Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
WO 02-0062, Changes to Wolf Creek Radiological Emergency Response Plan, Implementing Procedures and Form | 19 December 2002 | Changes to Wolf Creek Radiological Emergency Response Plan, Implementing Procedures and Form | Safe Shutdown Health Physics Network Reactor Vessel Water Level Ultimate heat sink Fire Barrier Operating Basis Earthquake Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage |
ML023460033 | 12 December 2002 | Summary of Meeting with Strategic Teaming & Resource Sharing-Integrated Regulatory Affairs Group for Callaway, Comanche Peak, Diablo Canyon, South Texas, Wolf Creek & Palo Verde | |
ET 02-0046, Results of Eleventh Steam Generator Tube Inservice Inspection | 11 December 2002 | Results of Eleventh Steam Generator Tube Inservice Inspection | |
WO 02-0061, November 2002 Monthly Operating Report for Wolf Creek Generating Station | 10 December 2002 | November 2002 Monthly Operating Report for Wolf Creek Generating Station | |
TAC:MB5938 | 4 December 2002 | ||
ML023450444 | 4 December 2002 | Response to NRC Bulletin 2002-02 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs | Nondestructive Examination |
ML023400185 | 3 December 2002 | NRC Plans to Administer Generic Fundamentals Section of Written Operator Licensing Examination on 02/05/2003 | Generic Fundamentals Examination |
ML023360125 | 29 November 2002 | Inspection Date for Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures - Wolf Creek Generating Station | |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023030583 | 26 November 2002 | License Amendment, Revises Section 5.3.1.1, Unit Staff Qualifications, of Technical Specifications to State New Education & Experience Eligibility Requirements for Operator License Applicants, | |
ML023360270 | 26 November 2002 | Technical Specifications, Revises Section 5.3.1.1, Unit Staff Qualifications, of TSs to State New Education & Experience Eligibility Requirements for Operator License Applicants, TAC MB3017 | |
TAC:MB3017 | 26 November 2002 | ||
WO 02-0058, Notification of Changes at Wolf Creek Affecting Physical Security Plan | 21 November 2002 | Notification of Changes at Wolf Creek Affecting Physical Security Plan | |
IR 05000482/2002008 | 21 November 2002 | IR 05000482-02-008, on 09/23-27 & 10/07-11/02, Wolf Creek Generating Station, Regarding Selected Examination of Procedures & Representative Record. Non-Cited Violations Noted | Hot Short Safe Shutdown Fire Barrier Emergency Lighting Significance Determination Process Fire Protection Program |
ML023250507 | 21 November 2002 | RAI NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 15/60 Day Responses for Wolf Creek | Boric Acid VT-2 Pressure Boundary Leakage |
ML023120024 | 7 November 2002 | Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs Group | Missed surveillance Recently irradiated fuel |
WO 02-0057, October 2002 Monthly Operating Report for Wolf Creek Generating Station | 7 November 2002 | October 2002 Monthly Operating Report for Wolf Creek Generating Station | |
ML023110270 | 6 November 2002 | TS Pages-Wolf Creek Amendment No. 149 | Offsite Dose Calculation Manual Fire Protection Program |
TAC:MB5725 | 6 November 2002 | ||
ML023170628 | 6 November 2002 | Issuance of Amendment 149 Generic Personnel Titles in Administrative Controls Tac. MB5725 | Offsite Dose Calculation Manual |
ET 02-0049, Containment Inservice Inspection Program First Interval, First Period Owner'S Activity Reports | 4 November 2002 | Containment Inservice Inspection Program First Interval, First Period Owner'S Activity Reports | |
ET 02-0048, Supplemental Information for Inservice Inspection Program Alternative for Limited Examination on Feedwater Nozzle to Steam Generator Shell Weld, Relief Request L2R-23 | 4 November 2002 | Supplemental Information for Inservice Inspection Program Alternative for Limited Examination on Feedwater Nozzle to Steam Generator Shell Weld, Relief Request L2R-23 | |
ML023090541 | 1 November 2002 | Generic Fundamentals Examination Results | Generic Fundamentals Examination |
WO 02-0055, Changes to Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan Implementing Procedures and Forms | 31 October 2002 | Changes to Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan Implementing Procedures and Forms | |
ML023110103 | 25 October 2002 | Comment from D. R. Woodlan on DG-1099, Anchoring Components and Structural Supports in Concrete. | Backfit |
WO 02-0052, September 2002 Monthly Operating Report for Wolf Creek | 11 October 2002 | September 2002 Monthly Operating Report for Wolf Creek | |
ML022740090 | 10 October 2002 | STARS-Meeting with Strategic Teaming and Resource Sharing-Integrated Regulatory Affairs Group (Stars-IRAG) for the Licrensees of Callaway, Comanche Peak, Diablo Canyon, Palo Verde, South Texas and Wolf Creek Plants | |
ML022800543 | 7 October 2002 | Meeting Notice, Callaway, Comanche Peak, Diablo, Canyon, Palo Verde, South Texas, and Wolf Creek Plants, Meeting with Strategic Teaming and Resources Sharing | Aging Management |
ML022540575 | 4 October 2002 | Relief Request, Inservice Inspection Interval | Non-Destructive Examination Incorporated by reference |
TAC:MB4078 | 4 October 2002 | ||
IR 05000482/2002004 | 4 October 2002 | IR 05000482-02-004; 06/30/02-09/21/02; Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station. Integrated Resident/Regional Report. Event Followup | Past operability Temporary Modification Significance Determination Process Fire Protection Program Overexposure |
ML022800231 | 2 October 2002 | Technical Specifications for License Amendment 148, Reactor Trip System Instrumentation | |
TAC:MB5724 | 2 October 2002 | ||
ML022250433 | 2 October 2002 | License Amendment 148, Reactor Trip System Instrumentation | |
ET 02-0033, Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2. | 1 October 2002 | Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2. | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment |