ML13057A613
Jump to navigation
Jump to search
| ML13057A613 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/12/2008 |
| From: | Office of Information Services |
| To: | |
| References | |
| FOIA/PA-2012-0325 | |
| Download: ML13057A613 (1) | |
Text
Agenda Oconee Flood Issue Technical Staff Meeting - 11112/08 (0900-1000)
Purpose Plan the upcoming technical meeting between NRC, Duke, and other stakeholders.
Discuss parameters for licensee to consider for the upcoming technical meeting.
Discuss areas to cover for a site visit.
Discussion Topics
- 1. Summary of Duke Management meeting of 11/5/08
- a. Impressions
- b. Path forward
- 2.
Inundation study concerns
- a. Breach size
- b. Timing
- c. Modeling technique (1-D vs. 2-D).
- 3. Seismic-analysis concerns
- a.
Soil liquefaction
- b. Embankment seepage
- c. Seismic curves
- 4. Weather
- a. PMP
- 5. Dam failure frequency concerns
- a. Fault tree modeling.
- b. Spillway design.-
- c. Inspections'"
- 6. Site visit
- a. Walkdown of Jocassee Dam.
- b. Review the purchasing spec. for the watertight doors?
- c. Discuss the scope of the engineering support mods. for watertight doors.
- 7. Inter-agency and contractors
- a. FERC involvement
- b. Review from DOI - Bureau of Reclamation
- c. Possible contractors to RES.
- 8. Preparation of meeting -with Duke (Oconee and Duke Hydro) technical staff
- 9. Briefing NRC (NRR) management
- a. Planned call between Duke and NRC management
- 10. Next Meeting