Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TAC:MF010421 December 2012
ML12362A45121 December 2012Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (1) Supplemental Seismic Walkdown Report, Table of Contents Through Attachment (2) Seismic Walkdown Checklists, Page B-90Safe Shutdown
Unanalyzed Condition
Boric Acid
Locked High Radiation Area
Fukushima Dai-Ichi
Seismically rugged
License Renewal
Earthquake
Seismic Walkdown Report
ML12362A44821 December 2012Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. SeismicBoric Acid
Fukushima Dai-Ichi
ML12362A45221 December 2012Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (3) Area Walk-By Checklists Through EndBoric Acid
Aging Management
Scaffolding
ML12346A31118 December 2012R. E. Ginna Nuclear Power Plant - Emergency Action Level Scheme Upgrade (TAC No. ME7730),Internal Flooding
Fuel cladding
ML13037A38017 December 2012Attachment 1b, 2012 Annual Report of the Ceng Independent Nuclear Advisory CommitteeCyber Security
ML12355004017 December 2012ISFSI Decommissioning Funding PlanFitness for Duty
Decommissioning Funding Plan
Authorized possession limits
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12361A04912 December 2012Robert E. Ginna Nuclear Power Plant After Action Report/ Improvement PlanOffsite Circuit
IR 05000244/201230110 December 2012Er 05000244-12-301, October 1, 2012 Through November 28, 2012; R. E. Ginna Nuclear Power Plant, Initial Operator Licensing Examination Report
ML13004A00430 November 2012Kld TR-518, Final Report, Rev. 1, R. E. Ginna Nuclear Power Plant Development of Evacuation Time Estimates
ML12335A02927 November 2012R. E. Ginna - Response to 10CFR50.54(f) Request for Information, Recommendation 2.3 FloodingSafe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Fire Barrier
Hydrostatic
Locked High Radiation Area
Fukushima Dai-Ichi
Tornado Missile Protection
Earthquake
ML12339A25321 November 2012Final Qa/Related Forms (Folder 1)Job Performance Measure
ML12326A46716 November 2012Verification of Information in Aging Management Technical Letter ReportSafe Shutdown
Boric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Weld Overlay
Coatings
VT-2
Aging Management
Foreign Material Exclusion
Flow Accelerated Corrosion
Stress corrosion cracking
Eddy Current Testing
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
Biofouling
EVT-1
Through-Wall Leak
Through-Wall Leakage
Preliminary White Finding
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
Thermography
Thermal fatigue
ML12339A2579 November 2012Post Exam Comments, Resolution, and Technical References (Folder 1)Offsite Dose Calculation Manual
ML12314A3758 November 2012R. E. Ginna Nuclear Power Plant, Transmittal of Core Operating Limits Report (COLR)Shutdown Margin
IR 05000244/20120095 November 2012IR 05000244-12-009; 09/10/2012 - 09/28/2012; R.E. Ginna Nuclear Power Plant; Triennial Fire Protection InspectionHot Short
Safe Shutdown
Fire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Emergency Lighting
Significance Determination Process
Hemyc
Fire Protection Program
Fire Watch
Power Uprate
IR 05000317/20120081 November 2012Notice of Violation - Constellation Energy Nuclear Group MEMO
IR 05000244/20120071 November 2012Notice of Violation - Constellation Energy Nuclear Group MEMO
ML12213A1821 November 2012Notice of Violation - Constellation Energy Nuclear Group Memo
IR 05000220/20120081 November 2012Notice of Violation - Constellation Energy Nuclear Group MEMO
ML12311A01726 October 2012Initial Status Report in Response to Commission Order Modifying Licenses with Regard to Requirements for Mitigation StrategiesFLEX
ML12311A01526 October 2012Initial Status Report in Response to Commission Order Modifying Licenses with Regard to Requirements for Reliable SpentSpent Fuel Pool Instrumentation
ML12306A23325 October 2012R.E. Ginna Nuclear Power Plant, Response to NRC Bulletin 2012-01Open Phase Condition
Offsite Circuit
IR 05000244/201200423 October 2012IR 05000244-12-004; 07/01/2012 - 09/30/2012, R.E. Ginna Nuclear Power Plant, LLC, (Ginna), Routine Integrated Inspection ReportOffsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Enforcement Discretion
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Operability Determination
Annual Radiological Effluent Release Report
Offsite Circuit
ML12296A10823 October 2012Relief Request lSl-07 and lSl-08 Proposed Alternative Reactor Vessel Head Penetration Nozzle Examinations for Fifth Interval of Inservice Inspection ProgramBoric Acid
High Radiation Area
Incorporated by reference
ML12299A47123 October 2012Response to Request for Additional Information Regarding Bottom Mounted Instrument Nozzle Flaw Evaluation
ML12356A34618 October 2012NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2)
ML12356A37618 October 2012Draft Operating Exam (Sections a, B, and C) Folder 2)Boric Acid
Shutdown Margin
High Radiation Area
Stroke time
Post Accident Monitoring
Job Performance Measure
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
ML12356A33218 October 2012NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML12356A36918 October 2012Draft Written Exam (Folder 2)Boric Acid
Shutdown Margin
High Radiation Area
Locked High Radiation Area
Power change
ML12332A09718 October 2012Final Outlines (Folder 3)Boric Acid
Shutdown Margin
Locked High Radiation Area
ML12332A10718 October 2012Final Written Examination with Answer Key (401-5 Format) (Folder 2)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Locked High Radiation Area
Scaffolding
Power change
ML12291A01917 October 2012Initial Operator Licensing Written Exam Approval (R. E. Ginna Nuclear Power Plant, Unit 1)
ML12290A02816 October 2012R. E. Ginna Nuclear Power Plant - Relief Request to No. ISI-09 Authorization of Alternative for Component Cooling Water 1 Inch Half Coupling Weld LeakIncorporated by reference
Earthquake
Dissimilar Metal Weld
ML12277A09012 October 2012Technical Letter Report on Aging Management Program Audits at Ginna and Nine Mile Point 1Safe Shutdown
Boric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Weld Overlay
Coatings
VT-2
Aging Management
Foreign Material Exclusion
Flow Accelerated Corrosion
Stress corrosion cracking
Eddy Current Testing
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
Biofouling
EVT-1
Through-Wall Leak
Through-Wall Leakage
Preliminary White Finding
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
Thermography
Thermal fatigue
ML12285A3595 October 2012R. E. Ginna Nuclear Power Plant - Response to Request for Additional Information Regarding Relief Request ISI-08 Examination of Reactor Pressure Vessel Upper Head Penetration NozzlesBoric Acid
Pressure Boundary Leakage
Pressure boundary leak
ML12276A3362 October 2012September 19, 2012 - Summary of a Public Meeting to Discuss Constellation Energy Nuclear Group, LLC (Ceng) Fleet Performance
ML12332A1101 October 2012Final Operating Exam (Sections a, B, and C) (Folder 3)Boric Acid
Shutdown Margin
High Radiation Area
Stroke time
Post Accident Monitoring
Job Performance Measure
Deep Dose Equivalent
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage