Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000254/2023004 | 5 February 2024 | Integrated Inspection Report 05000254/2023004 and 05000265/2023004 | |
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 | 29 January 2024 | Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 | |
ML24004A005 | 17 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 3 January 2024 | Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | VT-2 |
IR 05000254/2023403 | 22 December 2023 | Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 | Affidavit |
IR 05000254/2023010 | 20 December 2023 | Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 | Safe Shutdown Reactor Vessel Water Level Stroke time FLEX Significance Determination Process Local Leak Rate Testing Operability Determination Battery sizing Power-Operated Valves Fuel cladding Very Low Safety Significance Issue Resolution Weak link Power Uprate |
ML23349A162 | 17 December 2023 | Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) | Safe Shutdown Probabilistic Risk Assessment Cyber Security Arc flash Surveillance Frequency Control Program Safeguards Contingency Plan Recently irradiated fuel Offsite Circuit |
RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 15 December 2023 | Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | High winds Mission time Tornado Missile B.5.b Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit |
ML23349A036 | 14 December 2023 | NRR E-mail Capture - Draft Request for Additional Information Re Quad Cities Emergency Amendment Related to Unit 1 Diesel Generator Inoperability | B.5.b |
ML23305A140 | 13 December 2023 | Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan |
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 13 December 2023 | Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Safe Shutdown Arc flash FLEX Missed surveillance Surveillance Frequency Control Program Offsite Circuit |
ML23339A176 | 5 December 2023 | Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) | Non-Destructive Examination Aging Management Foreign Material Exclusion Scaffolding |
ML23338A119 | 21 November 2023 | NRR E-mail Capture - Draft Request for Additional Information Quad Cities Relief Request I5R-26 | |
ML23319A334 | 20 November 2023 | Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 | Tornado Missile Internal Flooding Probabilistic Risk Assessment Qualified Offsite Circuit FLEX Open Phase Condition Offsite Circuit |
RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 17 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23320A247 | 17 November 2023 | Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 | Probabilistic Risk Assessment |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 | 13 November 2023 | Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 | |
ML23317A119 | 10 November 2023 | Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums | Affidavit |
IR 05000254/2023003 | 9 November 2023 | Integrated Inspection Report 05000254/2023003 and 05000265/2023003 | Safe Shutdown Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Operability Determination Maintenance Rule Program Fire Protection Program |
RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 | 20 October 2023 | Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 | Safe Shutdown Aging Management License Renewal |
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | 12 October 2023 | Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | |
ML23268A002 | 22 September 2023 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 | |
ML23263B106 | 22 September 2023 | R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary | |
ML23206A038 | 21 September 2023 | Proposed Alternative to the Requirements of the ASME Code | Non-Destructive Examination Nondestructive Examination Incorporated by reference |
ML23264A799 | 21 September 2023 | NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 | |
IR 05000254/2023011 | 20 September 2023 | Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 | |
ML23262A743 | 19 September 2023 | NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 Acceptance of Relief Request I5R-26 | |
RS-23-089, Sixth Ten-Year Interval Inservice Testing Program | 5 September 2023 | Sixth Ten-Year Interval Inservice Testing Program | Safe Shutdown Packing leak High Radiation Area Stroke time Squib Incorporated by reference Locked High Radiation Area Missed surveillance Surveillance Frequency Control Program Scram Discharge Volume Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | 30 August 2023 | Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | Shutdown Margin Surveillance Frequency Control Program |
RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 28 August 2023 | Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | |
ML23237A269 | 25 August 2023 | Summary of the August 23, 2023 Public Outreach to Discuss the NRC 2022 End-of Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 | Open House |
SVP-23-038, Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities | 14 August 2023 | Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities | |
ML23255A104 | 11 August 2023 | Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout | |
IR 05000254/2023002 | 8 August 2023 | Integrated Inspection Report 05000254/2023002 and 05000265/2023002 | Shutdown Margin High Radiation Area Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program |
ML23178A074 | 7 August 2023 | Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location | Water Inventory Control Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan |
ML23216A036 | 7 August 2023 | Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI | Job Performance Measure |
ML23216A056 | 4 August 2023 | Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 | Open House |
ML23216A069 | 4 August 2023 | Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Nuclear Plant for Performance for 2022 Calendar Year | Open House |
SVP-23-031, Regulatory Commitment Change Summary Report | 14 July 2023 | Regulatory Commitment Change Summary Report | |
ML23186A141 | 5 July 2023 | NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-505 | |
ML23186A148 | 5 July 2023 | NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt 10 CFR 50.69 | |
ML23181A106 | 30 June 2023 | Postponement- Information Meeting (Open House) with a Question-And-Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station | Open House |
ML23179A180 | 28 June 2023 | 07122023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Plant for Performance for 2022 Calendar Year | Open House |
ML23178A242 | 28 June 2023 | Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III | |
ML23179A193 | 28 June 2023 | 07122023 Letter-Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Plant for Performance for 2022 Calendar Year | Open House |