Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML17252B5053 November 2017DresdenLER 77-050/03L-0 for Dresden, Unit 2 Re Local Leak Rate Test of Drywell Personnel Air Lock During Refueling
ML17252A32621 October 2017DresdenLER 77-040/03L-0 for Dresden 3 Regarding the Circuit Breaker for Service Water Makeup Valve MO-3-4102 to the Isolation Condenser Found in Off Position
ML17252B49228 August 2017DresdenLER 78-028/01X-1 for Dresden, Units 2 and 3 Re NRC Request for Immediate Actions to Be Taken to Mitigate the Potential for a Spurious Closure of a Recirculation Loop Suction Valve with a LOCA Occurring Between the Loop Discharge and Suction
ML20079A9795 April 1991Browns FerryPart 21 Rept Re Failure to Comply W/Purchase Orders When Shipping 12 3000 Socket Weld Unions,Astm B247 Alloy 6061-T6 & Three 150 Pipe Flanges,Astm B62 Cast Brass.Matl Supplied Following Commercial Program
ML20059M17524 September 1990Calvert Cliffs
Fermi
Limerick
North Anna
Supplemental Part 21 Rept 1 Re Defect in Coltec Industries, Inc Connecting Rod Assemblies Nuts/Bolts on Model 38TD8-1/8 Emergency Generators.Initially Reported on 851120.Nuts/bolts for Assemblies at Stated Plants Inspected & Replaced
ML20245C92329 October 1987SequoyahForwards Response to Each Unresolved Item Identified During Integrated Design Insp of ERCW Sys Which Must Be Resolved Before Restart of Unit 2,per 871009 Request.Plant Design Sound & Addl Independent Reviews Not Warranted
ML20235P6122 October 1987SequoyahForwards Response to Request for Addl Info Re Integrated Design Insp,Including Util Position on 14 of 19 Concerns Raised by Integrated Design Insp.Results of Insp in Civil Area Do Not Bring Into Doubt Overall Structural Adequacy
ML20238E77210 September 1987SequoyahPart 21 Rept Re Special high-potential Withstand Tests on Number of Installed 14 Silicone rubber-insulated Single Conductor Cables.Initially Reported on 870904.Evaluation of Silicone Rubber Cable Continuing
ML20235H00410 September 1987SequoyahPart 21 Rept Re Nonconformance of American Insulated Wire Co & Rockbestos Co Silicone rubber-insulated Single Conductor Cables.Initially Reported on 870904.Cause Not Found. Evaluation Continuing
ML20206H1278 September 1987Comanche PeakRequests Plan & Schedule for Completing Comanche Peak Review Group Recommendations by 870911
ML20238F11224 August 1987SequoyahForwards marked-up Page 28 of Transcript of 870708 Meeting W/Util Re Discussion of Scope of Independent Verification Program
ML20237L71721 August 1987SequoyahForwards Comments on Plant Revised Cable Test Program. Industry Experience Adequate to Refute TVA Claims.Nrc Agreement W/Test Program Would Establish Lower than Necessary Stds as Precedents for Industry
ML20235A21519 August 1987Comanche PeakForwards Rept of Comanche Peak Review Group for Use in Responding to Chairman 870512 Memo on Facility.Release of Info Scheduled for 870819.Requests That Ta Rehm Be Advised of Plan & Schedule for Responding to COMLZ-87-25 by 870826
ML20237F7103 August 1987CallawayRequests That Listed Pages to Rev 6 of Security Plan Be Inserted & Addl Identified Pages Be Returned,Due to Error. Pages Withheld
ML20237G1211 August 1987Comanche PeakComments on Recent Repts Re Gross Mismanagement at Plant by Util.Placement of Organization on Mailing List to Receive Press Releases & Other Public Repts of NRC Insps & Decisions Re Plant Requested
ML20236J93531 July 1987SequoyahUpdates Status of Issues Re Plant Design Calculations Review Discussed in SA White to Jg Keppler,Reflecting Info Discussed in 870521 Meeting.Reasons That Certain Issues Remain Open Discussed
ML20195G32629 July 1987Forwards long-range CRGR Agenda for Period Through Dec 1988. Review of Agenda Items Scheduled for CRGR Consideration by End of CY88 Requested by 870821.Criteria for Review Listed
