Letter Sequence Other |
---|
|
|
MONTHYEARML0230305832002-11-26026 November 2002 License Amendment, Revises Section 5.3.1.1, Unit Staff Qualifications, of Technical Specifications to State New Education & Experience Eligibility Requirements for Operator License Applicants, Project stage: Other ML0233602702002-11-26026 November 2002 Technical Specifications, Revises Section 5.3.1.1, Unit Staff Qualifications, of TSs to State New Education & Experience Eligibility Requirements for Operator License Applicants, TAC MB3017 Project stage: Other 2002-11-26
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:License-Materials Byproduct Amendment DKT 30
MONTHYEARML0230305832002-11-26026 November 2002 License Amendment, Revises Section 5.3.1.1, Unit Staff Qualifications, of Technical Specifications to State New Education & Experience Eligibility Requirements for Operator License Applicants, 2002-11-26
[Table view] Category:Safety Evaluation
MONTHYEARML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23256A2882023-09-20020 September 2023 Authorization and Safety Evaluation for Alternative Request No. I4R-08 ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22252A1512022-11-0404 November 2022 Issuance of Amendment No. 234 Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating ML22199A2942022-08-16016 August 2022 Issuance of Amendment No. 233 Removal of Table of Contents from the Technical Specifications ML22069A0562022-05-18018 May 2022 Issuance of Amendment No. 232 Regarding Revision to the Emergency Plan Related to On-Shift Staffing ML22021B5982022-02-23023 February 2022 Issuance of Amendment No. 231 Revision of Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML21210A2472021-09-0303 September 2021 Issuance of Amendment No. 230 Revision of Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange ML21095A1922021-07-20020 July 2021 Issuance of Amendment No. 229 Change to Owner Licensee Names ML21061A0782021-04-23023 April 2021 Issuance of Amendment No. 228 Regarding Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers ML21053A1172021-04-0808 April 2021 1 - Issuance of Amendment No. 227 TS Change Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Based on TSTF-425 ML20276A1492020-12-0707 December 2020 Issuance of Amendment No. 226 Extension of Type a and Type C Leak Rate Test Frequencies ML20302A0802020-10-30030 October 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20111A3372020-04-27027 April 2020 Request from Relief from Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-666-1 ML19353C5002020-02-27027 February 2020 Issuance of Amendment No. 224 Revision to Technical Specification 3.3.5, - Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, - ML19291A0182019-11-12012 November 2019 Request for Relief I4R-07, Utilize Code Case N-513-4 - Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping of American Society of Mechanical Engineers Boiler and Pressure Code Section XI ML19182A3452019-08-19019 August 2019 Issuance of Amendment No 222 Revise Technical Specifications to Adopt TSTF Traveler TSTF-529, Clarify Use and Application Rules ML19100A1222019-05-31031 May 2019 Issuance of Amendment No. 221 License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term ML19052A5462019-04-0101 April 2019 Issuance of Amendment No. 220 Revision to the Emergency Plan ML18334A0132018-12-12012 December 2018 Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Code Case N-666-1 ML18283A0492018-10-18018 October 2018 Request for Relief I4R-6 from ASME Code Visual Examination Requirements for Reactor Vessel Head Penetration Nozzle Weld Specified by Code Case N-729-4 ML18040A6662018-03-12012 March 2018 Letter, Order, and Safety Evaluation Order Approving Indirect Transfer of Control of Renewed Facility Operating License No. NPF-42 ML17166A4092017-08-28028 August 2017 Issuance of Amendment No. 218, Request to Adopt Emergency Action Level (EAL) Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 ML17144A0092017-08-0202 August 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17202E9192017-08-0202 August 2017 Relief Request 14R-05 from Certain Pressure Test Requirements of the ASME Code for Reactor Pressure Vessel Leak-Off Lines for the Fourth 10 Year Inservice Inspection Interval ML17024A2412017-03-24024 March 2017 Issuance of Amendment No. 217 Revision to the Cyber Security Plan Implementation Schedule ML16320A0322016-11-30030 November 2016 Request for Relief I4R-, Alternative Risk-Informed Methodology in Selecting Class 1 and 2 Piping Welds, for the Fourth 10-Year Inservice Inspection Interval ML16179A2932016-08-0303 August 2016 Issuance of Amendment No. 216, Revise Technical