17342B233)
- ML17342B234 + (ML17342B234)
- L-88-126, Annual Nonradiological Environ Monitoring Rept for 1987 + (ML17342B235)
- ML17342B236 + (ML17342B236)
- ML17342B238 + (ML17342B238)
- ML17342B240 + (ML17342B240)
- ML17342B244 + (ML17342B244)
- ML17342B245 + (ML17342B245)
- L-88-155, Forwards Further Progress Re USI A-46,Generic Ltr 87-02, Verification of Seismic Adequacy of Mechanical Equipment in Operating Reactors. Results of site-specific Value/Impact Analyses in Hand & Meet Will Be Scheduled + (ML17342B246)