ML20235G53510 June 1987SequoyahForwards Info Confirming & Supplementing Detailed Presentation at 870521 Meeting Re Commissioner Asselstine 870318 Questions Concerning Programs for Safe Restart.Util Will Cooperate W/Independent Design/Const Verification
ML20215F9805 June 1987Notification of Contract Execution: NRC Comanche Peak Ofc Complex, Awarded to Texas Utils Electric Co
ML20235A47629 May 1987Comanche PeakAdvises That Action on Paragraphs 1 & 2 of Encl Comlz 87-25 Be Withheld Until Further Notice.W/O Encl
ML20214L26818 May 1987SequoyahInforms That Util Nuclear Safety Review Board Reviewed & Accepted Corporate & Facility Nuclear Performance Plans,In Response to Suggestions Raised at 870310 & 0420 Util/Nrc Senior Mgt Team Meetings.Memo Re Plans Encl
ML20215K8409 May 1987Comanche PeakComments on Applicant 870429 Request for Extension of CPPR-127.Hearings Must Be Held to Address Significant Hazards Considerations Prior to NRC Action to Renew Cp. Related Correspondence
ML20215L6029 May 1987Comanche PeakAck Receipt of Util 870429 Application to Extend CP Expiration Date.Same Significant Hazards Considerations That Apply to Unit 1 Also Apply to Unit 2
ML20215J00428 April 1987SequoyahProvides Addl Info Re Conduct of Open Meeting Between TVA & Nrc,Per Author .Meeting Will Be Expanded to Include All Essential Elements for Unit 2 Restart,Including Nuclear Performance Plan & Design Calculations Review
ML20209J11524 April 1987Comanche PeakRequests Response to Concerns Re Status of Const Project & Assurance That Plant Upon Completion Operates in Manner That Does Not Endanger Public Health & Safety
ML20214K1671 April 1987Comanche PeakNotification of Contract Execution: NRC Comanche Peak Ofc Complex, Awarded to Texas Utilities Electric Co
ML20205Q30523 March 1987Forwards Draft Vol 8,Number 6 to NUREG/BR-0051, Power Reactor Events, Covering Nov-Dec 1986.Review & Comments Requested by 870406.W/o Encl
ML20215K07820 March 1987LaSalleResponds to NRC Re Violations Noted in Insp Rept 50-373/87-04.Corrective Actions:Util Will Revise Type a Test Procedure LTS-300-4 to Conform W/Nrr Interpretation in Cw Hehl to C Reed
ML20206Q59120 March 1987ZionResponds to Noncompliance Noted in Insp Repts 50-295/86-26 & 50-304/86-26 on 861027-1120 & 870217.Corrective Actions: Supplemental Work Instructions Will Be Attached to Work Request & Diesel Generator Procedures Reviewed & Rewritten
ML20204H3569 March 1987BraidwoodForwards Response to Violations Noted in Insp Rept 50-456/87-02 on 870105-09.Encl Withheld
ML20207T2776 March 1987ByronRo:On 870210,diesel Generator 1A Experienced Valid Test Failure.Caused by Failure of Check Valve to Supply Day Tank in Event That Check Valve Fails to Seat.Addl Soft Seat Check Valve Installed Between Engine & Supply Day Tank
U-600849, Provides Rept on Completion of IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Imppropoer Switch Settings, Per Bulletin Item F. Correct Switch Settings Determined & Adjusted2 March 1987ClintonProvides Rept on Completion of IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Imppropoer Switch Settings, Per Bulletin Item F. Correct Switch Settings Determined & Adjusted
ML20215J78627 February 1987ByronForwards Comments on SALP 6 Board Repts 50-454/87-01 & 50-455/87-01.Util Notifications Consistent W/Requirements Re Inoperability of Process Computer & Subsequent Loss of Emergency Assessment
ML20237L72527 February 1987Reaffirms That Two Paths Exist to Grant Relief from Tech Spec Limiting Conditions for Operation That Would Unnecessarily Require Shutdown or Delay Startup Absent Some Relief.Roles of NRR & Regions Clarified
ML20212K93227 February 1987ByronSpecial Rept;On 870215,wide-range Noble Gas Monitor Taken Out of Svc for Mod to Demonstrate Capability to Test for Radioiodine,Per TMI Action Plan Item II.F.1.Mod Scheduled for Completion by mid-Mar 1987
