Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
WO 02-0062, Changes to Wolf Creek Radiological Emergency Response Plan, Implementing Procedures and Form19 December 2002Changes to Wolf Creek Radiological Emergency Response Plan, Implementing Procedures and FormSafe Shutdown
Health Physics Network
Reactor Vessel Water Level
Ultimate heat sink
Fire Barrier
Operating Basis Earthquake
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
ML02346003312 December 2002Summary of Meeting with Strategic Teaming & Resource Sharing-Integrated Regulatory Affairs Group for Callaway, Comanche Peak, Diablo Canyon, South Texas, Wolf Creek & Palo Verde
ET 02-0046, Results of Eleventh Steam Generator Tube Inservice Inspection11 December 2002Results of Eleventh Steam Generator Tube Inservice Inspection
WO 02-0061, November 2002 Monthly Operating Report for Wolf Creek Generating Station10 December 2002November 2002 Monthly Operating Report for Wolf Creek Generating Station
TAC:MB59384 December 2002
ML0234504444 December 2002Response to NRC Bulletin 2002-02 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection ProgramsNondestructive Examination
ML0234001853 December 2002NRC Plans to Administer Generic Fundamentals Section of Written Operator Licensing Examination on 02/05/2003Generic Fundamentals Examination
ML02336012529 November 2002Inspection Date for Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures - Wolf Creek Generating Station
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02303058326 November 2002License Amendment, Revises Section 5.3.1.1, Unit Staff Qualifications, of Technical Specifications to State New Education & Experience Eligibility Requirements for Operator License Applicants,
ML02336027026 November 2002Technical Specifications, Revises Section 5.3.1.1, Unit Staff Qualifications, of TSs to State New Education & Experience Eligibility Requirements for Operator License Applicants, TAC MB3017
TAC:MB301726 November 2002
WO 02-0058, Notification of Changes at Wolf Creek Affecting Physical Security Plan21 November 2002Notification of Changes at Wolf Creek Affecting Physical Security Plan
IR 05000482/200200821 November 2002IR 05000482-02-008, on 09/23-27 & 10/07-11/02, Wolf Creek Generating Station, Regarding Selected Examination of Procedures & Representative Record. Non-Cited Violations NotedHot Short
Safe Shutdown
Fire Barrier
Emergency Lighting
Significance Determination Process
Fire Protection Program
ML02325050721 November 2002RAI NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 15/60 Day Responses for Wolf CreekBoric Acid
VT-2
Pressure Boundary Leakage
ML0231200247 November 2002Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs GroupMissed surveillance
Recently irradiated fuel
WO 02-0057, October 2002 Monthly Operating Report for Wolf Creek Generating Station7 November 2002October 2002 Monthly Operating Report for Wolf Creek Generating Station
ML0231102706 November 2002TS Pages-Wolf Creek Amendment No. 149Offsite Dose Calculation Manual
Fire Protection Program
TAC:MB57256 November 2002
ML0231706286 November 2002Issuance of Amendment 149 Generic Personnel Titles in Administrative Controls Tac. MB5725Offsite Dose Calculation Manual
ET 02-0049, Containment Inservice Inspection Program First Interval, First Period Owner'S Activity Reports4 November 2002Containment Inservice Inspection Program First Interval, First Period Owner'S Activity Reports
ET 02-0048, Supplemental Information for Inservice Inspection Program Alternative for Limited Examination on Feedwater Nozzle to Steam Generator Shell Weld, Relief Request L2R-234 November 2002Supplemental Information for Inservice Inspection Program Alternative for Limited Examination on Feedwater Nozzle to Steam Generator Shell Weld, Relief Request L2R-23
ML0230905411 November 2002Generic Fundamentals Examination ResultsGeneric Fundamentals Examination
WO 02-0055, Changes to Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan Implementing Procedures and Forms31 October 2002Changes to Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan Implementing Procedures and Forms
ML02311010325 October 2002Comment from D. R. Woodlan on DG-1099, Anchoring Components and Structural Supports in Concrete.Backfit
WO 02-0052, September 2002 Monthly Operating Report for Wolf Creek11 October 2002September 2002 Monthly Operating Report for Wolf Creek
ML02274009010 October 2002STARS-Meeting with Strategic Teaming and Resource Sharing-Integrated Regulatory Affairs Group (Stars-IRAG) for the Licrensees of Callaway, Comanche Peak, Diablo Canyon, Palo Verde, South Texas and Wolf Creek Plants
ML0228005437 October 2002Meeting Notice, Callaway, Comanche Peak, Diablo, Canyon, Palo Verde, South Texas, and Wolf Creek Plants, Meeting with Strategic Teaming and Resources SharingAging Management
ML0225405754 October 2002Relief Request, Inservice Inspection IntervalNon-Destructive Examination
Incorporated by reference
TAC:MB40784 October 2002
IR 05000482/20020044 October 2002IR 05000482-02-004; 06/30/02-09/21/02; Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station. Integrated Resident/Regional Report. Event FollowupPast operability
Temporary Modification
Significance Determination Process
Fire Protection Program
Overexposure
ML0228002312 October 2002Technical Specifications for License Amendment 148, Reactor Trip System Instrumentation
TAC:MB57242 October 2002
ML0222504332 October 2002License Amendment 148, Reactor Trip System Instrumentation
ET 02-0033, Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2.1 October 2002Revision to Technical Specification 3.1.6, Physics Tests Exceptions - Mode 2.Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment