ML20238F112

From kanterella
Jump to navigation Jump to search
Forwards marked-up Page 28 of Transcript of 870708 Meeting W/Util Re Discussion of Scope of Independent Verification Program
ML20238F112
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/24/1987
From: White S
TENNESSEE VALLEY AUTHORITY
To: James Keppler
NRC OFFICE OF SPECIAL PROJECTS
References
NUDOCS 8709150386
Download: ML20238F112 (2)


Text

m

- i jj TENNESSEE VALLEY AUTHORITY-CHATTANOOGA, TENNESSEE 37401.

6N 38A Lookout Place-August 24, 1987 WS 16 h.I.1'?

@S $$ f 32$

l

/

Mr. -James Keppler,: Director

(:

Office of Special Projects

~U.S. Nuclear Regulatory Commission 4350 East-West Highway-EWH 322-Bethesda, Maryland 20814

Dear Mr. Keppler:

TRANSCRIPT OF THE MINUTES OF THE JULY 8.-1987 MEETING HITH THE TENNESSEE

?

VALLEY. AUTHORITY.

During my review of.the subject 1 transcript,;I noticed some significant omissions of my words during the discussion of the scope'of the independent verification ~ program. 'For the record, enclosed is a marked-up page 28 of the-transcript which more clearly states what was said at the July 8,-1987 meeting.

Very truly yours.

TENNESSEE VALLEY AUTHORITY A

fi Manager of Nuclear Power j

Enclosure l

I i

L-G709150386 070824 M

{DR ADOCK 05000327 PDR J

1 An Equal Opportunity Employer

-Q

t[.:

28 6

4 1-So, we are'not going out of our way to ~ avoid

((

2L things which.have been overviewed by TVA, particularly..

3-MR. WHITE:' I don't know how that fits in with k)OurcgK l e t te r, Mr. Keppler, now.

4 5

MR. KEPPLER:

I wouldn't accept the remarks 6

that was just made exactly, because I think it is not our

7 intent to dwell on areas that you have spent time on.

8 MR. EBNETER:

.You have done calculations in-9 civil areas.

' The team will have to review that 10 calculation to the extent to verify the validity of it

~

11 and the assumptions used in making that and the accuracy-12 of the final calculation.

They may not have to redo the 13 calc, but they have to lock at the calc and verify 'it.

14 MR. WHITE:

I just want to make sure that --

from your letter 15 can I make a try at this to sayAthat the verification 16

. effort is going to focus on areas not directly covered by 17 our other eff orts and should minimize redoing work 18 already perf ormed by TVA.

your 19 I think that was that intent, and I just want 20 to make sure that hasn't changed from what you said.

21

M R. EBNETER:

We will have to do what we i

j 22 have to do to verify the design.

Those comments were f or 23 your benefit to minimize the impact on your staff.

It's i

24 nothing to do with my staff.

They will do whatever they 25 have to do to do the verification.

It will involve eM1Te Re,oR m e,eenc u e1s e m a n a c s. 77a

. -,