U-600851, Submits Addl Info Revising 870106 Response to Violations Noted in Insp Rept 50-461/86-65.Corrective Actions: Procedural Controls Will Be Provided by 870327 to Define Authorization for Select Evolutions W/Verbal Approval26 February 1987ClintonSubmits Addl Info Revising 870106 Response to Violations Noted in Insp Rept 50-461/86-65.Corrective Actions: Procedural Controls Will Be Provided by 870327 to Define Authorization for Select Evolutions W/Verbal Approval
ML20235H58425 February 1987Dresden
Byron
Braidwood
Quad Cities
Zion
LaSalle
05000000
Forwards Rev 44 to QA Program for Nuclear Generating Stations, Reflecting Organization,Title & Quad Cities ASME Survey Changes
ML20212K43424 February 1987LaSalleResponds to Violations Noted in Insp Repts 50-373/86-40 & 50-374/86-40.Corrective Actions:Instrument Maint Technicians Returned Pressure Switch to Operable Status within 2 H,Per Tech Spec 3.3.2.b
ML20212K91223 February 1987LaSalleSpecial Rept:Fire Detection Zone 2-2 Removed from Svc to Prevent Spurious Zone Fire Alarms Due to Extensive Welding & Cutting.Caused by Primary Containment Vent & Purge Valve Design Mod Const.Hourly Fire Watch Patrol Established
ML20207R08423 February 1987BraidwoodForwards Supplemental Response to Open Item Noted in Insp Repts 50-456/86-45 & 50-457/86-33 on 860818-1022. Inaccessibility of Control Room to NRC Inspectors Attributed to Temporary Const & Scaffolding.Obstructions Removed
ML20212H44423 February 1987LaSalleResponds to NRC Re Violations Noted in Insp Repts 50-373/86-45 & 50-374/86-45.Corrective Actions: Expired Reagent Disposed of & Fresh Reagent Prepared on 861210.Insp Performed for Other Expired Reagents
U-600842, Forwards Rev to Physical Security Plan,Per 10CFR50.54(p). Summary of Changes Encl.Rev Withheld23 February 1987ClintonForwards Rev to Physical Security Plan,Per 10CFR50.54(p). Summary of Changes Encl.Rev Withheld
ML20212K86223 February 1987LaSalleSpecial Rept:On 870129,fire Damper Found to Be Installed Upside Down & Declared Inoperable.Fire Damper Installed Incorrectly During Const.Hourly Fire Watch on at Least One Side of Assembly Established & Work Request Initiated
ML20214F32320 February 1987ByronResponds to NRC Re Violations Noted in Insp Rept 50-455/86-46.Corrective Actions:Complete & Thorough Walkdown Conducted of Piping Sys Assoc W/Unit 1 & Unit 2 Flow Transmitters FT-RH001 & FT-RH002
ML20207T60120 February 1987ByronResponds to NRC Re Violations Noted in Insp Repts 50-454/86-45 & 50-455/86-41 on 861018-1114.Corrective Actions:Proper Method of Performing Safety Evaluations Disseminated.Reconsideration of Violations Requested
ML20211L36119 February 1987Forwards,For Review & Comment,Draft NUREG/BR-0051, Power Reactor Events, Vol 8,Number 5,for Sept-Oct 1986.Comments Requested by 870309
ML20212D55817 February 1987La CrosseResponds to NRC Re Violations Noted in Insp Rept 50-409/86-18.Corrective Actions:Walkdown of HPCS Piping Performed,Appplicable Design Drawings Revised & New Drawings Generated to Accurately Reflect as-built Conditions
ML20211N53417 February 1987FermiDiscusses Mutual Concerns Re Reportability of Incidents to Nrc.Methods to Improve Candor & Forthrightness Also Discussed,Per Recent Notice of Violation Concerning Rod Pull Error.Related Info Encl
ML20212K40417 February 1987ZionNotifies That Inservice Insp Scheduled to Begin mid-Mar 1987 & Completed by mid-June 1987.Insps Will Include Volumetric, Surface & Visual Insps of ASME Class 1,2 & 3 Components & Eddy Current Testing of Steam Generators
ML20212B35617 February 1987LaSalleSpecial Rept:Fire Detection Zones 2-16 & 2-16P Will Be Removed from Svc as Precaution to Prevent Spurious Zone Fire Alarms Due to Extensive Welding & Cutting in Areas.Subj Zones Will Be Out of Svc Through First Refueling Outage