Specification (TS) 4.2.1 and TS 5.6.5 to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding ML16179A4432016-08-0202 August 2016 Safety Evaluation, Request for Exemption from 10 CFR 50.46 and Appendix K to Allow Use of Optimized Zirlo as Approved Fuel Rod Cladding ML16081A1942016-04-15015 April 2016 Issuance of Amendment No. 215, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10 and 3.8.1.14 Consistent with TSTF-276-A, Revise DG Full Load Rejection Test ML15183A0522015-09-11011 September 2015 Issuance of Amendment No. 214, Request to Revise Fire Protection Program Related to Alternative Shutdown Capability as Described in Updated Safety Analysis Report ML15203A0052015-08-28028 August 2015 Redacted, Issuance of Amendment No. 213, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Large-Break Loss-of-Coolant Accident Analysis Methodology (Astrum) ML15169A2132015-07-28028 July 2015 Issuance of Amendment No. 212, Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15190A2022015-07-13013 July 2015 Relief Request 13R-12, Extension of the Third Inservice Inspection Program Interval to Perform Reactor Vessel Stud Hole Ligament Examinations ML15134A0022015-05-15015 May 2015 Relief Request Nos. 4PR-01 and 4PR-02 and Withdrawal of 4VR-02, Alternative to Requirements of ASME Code Case OMN-21 and OM Code ISTB-3510(b)(1) for Pumps, Fourth 10-Year Inservice Testing Program ML15040A0202015-02-12012 February 2015 Relief Request I3R-10, Alternative from Pressure Test Requirements of ASME Code, Section XI, IWC-5220, Third 10-Year Inservice Inspection Interval ML15023A2202015-01-28028 January 2015 Relief Request 13R-11, Alternative from Pressure Test Requirements of ASME Code Section XI IWC-5220 for the Third 10-Year Inservice Inspection Interval ML14321A8642014-12-10010 December 2014 Relief Requests 13R-08, Reactor Pressure Vessel (RPV) Interior Attachments and 13R-09, RPV Pressure-Retaining Welds, Exam Interval Extensions, Third 10-year Inservice Inspection Interval ML14209A0232014-08-14014 August 2014 Issuance of Amendment No. 210, Modify License Condition Related to Approval of Revised Cyber Security Plan Implementation Milestone 8 Completion Date ML14156A2462014-08-0707 August 2014 Issuance of Amendment No. 209, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Replace Westinghouse Methodologies ML14157A0822014-07-0101 July 2014 Issuance of Amendment No. 208, Adopt TSTF-522-A, Revision 0, Revise Ventilation System to Operate for 10 Hours Per Month, Using Consolidated Line Item Improvement Process ML13282A5342013-12-0606 December 2013 Issuance of Amendment No. 207, Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, to Reflect Mass Input Transient Analysis ML13282A1472013-12-0202 December 2013 Issuance of Amendment No. 206, Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.10 to Increase Voltage Limit for Diesel Generator Load Rejection Test ML13197A2102013-08-23023 August 2013 Issuance of Amendment No. 205, Revise Fire Protection License Condition and the Updated Safety Analysis Report for a Deviation from Appendix R for Volume Control Tank Outlet Valves ML13109A2342013-07-12012 July 2013 Safety Evaluation Regarding Wolf Creek Generating Station - Loss of Offsite Power and Augmented Inspection, Issue for Resolution 2012-004 ML13149A1712013-06-0303 June 2013 Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13078A1552013-03-20020 March 2013 License Amendment Request to Change Diesel Generator Surveillance Requirements ML12353A2412013-01-0404 January 2013 Relief Request I3R-07 from ASME Code Case N-729-1 for Examination of Reactor Vessel Head Penetration Welds, for Remainder of Third 10-Year Inservice Inspection Interval 2023-09-20
[Table view] |
Text
November 26, 2002 Mr. Otto L. Maynard President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT:
WOLF CREEK GENERATING STATION - ISSUANCE OF AMENDMENT RE: UNIT STAFF QUALIFICATIONS (TAC NO. MB3017)
Dear Mr. Maynard:
The Commission has issued the enclosed Amendment No. 150 to Facility Operating License No. NPF-42 for the Wolf Creek Generating Station. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 27, 2001 (WO 01-0038), as supplemented June 27 and September 19, 2002 (WO 02-0032 and WO 02-0051, respectively).
The amendment revises Section 5.3.1.1, "Unit Staff Qualifications," of the TSs to state new education and experience eligibility requirements for operator license applicants. As stated in the letter dated September 19, 2002, the new requirements are outlined by the National Academy for Nuclear Training in its "Guidelines for Initial Training and Qualification of Licensed Operators," which were issued January 2000.
