Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09005002729 December 2008Fourth Ten Year Inservice Inspection Interval Request for Relief No. 08-ON-002VT-2
TAC:ME075229 December 2008
ML09002030722 December 2008License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 11Exclusive Use
Affidavit
ML09002035522 December 2008Proposed License Amendment Request to Revise Current Licensing Basis for HELB Events Outside of the Containment Building Unit 2; License Amendment Request No. 2008-006Safe Shutdown
Boric Acid
Internal Flooding
Flow Accelerated Corrosion
Earthquake
GOTHIC
ML09013016322 December 2008NRC Inspection Report, Preliminary Greater than Green Finding
ML09002035822 December 2008Figures 5.1-9, Moisture Separator Reheater Drain System Though 5.1-12, Steam Seal Header System.
ML09002035622 December 2008Figures 5.1-3, Extraction Steam System Through 5.1-8, Main Steam System.
ML08365028822 December 2008Duke Energy Carolinas, LLC - Revised Request for Schedule Relief
ML08330042716 December 2008Summary of Closed Meeting to with Duke Energy Carolinas, LLC to Discuss the August 15, 2008, 50.54(f) Letter on External FloodingB.5.b Mitigating Strategies
Backfit
ML09111026915 December 2008Initial Examination 2009-301 General Correspondence
ML08347002211 December 2008Slides, Category 2 Public Meeting Digital Instrumentation and Control Steering CommitteeCyber Security
Power Uprate
ML08351008810 December 2008Technical Specification Bases (Tsb) ChangeSafe Shutdown
Reactor Vessel Water Level
Post Accident Monitoring
ML0834702469 December 2008Submittal of Auxiliary Service Water System Outage Report
ML13057A6174 December 2008Draft Agenda Nrc/Duke Energy Technical Meeting on Oconee Site Inundation Analysis
ML0834001814 December 2008NFPA 805 Pilot License Amendment Request Review and Infrastructure Update
ML13057A6163 December 2008E-Mail from Robert Schaaf to Melanie Galloway, Threshold for Consideration of External Events in Design-Basis
ML14058A0472 December 2008Email from R. Schaaf, NRR to J. Circle, NRR Meeting with FERC Concerning Oconee
ML14058A03126 November 2008DHS Briefing on Oconee Flood Protection and the Jocassee Dam HazardBackfit
ML08345071625 November 2008Supplemental Response to Request for Additional Information Associated with Cyber Security Features, of the Oconee Reactor Protective System and Engineered Safeguards Protective System Digital UpgradeCyber Security
ML08326030524 November 2008Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing
ML08326025824 November 2008FRN: Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing
ML08326040421 November 2008Enclosure - SDP Phase 3 AnalysisFitness for Duty
Slow transfer
Time to boil
Probabilistic Risk Assessment
Significance Determination Process
IR 05000269/200801021 November 2008IR 05000269-08-010, IR 05000270-08-010, & IR 05000287-08-010 on 06/30/2008, for OconeeSignificance Determination Process
ML08336003220 November 2008Summary Ultrasonic Examination Results of CompletedWeld Overlay
DM weld
ML08329050220 November 2008Part 21 Report - 18 Valve Assembly Bearings Not Dedicated PartsCommercial Grade
ML08346053419 November 2008License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 10Exclusive Use
Affidavit
ML08333027618 November 2008Revision to Tornado/Helb Mitigation Strategies and Regulatory CommitmentsSafe Shutdown
Tornado Missile
TORMIS
Earthquake
Liquid penetrant
ML13057A61514 November 2008E-Mail from Raman Pichumani to Kamal Manoly, a Brief Summary of Telecom with FERC
ML13057A61414 November 2008Agenda Conference Call with FERC
ML08325045213 November 2008Core Operating Limits Report (Colr), Cycle 24, Rev. 28Shutdown Margin
ML08295036112 November 2008Safety Evaluation for Oconee Nuclear Station, Units 1, 2, and 3 Third 10-Year Inservice Inspection Interval Request for Relief No. 04-ON-012, Revision 1 End of Interval System Pressure TestHydrostatic
VT-2
Incorporated by reference
ML13057A61312 November 2008Agenda Oconee Flood Issue, Technical Staff Meeting
TAC:MD860512 November 2008
ML08323005012 November 2008Technical Specification Bases (Tsb) ChangeSafe Shutdown
Offsite Circuit
ML08309007412 November 2008Summary of Category 2 Public Meeting Held to Discuss National Fire Protection Association Standard 805 Pilot Plant Process: Current Lessons Learned from the Pilot License Amendment Request Reviews (TAC Nos. MD8807, MD8832, MD8833, & MD8834)Enforcement Discretion
Fire Protection Program
ML08308045312 November 2008Trip Report for U.S. Nuclear Commission (NRC) Staff'S Oconee Nuclear Station, Units 1, 2, and 3 (Oconee) - Thread Audit at Areva for Digital Upgrade of the Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps)
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
ML08282059310 November 2008Issuance of Amendments Regarding Alloy 600 Concerns in the Pressurizer (TAC Nos. MD9389, MD9390, and MD9391)Boric Acid
Stress corrosion cracking
ML0831900466 November 2008Response to Request for Additional Information Associated with Cyber Security Features of Reactor Protective System and Engineered Safeguards Protective System Digital UpgradeCyber Security
ML0831106946 November 2008September 10, 2008, Oconee Generic Fundamentals Examination Section LetterGeneric Fundamentals Examination
ML13057A6125 November 2008NRC Meeting with Duke Energy Carolinas, LLC Briefing Slides on Oconee Site Flood Protection
IR 05000269/200800429 October 2008IR 05000269-08-004, 05000270-08-004, 05000287-08-004, on 07/01/2008 - 09/30/2008, Oconee Nuclear Station, Units 1, 2, and 3, Routine Integrated Inspection ReportSafe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Stroke time
Weld Overlay
Probabilistic Risk Assessment
Temporary Modification
Locked High Radiation Area
Aging Management
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Stress corrosion cracking
Annual Radiological Effluent Release Report
Liquid penetrant
Dissimilar Metal Weld
DM weld
Thermal fatigue
ML08280040829 October 2008Issuance of Amendments No. 362, 364, & 363 Regarding Use of Areva Np Mark-B-HTP Fuel (TAC MD7050, MD7051, and MD7052)Post Accident Monitoring
Nondestructive Examination
Earthquake
Fuel cladding
ML08309010429 October 2008Management Change Update for Distribution Lists Purposes
ML08296007029 October 2008Issuance of Amendments Regarding Water Hammer ConcernsUltimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Earthquake
Power Operated Valves
ML09104021428 October 2008Calculation No. OSC-9314, Rev. 0, NFPA 805 Transition Risk-Informed, Performance-Based Change Evaluation Methodology.Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
NFPA 805
Large early release frequency
Power Operated Valves
Fire Protection Program
ML08290008628 October 2008Wtihholding of Information from Public Disclosure, TAC Nos. MD7050, MD7051, and MD7052Affidavit
ML08308008928 October 2008License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number 2007-09, Supplement 9Coast down
Exclusive Use
Affidavit
ML08302029727 October 2008Site, Units 1, 2, & 3, Requests for Additional Information for Proposed License Amendment Request to Revise the Technical Specifications for Areva Np Mark-B-HTP Fuel and for Methodology Report DPC-NE-2015-P
ML08289009827 October 2008(Catawba); McGuire Nuclear Station, Units 1 and 2 (Mcguire); Oconee Nuclear Station, Units 1, 2, and 3 (Oconee)- Closeout of Generic Letter 2007-01 Inaccessible of Underground Power Cable Failures That Disable Accid