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-482
Enclosures:
- 1. Amendment No. 150 to NPF-42
- 2. Safety Evaluation cc w/encls: See next page
November 26, 2002 Mr. Otto L. Maynard President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839
SUBJECT:
WOLF CREEK GENERATING STATION - ISSUANCE OF AMENDMENT RE: UNIT STAFF QUALIFICATIONS (TAC NO. MB3017)
Dear Mr. Maynard:
The Commission has issued the enclosed Amendment No. 150 to Facility Operating License No. NPF-42 for the Wolf Creek Generating Station. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 27, 2001 (WO 01-0038), as supplemented June 27 and September 19, 2002 (WO 02-0032 and WO 02-0051, respectively).
The amendment revises Section 5.3.1.1, "Unit Staff Qualifications," of the TSs to state new education and experience eligibility requirements for operator license applicants. As stated in the letter dated September 19, 2002, the new requirements are outlined by the National Academy for Nuclear Training in its "Guidelines for Initial Training and Qualification of Licensed Operators," which were issued January 2000.
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-482 DISTRIBUTION PUBLIC GHill (2)
Enclosures:
- 1. Amendment No. 150 to NPF-42 PDIV-2 Reading DGraves, RIV
- 2. Safety Evaluation RidsNrrDlpmPdiv(WRuland)
SDembek cc w/encls: See next page RidsNrrPMJDonohew RidsNrrLAEPeyton RidsOGCRp RidsACRSACNWMailCenter WBeckner TS: ML023360270 Package: ML023380193 DTrimble ACCESSION NO.: ML023030583
- See IOLB memorandum dated 10/10/2002 OFFICE PDIV-2/PM PDIV-2/LA IOLB/DIPM OGC PDIV-2/SC NAME JDonohew EPeyton DTrimble* SUttal SDembek DATE 11/6/2002 11/5/2002 10/10/02 11/25/2002 11/25/2002 OFFICIAL RECORD COPY
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION DOCKET NO. 50-482 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 150 License No. NPF-42
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Wolf Creek Generating Station (the facility)
Facility Operating License No. NPF-42 filed by the Wolf Creek Nuclear Operating Corporation (the Corporation), dated September 27, 2001, as supplemented by letters dated June 27 and September 19, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-42 is hereby amended to read as follows:
- 2. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 150 , and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated in the license. The Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: November 26, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 150 FACILITY OPERATING LICENSE NO. NPF-42 DOCKET NO. 50-482 Replace the following page of the Appendix A Technical Specifications with the attached page.
The revised page is identified by the amendment number and contains marginal lines indicating the areas of change. The corresponding overleaf page is provided to maintain document completeness.
REMOVE INSERT 5.0-4 5.0-4
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 150 TO FACILITY OPERATING LICENSE NO. NPF-42 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION DOCKET NO. 50-482
1.0 INTRODUCTION
By application dated September 27, 2001, as supplemented June 27 and September 19, 2002, Wolf Creek Nuclear Operating Corporation (the licensee) requested changes to the Technical Specifications (TSs, Appendix A to Facility Operating License No. NPF-42) for the Wolf Creek Generating Station (WCGS). The proposed changes would revise Section 5.3.1.1, "Unit Staff Qualifications," of the TSs to state new education and experience eligibility requirements for operator license applicants.
The supplemental letter of September 19, 2002, provided additional information that clarified+-
the application, did not expand the scope of the application as originally noticed, and did not change the NRC staffs original proposed no significant hazards consideration determination as published in the Federal Register on July 23, 2002 (67 FR 48223).
2.0 REGULATORY EVALUATION
On March 20, 1985, the NRC issued the Commission Policy Statement on Training and Qualification of Nuclear Power Plant Personnel which endorsed the training accreditation process and the National Academy for Nuclear Training (NANT). In Generic Letter 87-07, "Information Transmittal of Final Rulemaking for Revisions to Operator Licensing - 10 CFR 55 and Conforming Amendments," dated March 19, 1987, and in NUREG-1262, "Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operators' Licenses," published November 1987, the NRC indicated it would accept a facilitys licensed operator training program if the facility certified in writing that the program was accredited and based on a systems approach to training (SAT). This certification would supersede the requirements of ANSI N18.1-1971, "Selection and Training of Nuclear Power Plant Personnel," and ANSI/ANS-3.1-1978, "Selection, Qualification and Training of Personnel for Nuclear Power Plants." Facility licensees were advised to submit a request to the NRC for an administrative change to their licensing documents to revise or delete, as appropriate, the requirements that had been superseded.
In 1992 the NRC published its proposed rule 10 CFR 50.120, "Training and Qualification of Nuclear Power Plant Personnel." The proposed rule stated that, if adopted, the rule would supersede the Policy Statement on Training and Qualification of Nuclear Power Plant Personnel and would not result in any change to accredited programs. The Commission
concluded that accredited programs, implemented consistent with industry objectives and criteria would be in compliance with this regulation. In April 1993, the NRC published its final rule on training and qualification of nuclear power plant personnel. The rule requires nuclear power plant licensees to establish, implement, and maintain SAT-based training programs for nine non-licensed positions. Accreditation of these nine training programs is an acceptable means of meeting the requirements of 10 CFR 50.120.
On January 18, 2001, the NRC published NRC Regulatory Issue Summary (RIS) 2001-01, Eligibility of Operator License Applicants," to familiarize licensees with the NRC's current guidelines for the qualification and training of reactor operator and senior operator license applicants. RIS 2001-01 acknowledged that 10 CFR 55.31(a)(4) allows the NRC to accept an application for an operators license if the facility licensee certifies that the applicant has successfully completed a Commission-approved training program that is based on a systems approach to training. RIS 2001-01 stated in part that the NANT guidelines for education and experience (those in effect in 1987 or those issued in January 2000) outline acceptable methods for implementing the Commission's regulations for the qualification and training of reactor operator and senior operator license applicants.
3.0 TECHNICAL EVALUATION
The revision proposed by the licensee will revise Wolf Creek TS Section 5.3, "Unit Staff Qualifications." The requested revision will update requirements that had been outdated based on licensed operator training programs being accredited by the Institute of Nuclear Power Operations and promulgation of the revised 10 CFR Part 55, "Operators Licenses." TS Section 5.3 describes the requirements for unit staff qualifications. These changes conform to the current requirements of 10 CFR Part 55. The TS requirements for all other unit staff qualifications remain unchanged.
The licensee stated in its letter of September 19, 2002, that the proposed new requirements are outlined by the National Academy for Nuclear Training in its "Guidelines for Initial Training and Qualification of Licensed Operators," which were issued January 2000. In RIS 2001-01, the Commission stated that these guidelines were an acceptable method for implementing the Commission's regulations for the qualification and training of reactor operator and senior operator license applicants.
The NRC staff concludes that the revised qualification requirements in TS Section 5.3 are adequate as they conform with the reactor operator and senior reactor operator license eligibility criteria and standards acceptable to the NRC, as discussed in Section 2.0 above. In addition, the changes will not affect the 10 CFR 50.36(c)(5) requirement to ensure the licensee maintains administrative controls that assure the operation of the facility in a safe manner by properly qualified licensed operators.
Based on the above discussion, the staff concludes that the proposed revision to TS Section 5.3 is consistent with 10 CFR Part 55 and does not adversely affect nuclear safety or plant operations. Therefore, the staff also concludes that the proposed amendment is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Kansas State Official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
This amendment relates to changes in recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: R. Pelton Date: November 26, 2002
Wolf Creek Generating Station cc:
Jay Silberg, Esq. Vice President Operations Shaw, Pittman, Potts & Trowbridge Wolf Creek Nuclear Operating Corporation 2300 N Street, NW P.O. Box 411 Washington, D.C. 20037 Burlington, KS 66839 Regional Administrator, Region IV Superintendent Licensing U.S. Nuclear Regulatory Commission Wolf Creek Nuclear Operating Corporation 611 Ryan Plaza Drive, Suite 1000 P.O. Box 411 Arlington, TX 76011 Burlington, KS 66839 Senior Resident Inspector U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Resident Inspectors Office P.O. Box 311 8201 NRC Road Burlington, KS 66839 Steedman, MO 65077-1032 Chief Engineer Mr. Otto L. Maynard Utilities Division President and Chief Executive Officer Kansas Corporation Commission Wolf Creek Nuclear Operating Corporation 1500 SW Arrowhead Road P.O. Box 411 Topeka, KS 66604-4027 Burlington, KS 66839 Office of the Governor State of Kansas Topeka, KS 66612 Attorney General Judicial Center 301 S.W. 10th 2nd Floor Topeka, KS 66612 County Clerk Coffey County Courthouse Burlington, KS 66839 Vick L. Cooper, Chief Radiation Control Program, RCP Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366